Subscribe Now For Just $36.75 Instead Of $49 Enjoy 1 Month Of Unlimited Access At A 25% Discount And Save $12.25. Don’t Miss Out – Use Your Discount Code Today !
1W4MO5IH
Click Here
Contract Details
Title |
Construction Stylidas sewage pipeline in E.E.L Lamia. Greece |
|||
---|---|---|---|---|
You can sign up and unlock it for freeAccess to Public and Private Sector Business Opportunities for 200+ Countries |
||||
Country | ||||
Language | English | |||
Organization | ||||
Published Date | 19.04.2024 | |||
Awarded Date | 26.10.2015 | |||
Overview | Contract Award's Details : Construction Stylidas sewage pipeline in E.E.L Lamia. Dimotiki Epicheirisi Ydreysis - Apocheteysis Lamias (DEYAL) K. Karamanli kai Zafeiri Contact point (s): Dimotiki Epicheirisi Ydreysis - Apocheteysis Lamias (DEYAL) For the attention of: Theodoros Chadoylis 351 00 Lamia GREECE Construction Stylidas sewage pipeline in E.E.L Lamia. Contract award: Construction Stylidas sewage pipeline in E.E.L Lamia. Technical description plumbing work. Proposed projects involving construction Central Sewerage pipeline and three pumping stations to bring the sewage of settlements Stylidas, Agia Marina to the existing WWTP Lamia. In particular, they include: 1. The pumping Stylidas A / S 0, which receives effluent Stylidas. From this, the waste water pushed up the pumping station of Ag. Marina A / S 1 via twin discharge pipe F. diameter 160 mm and a total length of 3 900 m. (2 * 1 950 m). 2. The pumping station Ag. Marina A / S 1, which receives effluent Stylidas and waste of Ag. Marina. From this, the waste water being pushed through twin discharge pipe F180 mm total length 7 650 m. (2 * 3 825 m) as the shaft end (VAT) in position B1 and then by natural flow, pump until the next A / S2 via gravity pipeline diameter F 355 mm and a total length of 1 320 m. 3. The pumping station A / S 2, which will receive all the sewage of the three settlements. Since sewage pushed up the shaft input of WWTP Lamia through twin discharge pipe F 200 mm in diameter and a total length of 14 930 m. (2 * 7 465 m) Therefore the total length of the gravity pipeline is L = 1 320 m and the total length of the discharge pipe is L = 13 240 m.To cable length overall very Lol = 14 560 m The pressure pipes are made of high density polyethylene pipes (PE100) strong resistance 10 atm. connected together and to the wells by welding. In these tubes is limited entry groundwater and additionally satisfactorily withstand mechanical shocks and pressures. Pipes and fittings made of high density polyethylene (PE100) will be constructed in accordance with the Technical Specifications. The total length of the depressed conductors clear 26 480 m. The gravitational pipeline (length 1 320 m.) Will be constructed from material U - PVC row 41. The outer surfaces will be smooth without bubbles, cavities etc. The internal surfaces are smooth. The pumping station will consist of a basement, comprising fluid inlet chamber and retention of solid, fluid pumping chamber, dry place installation of pumps and valve stations and the ground (s) area (s) of installation of electrical panels, generator set, hoist, ventilation fans, deodorizing units Others electromechanical equipment. Considering the depth of excavation for the foundation of the pumping station shows the need to construct an appropriate perimeter retaining implemented with continuously infused septal elements of reinforced concrete C20 / 25 reinforced with steel B500c, depth h = 10 m. and a thickness of 0,60 m, which provide better tightness controlled conditions. Correspondingly, the chambers of the basement, the attic and the skeleton of the ground floor will also be constructed of reinforced concrete C20 / 25 reinforced with steel B500c. The filling of concrete ele Greece Contract value : See in details Contractors : BROS PAPAIOANNOU SA See in details 27/10/2015 27/01/2016 10073389 27/10/2015 Dimotiki Epicheirisi Ydreysis - Apocheteysis Lamias (DEYAL) K. Karamanli kai Zafeiri Contact point (s): Dimotiki Epicheirisi Ydreysis - Apocheteysis Lamias (DEYAL) For the attention of: Theodoros Chadoylis 351 00 Lamia GREECE Address : Greece Greece Contract Awards Greece 378438-2015 See in details 27/01/2016 See in details | |||
NAICS | ||||
CPVS |
Dried, salted, smoked or seasoned meat
Welding
Parts of pumps, compressors, engines or motors
Foundation work
Microscope eyepieces, condensers, collectors, tubes, stages and covers
Generators
Construction, foundation and surface works for highways, roads
Sewerage work
Pipes
Cable
Parts of fans
Wells construction work
Valve parts
Fans
Lifts, skip hoists, hoists, escalators and moving walkways
Sewage work
Construction work
Machinery for cleaning, filling, packing or wrapping bottles or other containers
Fittings
Pumps
Concrete
Dry goods
Concrete work
Parts of dishwashing machines and of machines for cleaning, filling, packing or wrapping
Vats
Hoists
Sewage, refuse, cleaning and environmental services
Panels
Electromechanical equipment
Cable, wire and related products
Steel
Repair and maintenance services for pumps, valves, taps and metal containers and machinery
Pipelines
Goods used in construction
Electrical, electromagnetic and mechanical treatment
Pipeline, piping, pipes, casing, tubing and related items
Architectural, construction, engineering and inspection services
Cable TV
Conductors
Shafts
Repair and maintenance services of pumps, valves, taps and metal containers
|
|||
UNSPSC | ||||
Regions | ||||
Sectors |
Civil Works
Pipeline Project
Environment and Pollution-Recycling
Automobiles and Auto Parts
Non-Renewable Energy
Supply
Postal and Courier Services
Roads and Highways-Bridge
Infrastructure
Printing and Publishing
Cement and Asbestos Products
Defence and Security
Electricity
Construction
Energy-Power and Electrical
Computer Hardwares and Consumables
Steel
Construction Materials
Marine
|
|||
Contractor | ||||
Contract Value |
See in details
|
URL | ||
Share |
Title |
---|
Construction Stylidas sewage pipeline in E.E.L Lamia. Greece |
Country |
Language |
English |
Organization |
Published Date |
19.04.2024 |
Awarded Date |
26.10.2015 |
Overview |
Contract Award's Details : Construction Stylidas sewage pipeline in E.E.L Lamia. Dimotiki Epicheirisi Ydreysis - Apocheteysis Lamias (DEYAL) K. Karamanli kai Zafeiri Contact point (s): Dimotiki Epicheirisi Ydreysis - Apocheteysis Lamias (DEYAL) For the attention of: Theodoros Chadoylis 351 00 Lamia GREECE Construction Stylidas sewage pipeline in E.E.L Lamia. Contract award: Construction Stylidas sewage pipeline in E.E.L Lamia. Technical description plumbing work. Proposed projects involving construction Central Sewerage pipeline and three pumping stations to bring the sewage of settlements Stylidas, Agia Marina to the existing WWTP Lamia. In particular, they include: 1. The pumping Stylidas A / S 0, which receives effluent Stylidas. From this, the waste water pushed up the pumping station of Ag. Marina A / S 1 via twin discharge pipe F. diameter 160 mm and a total length of 3 900 m. (2 * 1 950 m). 2. The pumping station Ag. Marina A / S 1, which receives effluent Stylidas and waste of Ag. Marina. From this, the waste water being pushed through twin discharge pipe F180 mm total length 7 650 m. (2 * 3 825 m) as the shaft end (VAT) in position B1 and then by natural flow, pump until the next A / S2 via gravity pipeline diameter F 355 mm and a total length of 1 320 m. 3. The pumping station A / S 2, which will receive all the sewage of the three settlements. Since sewage pushed up the shaft input of WWTP Lamia through twin discharge pipe F 200 mm in diameter and a total length of 14 930 m. (2 * 7 465 m) Therefore the total length of the gravity pipeline is L = 1 320 m and the total length of the discharge pipe is L = 13 240 m.To cable length overall very Lol = 14 560 m The pressure pipes are made of high density polyethylene pipes (PE100) strong resistance 10 atm. connected together and to the wells by welding. In these tubes is limited entry groundwater and additionally satisfactorily withstand mechanical shocks and pressures. Pipes and fittings made of high density polyethylene (PE100) will be constructed in accordance with the Technical Specifications. The total length of the depressed conductors clear 26 480 m. The gravitational pipeline (length 1 320 m.) Will be constructed from material U - PVC row 41. The outer surfaces will be smooth without bubbles, cavities etc. The internal surfaces are smooth. The pumping station will consist of a basement, comprising fluid inlet chamber and retention of solid, fluid pumping chamber, dry place installation of pumps and valve stations and the ground (s) area (s) of installation of electrical panels, generator set, hoist, ventilation fans, deodorizing units Others electromechanical equipment. Considering the depth of excavation for the foundation of the pumping station shows the need to construct an appropriate perimeter retaining implemented with continuously infused septal elements of reinforced concrete C20 / 25 reinforced with steel B500c, depth h = 10 m. and a thickness of 0,60 m, which provide better tightness controlled conditions. Correspondingly, the chambers of the basement, the attic and the skeleton of the ground floor will also be constructed of reinforced concrete C20 / 25 reinforced with steel B500c. The filling of concrete ele Greece Contract value : See in details Contractors : BROS PAPAIOANNOU SA See in details 27/10/2015 27/01/2016 10073389 27/10/2015 Dimotiki Epicheirisi Ydreysis - Apocheteysis Lamias (DEYAL) K. Karamanli kai Zafeiri Contact point (s): Dimotiki Epicheirisi Ydreysis - Apocheteysis Lamias (DEYAL) For the attention of: Theodoros Chadoylis 351 00 Lamia GREECE Address : Greece Greece Contract Awards Greece 378438-2015 See in details 27/01/2016 See in details |
NAICS |
Marinas Overhead Traveling Crane Other Foundation Other Foundation Ventilation Plumbing Construction Scenic and Sightseeing Transportation Machinery Agriculture Plumbing Foundation Dry Ventilation Water Construction Plastics Pipe |
CPVS |
Dried, salted, smoked or seasoned meat Welding Parts of pumps, compressors, engines or motors Foundation work Microscope eyepieces, condensers, collectors, tubes, stages and covers Generators Construction, foundation and surface works for highways, roads Sewerage work Pipes Cable Parts of fans Wells construction work Valve parts Fans Lifts, skip hoists, hoists, escalators and moving walkways Sewage work Construction work Machinery for cleaning, filling, packing or wrapping bottles or other containers Fittings Pumps Concrete Dry goods Concrete work Parts of dishwashing machines and of machines for cleaning, filling, packing or wrapping Vats Hoists Sewage, refuse, cleaning and environmental services Panels Electromechanical equipment Cable, wire and related products Steel Repair and maintenance services for pumps, valves, taps and metal containers and machinery Pipelines Goods used in construction Electrical, electromagnetic and mechanical treatment Pipeline, piping, pipes, casing, tubing and related items Architectural, construction, engineering and inspection services Cable TV Conductors Shafts Repair and maintenance services of pumps, valves, taps and metal containers |
UNSPSC |
Hoists Ventilation Fans Valves Pumps Awards Water Equipment cases Surface Pipeline Pumping station Shafts Water, sanitation and hygiene kits Water, sanitation and hygiene kit Water, sanitation and hygiene kits Suction pump, electrical |
Regions |
Europe Southern Europe Western Europe |
Sectors |
Civil Works Pipeline Project Environment and Pollution-Recycling Automobiles and Auto Parts Non-Renewable Energy Supply Postal and Courier Services Roads and Highways-Bridge Infrastructure Printing and Publishing Cement and Asbestos Products Defence and Security Electricity Construction Energy-Power and Electrical Computer Hardwares and Consumables Steel Construction Materials Marine |
Contractor |
Contract Value |
See in details
|
URL |
|
Share |
To be notified
when a tender matching your filter is
published
To Follow
Tenders
Add New Tender Alert
To Follow
Contracts
Add New Contract Alert
To Follow
Fairs
Add New Fair Alert
Similar Contracts