Only curious? Unlock 1-Month Premium Free Trial Plan!
Project News Details
Title:
Djibouti - Ethiopia Djibouti Second Power Interconnection Project, Phase II - Djibouti Part
Detail:
The proposed project marks a new milestone in boosting regional integration in Eastern Africa, particularly in the Horn of Africa sub-region by enhancing cross-border trade in electricity. The 1st Ethiopia-Djibouti Interconnection project has been operational for the last 10 years and the power exchange between the two countries also increased within the same period from 155 GWh in 2011 to 532 GWh in 2020. Since the first interconnector was commissioned, in addition to the increase in demand in Djibouti, the industrial and railway line development around Dire Dawa in Ethiopia introduced transmission network congestion problems. Hence, the proposed Ethiopia-Djibouti 230 kV second transmission interconnection from Semera (Ethiopia) to Nagad (Djibouti) is the best option to increase by more than 30% the clean and relatively cheaper power supply to Djibouti and allow Ethiopia to increase foreign exchange revenue from power trade while reducing the amount of fossil fuelgenerated electricity in Djibouti. This project involves (i) the construction of 230 kV double circuit Transmission Line from Semera (Ethiopia) to Nagad (Djibouti). The line length is 292 km (102 km in Ethiopia and 190 km in Djibouti). Each circuit will have a rated power transfer capacity of 160 MW (ii) an extension of the existing Semera 230 kV Substation (Ethiopia) and extension of 230/63/20 kV substation at Nagad (Djibouti, (iii) strengthening of the existing 230 Kv transmission line between Kombolcha-Mile to Semera, 170 km long; and construction of 230 kV new substation at Mile and extension of Kombolocha and Semera existing 230 kV substations (Ethiopia), (iv) Last mile connection in Djibouti; (v) Technical Assistance and Capacity Building on Master Plan study and Power Trade Agreements and creating strong trading units in EEP (« Ethiopian Electric Power ») and EdD (« Electricite de Djibouti »). It will be implemented over a period of 48 months.
Country:
Source:
African Development Bank Group
Published Date:
06.07.2021
URL:
Regions:
Project News Details
| Title |
Djibouti - Ethiopia Djibouti Second Power Interconnection Project, Phase II - Djibouti Part |
|||
|---|---|---|---|---|
3 Month Special Offer — Get 1 Month FreePay for 2 months, use 3 months. Unlimited premium access. |
||||
| Detail |
The proposed project marks a new milestone in boosting regional integration in Eastern Africa, particularly in the Horn of Africa sub-region by enhancing cross-border trade in electricity. The 1st Ethiopia-Djibouti Interconnection project has been operational for the last 10 years and the power exchange between the two countries also increased within the same period from 155 GWh in 2011 to 532 GWh in 2020. Since the first interconnector was commissioned, in addition to the increase in demand in Djibouti, the industrial and railway line development around Dire Dawa in Ethiopia introduced transmission network congestion problems. Hence, the proposed Ethiopia-Djibouti 230 kV second transmission interconnection from Semera (Ethiopia) to Nagad (Djibouti) is the best option to increase by more than 30% the clean and relatively cheaper power supply to Djibouti and allow Ethiopia to increase foreign exchange revenue from power trade while reducing the amount of fossil fuelgenerated electricity in Djibouti. This project involves (i) the construction of 230 kV double circuit Transmission Line from Semera (Ethiopia) to Nagad (Djibouti). The line length is 292 km (102 km in Ethiopia and 190 km in Djibouti). Each circuit will have a rated power transfer capacity of 160 MW (ii) an extension of the existing Semera 230 kV Substation (Ethiopia) and extension of 230/63/20 kV substation at Nagad (Djibouti, (iii) strengthening of the existing 230 Kv transmission line between Kombolcha-Mile to Semera, 170 km long; and construction of 230 kV new substation at Mile and extension of Kombolocha and Semera existing 230 kV substations (Ethiopia), (iv) Last mile connection in Djibouti; (v) Technical Assistance and Capacity Building on Master Plan study and Power Trade Agreements and creating strong trading units in EEP (« Ethiopian Electric Power ») and EdD (« Electricite de Djibouti »). It will be implemented over a period of 48 months.
|
|||
| Country | ||||
| Source |
African Development Bank Group
|
|||
| Regions | ||||
| Sectors | ||||
| Published Date |
06.07.2021
|
|||
| Original Url | ||||
| Share | ||||
| Title |
|---|
Djibouti - Ethiopia Djibouti Second Power Interconnection Project, Phase II - Djibouti Part |
| Detail |
| The proposed project marks a new milestone in boosting regional integration in Eastern Africa, particularly in the Horn of Africa sub-region by enhancing cross-border trade in electricity. The 1st Ethiopia-Djibouti Interconnection project has been operational for the last 10 years and the power exchange between the two countries also increased within the same period from 155 GWh in 2011 to 532 GWh in 2020. Since the first interconnector was commissioned, in addition to the increase in demand in Djibouti, the industrial and railway line development around Dire Dawa in Ethiopia introduced transmission network congestion problems. Hence, the proposed Ethiopia-Djibouti 230 kV second transmission interconnection from Semera (Ethiopia) to Nagad (Djibouti) is the best option to increase by more than 30% the clean and relatively cheaper power supply to Djibouti and allow Ethiopia to increase foreign exchange revenue from power trade while reducing the amount of fossil fuelgenerated electricity in Djibouti. This project involves (i) the construction of 230 kV double circuit Transmission Line from Semera (Ethiopia) to Nagad (Djibouti). The line length is 292 km (102 km in Ethiopia and 190 km in Djibouti). Each circuit will have a rated power transfer capacity of 160 MW (ii) an extension of the existing Semera 230 kV Substation (Ethiopia) and extension of 230/63/20 kV substation at Nagad (Djibouti, (iii) strengthening of the existing 230 Kv transmission line between Kombolcha-Mile to Semera, 170 km long; and construction of 230 kV new substation at Mile and extension of Kombolocha and Semera existing 230 kV substations (Ethiopia), (iv) Last mile connection in Djibouti; (v) Technical Assistance and Capacity Building on Master Plan study and Power Trade Agreements and creating strong trading units in EEP (« Ethiopian Electric Power ») and EdD (« Electricite de Djibouti »). It will be implemented over a period of 48 months. |
| Country |
| Source |
| African Development Bank Group |
| Regions |
| Sectors |
| Published Date |
| 06.07.2021 |
| Original Url |
| View Original Url |
| Share |
Tenders from United States of America
Major Procurement COMMODITIESNotice is hereby given that South Panola School District sha...MPTAP
Organization:
***************
Country:
United States of America
Deadline:
20.07.2026
Major Procurement PERSONNEL SERVICES NON-ITThe City of Hazlehurst requests proposals from qualified fir...MPTAP
Organization:
***************
Country:
United States of America
Deadline:
20.07.2026
Major Procurement PERSONNEL SERVICES NON-ITJones College is seeking unpriced technical proposals for: ...MPTAP
Organization:
***************
Country:
United States of America
Deadline:
21.07.2026
Maj**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
21.07.2026
Maj**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
22.07.2026
DNR**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
22.07.2026
Maj**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
23.07.2026
Maj**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
23.07.2026
Maj**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
23.07.2026
Maj**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
24.07.2026
Maj**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
24.07.2026
Maj**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
27.07.2026
Maj**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
27.07.2026
Maj**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
28.07.2026
Maj**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
28.07.2026
Maj**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
28.07.2026
Maj**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
28.07.2026
Maj**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
28.07.2026
DNR**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
28.07.2026
Maj**************************************************************************************************************************************
Organization:
***************
Country:
United States of America
Deadline:
29.07.2026
Latest Articles
G20 Cross-Border Infrastructure Pipeline Unlocks $200B Private Investment in 2026
The G20 nations are intensifying efforts to bridge significant infrastructure deficits across developing economies, particularly within Africa, by refining s...
OECD Quality Infrastructure 2026: $12B Resilience Framework Launched
The global infrastructure community has keenly watched the OECD's evolving strategy for resilient infrastructure, particularly with the publication of the "C...
Gulf States Prioritize Diplomacy to Avoid Wider War with Iran
Veteran
Alpine Region Gets €15.44M Boost for Cross-Border Infrastructure in 2026-27
The Alpine Region is currently experiencing a dual-track investment surge, with significant funding directed towards both domestic tourism infrastructure and...
Caspian Region Launches World's First Subsea Fiber Cable Bypassing Russia
The Caspian Sea, long a crucial conduit for energy and goods, is now poised to become a vital artery for global data. The Trans-Caspian Fiber Optic Cable Lin...
Visegrad Group Revival: Central Europe's Alliance Rebooted After Years of Division
GÖDÖLLŐ, HUNGARY – The Visegrad Group (V4), comprising Czechia, Hungary, Poland, and Slovakia, formally rebooted its strategic alliance on June 23, 2026, wit...



