Sign up now with your company or organization email and enjoy a
1-week free trial!
Contract Details
Title |
Work With Black And Minority Ethnic Communities And Faith Groups On Behalf Of The National Adoption Campaign \ 1 United Kingdom |
|||
---|---|---|---|---|
You can sign up and unlock it for freeAccess to Public and Private Sector Business Opportunities for 200+ Countries |
||||
Country | ||||
Language | English | |||
Organization | ||||
Published Date | 10.03.2024 | |||
Awarded Date | 27.10.2020 | |||
Overview | Contract Award's Details : Work With Black And Minority Ethnic Communities And Faith Groups On Behalf Of The National Adoption Campaign 1 Leeds City Council Department: Childrens Services Title:Ms Michelle Whippey Email Address: Michelle.Whippey@Leeds.Gov.Uk Telephone Number: 0113 3785422 Thames Tideway Tunnel - C405 Main Works West - Underground Structure to Ventilation Building at Hammersmith The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street. The geographic layout of the Project and local authorities through which it passes is shown in Figure 1. The Project comprises: a. tunnels: i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel. b. Worksites: i. five main tunnel Worksites (drive and/or reception sites) ii. 16 CSO Worksites iii. two System modification Worksites Thames Tideway Tunnel iv. works at Beckton Sewage Treatment works. Scope of Works The Hammersmith Pumping Station (HAMPS) Inlet Channel forms part of the infrastructure for a live sewage pumping station. It will remain operational throughout the duration of the Main Contract works. This is a gravity-fed storm relief pumping station, with no physical or mechanical means of isolating the two sewers entering the Inlet Channel wet weather, thus all works are weather-dependent. In order to ensure safety of the working teams, the Contractor has implemented a series of real-time catchment sewer monitoring along with computer modelling and weather forecast modelling tools which form part of the safe system of works (details can be provided on request). Within the Inlet Channel, two temporary weir walls were installed, which are interconnected with a series of flumes to divert the flows through the works area (referred to as dry zone), effectively creating a cofferdam within the sewer environment. Returned quotations will be evaluated by BMB JV& 039;s (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams. Quotations will be evaluated based on; Cost Timeliness of return Adherence to and demonstration of understanding of the drawings and specifications provided at this point. Provision of accurate product specifications to accompany the quotation. Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest. Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail. United Kingdom Contract value : 100,000.00 GBP Contractors : HOME FOR GOOD See in details 28/10/2020 31/01/2021 76872256 11/11/2020 BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Address : 130 Wilton Road SW1V1LQ, London colin smith colin.smith@tideway-west.london 07976181302 United Kingdom United Kingdom Contract Awards United Kingdom ocds-b5fd17-0e35aa73-46ef-4887-af66-355cd17b1673-392642-c4a49138724 See in details 31/01/2021 See in details | |||
NAICS |
Specialized Freight (except Used Goods) Trucking
Electric Power Transmission
Other Foundation
Other Foundation
Ventilation
Executive and Legislative Offices
Highway
Architectural
Highway
Military Armored Vehicle
Highway
Foundation
Research and Development in the Physical
Environment
General Freight Trucking
Executive and Legislative Offices
Dry
Ventilation
Research and Development in the Physical
Boiler
|
|||
CPVS |
Dried, salted, smoked or seasoned meat
Parts of pumps, compressors, engines or motors
Tools
Parts of structures
Earthmoving and excavating machinery, and associated parts
Tanks
Tanks, reservoirs, containers and pressure vessels
Construction work for pipelines, communication and power lines, for highways, roads, airfields and ra...
System, storage and content management software package
Mains
Control, safety, signalling and light equipment
Construction, foundation and surface works for highways, roads
Engineering, auxiliary, average, loss, actuarial and salvage insurance services
Control, safety or signalling equipment for inland waterways
Parts of computers
Tanks, reservoirs and containers; central-heating radiators and boilers
Safes
Tunnelling works
Sewage work
Safety cases
Other community, social and personal services
Control, safety or signalling equipment for parking facilities
Construction work for engineering works except bridges, tunnels, shafts and subways
Command, control, communication systems
Structures and parts
Pumps
Foundation work for highways, roads, streets and footpaths
Construction work for highways, roads
Control, safety or signalling equipment for port installations
Dry goods
Command, control, communication and computer systems
System, storage and content management software development services
Forms
Transfers
Monitors
Sewage, refuse, cleaning and environmental services
Pressure-reducing, control, check or safety valves
Other services
Seats, chairs and related products, and associated parts
Control, safety or signalling equipment for roads
Approval plans, working drawings and specifications
Sewage treatment works
Designs
Tool parts
Control, safety or signalling equipment for airports
Tools, locks, keys, hinges, fasteners, chain and springs
|
|||
UNSPSC |
-
|
|||
Regions | ||||
Sectors |
Civil Works
Building
Environment and Pollution-Recycling
Automobiles and Auto Parts
Non-Renewable Energy
Supply
Bridges and Tunnels
Engineering
Roads and Highways-Bridge
Infrastructure
Law and Legal
Printing and Publishing
Services
Railways-Rail-Railroad
Defence and Security
Electricity
Infrastructure and Tunnels
Construction
Energy-Power and Electrical
Computer Hardwares and Consumables
Steel
Building Material
Marine
|
|||
Contractor | ||||
Contract Value |
See in details
|
URL | ||
Share |
Title |
---|
Work With Black And Minority Ethnic Communities And Faith Groups On Behalf Of The National Adoption Campaign \ 1 United Kingdom |
Country |
Language |
English |
Organization |
Published Date |
10.03.2024 |
Awarded Date |
27.10.2020 |
Overview |
Contract Award's Details : Work With Black And Minority Ethnic Communities And Faith Groups On Behalf Of The National Adoption Campaign 1 Leeds City Council Department: Childrens Services Title:Ms Michelle Whippey Email Address: Michelle.Whippey@Leeds.Gov.Uk Telephone Number: 0113 3785422 Thames Tideway Tunnel - C405 Main Works West - Underground Structure to Ventilation Building at Hammersmith The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street. The geographic layout of the Project and local authorities through which it passes is shown in Figure 1. The Project comprises: a. tunnels: i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel. b. Worksites: i. five main tunnel Worksites (drive and/or reception sites) ii. 16 CSO Worksites iii. two System modification Worksites Thames Tideway Tunnel iv. works at Beckton Sewage Treatment works. Scope of Works The Hammersmith Pumping Station (HAMPS) Inlet Channel forms part of the infrastructure for a live sewage pumping station. It will remain operational throughout the duration of the Main Contract works. This is a gravity-fed storm relief pumping station, with no physical or mechanical means of isolating the two sewers entering the Inlet Channel wet weather, thus all works are weather-dependent. In order to ensure safety of the working teams, the Contractor has implemented a series of real-time catchment sewer monitoring along with computer modelling and weather forecast modelling tools which form part of the safe system of works (details can be provided on request). Within the Inlet Channel, two temporary weir walls were installed, which are interconnected with a series of flumes to divert the flows through the works area (referred to as dry zone), effectively creating a cofferdam within the sewer environment. Returned quotations will be evaluated by BMB JV& 039;s (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams. Quotations will be evaluated based on; Cost Timeliness of return Adherence to and demonstration of understanding of the drawings and specifications provided at this point. Provision of accurate product specifications to accompany the quotation. Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest. Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail. United Kingdom Contract value : 100,000.00 GBP Contractors : HOME FOR GOOD See in details 28/10/2020 31/01/2021 76872256 11/11/2020 BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Address : 130 Wilton Road SW1V1LQ, London colin smith colin.smith@tideway-west.london 07976181302 United Kingdom United Kingdom Contract Awards United Kingdom ocds-b5fd17-0e35aa73-46ef-4887-af66-355cd17b1673-392642-c4a49138724 See in details 31/01/2021 See in details |
NAICS |
Specialized Freight (except Used Goods) Trucking Electric Power Transmission Other Foundation Other Foundation Ventilation Executive and Legislative Offices Highway Architectural Highway Military Armored Vehicle Highway Foundation Research and Development in the Physical Environment General Freight Trucking Executive and Legislative Offices Dry Ventilation Research and Development in the Physical Boiler |
CPVS |
Dried, salted, smoked or seasoned meat Parts of pumps, compressors, engines or motors Tools Parts of structures Earthmoving and excavating machinery, and associated parts Tanks Tanks, reservoirs, containers and pressure vessels Construction work for pipelines, communication and power lines, for highways, roads, airfields and ra... System, storage and content management software package Mains Control, safety, signalling and light equipment Construction, foundation and surface works for highways, roads Engineering, auxiliary, average, loss, actuarial and salvage insurance services Control, safety or signalling equipment for inland waterways Parts of computers Tanks, reservoirs and containers; central-heating radiators and boilers Safes Tunnelling works Sewage work Safety cases Other community, social and personal services Control, safety or signalling equipment for parking facilities Construction work for engineering works except bridges, tunnels, shafts and subways Command, control, communication systems Structures and parts Pumps Foundation work for highways, roads, streets and footpaths Construction work for highways, roads Control, safety or signalling equipment for port installations Dry goods Command, control, communication and computer systems System, storage and content management software development services Forms Transfers Monitors Sewage, refuse, cleaning and environmental services Pressure-reducing, control, check or safety valves Other services Seats, chairs and related products, and associated parts Control, safety or signalling equipment for roads Approval plans, working drawings and specifications Sewage treatment works Designs Tool parts Control, safety or signalling equipment for airports Tools, locks, keys, hinges, fasteners, chain and springs |
UNSPSC |
- |
Regions |
Europe Northern Europe |
Sectors |
Civil Works Building Environment and Pollution-Recycling Automobiles and Auto Parts Non-Renewable Energy Supply Bridges and Tunnels Engineering Roads and Highways-Bridge Infrastructure Law and Legal Printing and Publishing Services Railways-Rail-Railroad Defence and Security Electricity Infrastructure and Tunnels Construction Energy-Power and Electrical Computer Hardwares and Consumables Steel Building Material Marine |
Contractor |
Contract Value |
See in details
|
URL |
|
Share |
To be notified
when a tender matching your filter is
published
To Follow
Tenders
Add New Tender Alert
To Follow
Contracts
Add New Contract Alert
To Follow
Fairs
Add New Fair Alert
Similar Contracts