Tender Details
Title
Const. of tower foundation, cabinet base, solar foundation and barbed wire fencing at Gamung and Monopole foundation at Trailing,TEN24030034 Earnest Money Deposit DetailsEMD Type: LumpsumEMD Value: Nu. 20,500.00/- Bhutan Telecom Ltd
Country
Language
English
Organization
Published Date
19.04.2024
Deadline Date
19.04.2024
Overview
Const. of tower foundation, cabinet base, solar foundation and barbed wire fencing at Gamung and Monopole foundation at Trailing,TEN24030034 Earnest Money Deposit DetailsEMD Type: LumpsumEMD Value: Nu. 20,500.00/- Evaluation DetailsFinancial Evaluation: 100% Procurement Category: CivilDzongkhag/Location: MongarGoods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)Procurement Method: Open TenderingAnnual Procurement Plan: 2024Bidding Process: Single Stage Bidding - Single EnvelopeContact Details: Sonam Zangpo Civil section/ER/SJK 17123370Status: Being processedBidding DetailsSubmission Date: April 19 2024, 12:00 PMOpening Date: April 19 2024, 02:30 PMPrebid Date: None Prebid Place: NoneEarnest Money Deposit DetailsEMD Type: LumpsumEMD Value: Nu. 20,500.00/-Evaluation DetailsFinancial Evaluation: 100%Agency DocumentsSlDocumentLink36Integrity Pact DocumentDownload44RFPDownload70Bid FormDownloadDocument Prerequisites For ParticipationSlDocument6Bid Form14CDB License37Integrity Pact Document49Tax Clearance62Trade LicenseTender Items(BOQ/BOM)SlItem CodeItem Name,Additional Description/SpecificationsUoMQty1Tower foundation 25M2CG0002 Clearing jungle including uprooting of vegetation & trees of girth < 300mm & disposal within 50m of the site, sq.m225.03CG0011 Felling trees including cutting of trunks and branches, removal of roots, stacking of serviceable materials and disposal of rubbish within 50m lead - Girth 600 to 1200mm, each10.04CG0010 Felling trees including cutting of trunks and branches, removal of roots, stacking of serviceable materials and disposal of rubbish within 50m lead - Girth 300 to 600mm, each45.05EW0031 Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, cu.m75.06EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m81.07EW0107 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift - Ordinary rock with or without blasting, cu.m81.08CW0008 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), cu.m2.489RC0002 Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), cu.m10.310RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, kg817.9611RC0093 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., sq.m38.9312EW0195 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, cu.m68.013None Cabinet base, --14EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m1.3515CW0003 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, cu.m2.8416RC0090 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., sq.m7.217None Barbed wire fencing, --18EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m4.7619CW0003 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, cu.m3.0420SW0003 Steel work in single section including cutting, hoisting, fixing and applying priming coat of red lead paint - In Tees, angles and channels, kg769.0821RW0209 Providing & fixing G.I chain-link mesh including fixing of post or struts, G.I staples (excluding the cost of posts/struts, earthwork, concrete etc.) - 4mm (8 SWG) x 50mm, sq.m3.2922SW0021 Steel work welded, in built up sections, trusses, frame-works including cutting, hoisting, fixing and appl. priming coat of red - In Tees, angles and channels, kg110.4523RW0202 Providing & fixing G.I barbed Wire Netting including fixing of post or struts, G.I staples, coal tarring in case of ballies complete (posts/struts, earthwork, concrete paid separately) - 2.5mm , (12 SWG), 4 barbs form by twisting two point wires, each two turns, pitch of barbs 75mm, m1156.0824None Solar foundation, --25EW0031 Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, cu.m67.526EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m9.5427CW0005 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20 mm nominal size, cu.m0.5628RC0001 Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20 mm nominal size), cu.m2.4429RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, kg117.0730RC0093 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., sq.m18.4131EW0195 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, cu.m8.032None Monopole foundation at Trailing, --33EW0031 Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, cu.m2.034EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m12.2935CW0008 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), cu.m0.3536RC0006 Providing & laying in position reinforced cement concrete work in walls (any thickness) including attached pilasters buttresses, piers, abutments etc. upto floor five level excluding the cost of centering, shuttering and reinforcement - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), cu.m3.4837RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, kg483.0238RC0093 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., sq.m9.6439EW0195 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, cu.m9.0340SM0005 Providing & laying Random Rubble Masonry with hard stone in foundation & plinth - In cement mortar 1:4, cu.m1.8841SW00656 P & F 75MM DIA PVC Pipe for water drain, mtrs4.0Amendment DetailsSlIDDateDetailsRemarks1TAM24040028April 10 2024, 03:25 PMSubmission Date changed from 2024-04-10 12:00:00 to 2024-04-19 12:00:00Extended due to no enough bidder2TAM24040029April 10 2024, 03:31 PMOpening Date changed from 2024-04-10 14:30:00 to 2024-04-19 14:30:00Extended due to no enough bidder Const. of tower foundation, cabinet base, solar foundation and barbed wire fencing at Gamung and Monopole foundation at Trailing Const. of tower foundation, cabinet base, solar foundation and barbed wire fencing at Gamung and Monopole foundation at Trailing Bhutan Telecom Ltd Being processedProcurement Category: CivilDzongkhag/Location: MongarGoods/Services/Work Type: CON-W4-Power and Telecommunications Works (Small)Procurement Method: Open TenderingAnnual Procurement Plan: 2024Bidding Process: Single Stage Bidding - Single EnvelopeContact Details: Sonam Zangpo Civil section/ER/SJK 17123370Status: Being processedBidding DetailsSubmission Date: April 19 2024, 12:00 PMOpening Date: April 19 2024, 02:30 PMPrebid Date: None Prebid Place: NoneEarnest Money Deposit DetailsEMD Type: LumpsumEMD Value: Nu. 20,500.00/-Evaluation DetailsFinancial Evaluation: 100%Agency DocumentsSlDocumentLink36Integrity Pact DocumentDownload44RFPDownload70Bid FormDownloadDocument Prerequisites For ParticipationSlDocument6Bid Form14CDB License37Integrity Pact Document49Tax Clearance62Trade LicenseTender Items(BOQ/BOM)SlItem CodeItem Name,Additional Description/SpecificationsUoMQty1Tower foundation 25M2CG0002 Clearing jungle including uprooting of vegetation & trees of girth < 300mm & disposal within 50m of the site, sq.m225.03CG0011 Felling trees including cutting of trunks and branches, removal of roots, stacking of serviceable materials and disposal of rubbish within 50m lead - Girth 600 to 1200mm, each10.04CG0010 Felling trees including cutting of trunks and branches, removal of roots, stacking of serviceable materials and disposal of rubbish within 50m lead - Girth 300 to 600mm, each45.05EW0031 Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, cu.m75.06EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m81.07EW0107 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift - Ordinary rock with or without blasting, cu.m81.08CW0008 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), cu.m2.489RC0002 Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), cu.m10.310RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, kg817.9611RC0093 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., sq.m38.9312EW0195 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, cu.m68.013None Cabinet base, --14EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m1.3515CW0003 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, cu.m2.8416RC0090 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Foundation and plinth etc., sq.m7.217None Barbed wire fencing, --18EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m4.7619CW0003 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:2:4 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size, cu.m3.0420SW0003 Steel work in single section including cutting, hoisting, fixing and applying priming coat of red lead paint - In Tees, angles and channels, kg769.0821RW0209 Providing & fixing G.I chain-link mesh including fixing of post or struts, G.I staples (excluding the cost of posts/struts, earthwork, concrete etc.) - 4mm (8 SWG) x 50mm, sq.m3.2922SW0021 Steel work welded, in built up sections, trusses, frame-works including cutting, hoisting, fixing and appl. priming coat of red - In Tees, angles and channels, kg110.4523RW0202 Providing & fixing G.I barbed Wire Netting including fixing of post or struts, G.I staples, coal tarring in case of ballies complete (posts/struts, earthwork, concrete paid separately) - 2.5mm , (12 SWG), 4 barbs form by twisting two point wires, each two turns, pitch of barbs 75mm, m1156.0824None Solar foundation, --25EW0031 Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, cu.m67.526EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m9.5427CW0005 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20 mm nominal size, cu.m0.5628RC0001 Providing & laying in position reinforced cement concrete excluding the cost of centering, shuttering and reinforcement - all work upto plinth level - 1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20 mm nominal size), cu.m2.4429RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, kg117.0730RC0093 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., sq.m18.4131EW0195 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, cu.m8.032None Monopole foundation at Trailing, --33EW0031 Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard Soil, cu.m2.034EW0106 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lif - Hard Soil, cu.m12.2935CW0008 Providing and laying in position plain cement concrete excluding the cost of centering and shuttering - All work upto plinth level. - 1:4:8 (1 cement : 4 sand : 8 graded crushed stone 40 mm nominal size), cu.m0.3536RC0006 Providing & laying in position reinforced cement concrete work in walls (any thickness) including attached pilasters buttresses, piers, abutments etc. upto floor five level excluding the cost of centering, shuttering and reinforcement - 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20 mm nominal size), cu.m3.4837RC0083 Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield Strength 500 MPa) for R.C.C work including cutting, bending, binding and placing in position complete, kg483.0238RC0093 Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal of formwork - Columns, pillars, post, struts etc., sq.m9.6439EW0195 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc. within lead 50 m & lift 1.5m, cu.m9.0340SM0005 Providing & laying Random Rubble Masonry with hard stone in foundation & plinth - In cement mortar 1:4, cu.m1.8841SW00656 P & F 75MM DIA PVC Pipe for water drain, mtrs4.0Amendment DetailsSlIDDateDetailsRemarks1TAM24040028April 10 2024, 03:25 PMSubmission Date changed from 2024-04-10 12:00:00 to 2024-04-19 12:00:00Extended due to no enough bidder2TAM24040029April 10 2024, 03:31 PMOpening Date changed from 2024-04-10 14:30:00 to 2024-04-19 14:30:00Extended due to no enough bidder Bhutan Telecom Ltd Civil Being processed
NAICS
Mayonnaise Overhead Traveling Crane Paint Sand Paint Other Foundation Copper Brick Other Foundation All Other Telecommunications Brick All Other Telecommunications Automotive Body Automotive Body All Other Telecommunications Scenic and Sightseeing Transportation Paint Foundation Agencies Copper Water Process
CPVS
Fencing, railing and safety equipment installation work Excavating work Cement Iron, lead, zinc, tin and copper Parts of lift, skip hoists or escalators Foundation work Bindings Sand Wire Sections Pipes Coats Angles Trunks Towers, lattice masts, derricks and pylons Pitch Lead Props Parts of mortars Bending, folding, straightening or flattening machines Lifts, skip hoists, hoists, escalators and moving walkways Parts of lifts Masonry work Machinery for cleaning, filling, packing or wrapping bottles or other containers Concrete Cabinets Trees Forms Towers Concrete work Parts of dishwashing machines and of machines for cleaning, filling, packing or wrapping Hoists Bars, rods, wire and profiles used in construction Drain Live plants, bulbs, roots, cuttings and slips Cementing work Staples, tacks, drawing pins Bends Posts Soil Steel Bars Goods lifts Lifts Mortars Pipeline, piping, pipes, casing, tubing and related items Bends, tees and pipe fittings Gravel, sand, crushed stone and aggregates Paints Blasting work Dresses Shutters Staples Paints, varnishes and mastics Coal tar Dates
UNSPSC
Soil Stone Sand Netting Mesh Hoists Lifts Angles Channels Post Mortars Cement Pitch Drain Staples Water Bars Fencing Single room Water, sanitation and hygiene kits Water, sanitation and hygiene kit Water, sanitation and hygiene kits
Regions
Asia SAARC Countries South Asia
Sectors
Automobiles and Auto Parts Non-Renewable Energy Solar Photovoltaic PV Energy Postal and Courier Services Roads and Highways-Bridge Oil and Gas Infrastructure Telecommunications Printing and Publishing Services Cement and Asbestos Products Railways-Rail-Railroad Defence and Security Construction Energy-Power and Electrical Computer Hardwares and Consumables Steel Aviation Petroleum Products Construction Materials Marine
URL
Share
To be notified
when a tender matching your filter is published
To Follow
Tenders
Add New Tender Alert
To Follow
Contracts
Add New Contract Alert