Sign up now to have the right to view
50 tenders for free.
Title |
Heat Pump Replacement at Zootique Project Tender Notice International Competitive Bidding |
|||
---|---|---|---|---|
You can sign up and unlock it for freeAccess to Public and Private Sector Business Opportunities for 200+ Countries |
||||
Country | ||||
Language | English | |||
Organization | ||||
Published Date | 18.10.2024 | |||
Deadline Date | 01.11.2024 | |||
Overview |
Heat Pump Replacement at Zootique Project The existing Zootique heat pump is not repairable and requires replacement to heat and cool the Zootique, requiring the Contractor to perform the following: Removal of the existing heat pump from the building and Zoo site.Extending the concrete pad to suit the new heat pump.Bringing the new heat pump to second floor mechanical room.Installation of the new heat pump as per the manufacturer-s instructions.All condensate drain piping to be PVC pipe.Thermostat to be replaced with digital (non-programmable).The filters need to be 4 inches thick and have a MERV 13 minimum rating.All electrical work requires an ESA permit as well as inspection.Commissioning for approval by HTS Engineering Ltd.TENATIVE Project Completion by 2024-12-31. TORONTO ZOO Purchasing Supply, and 361A Old Finch Avenue, Toronto, Ontario, M1B 5K7 M1B 5K7, Tender Notice International Competitive Bidding RFQ-82 Canada GT-108832580
|
|||
NAICS | ||||
CPVS | ||||
UNSPSC | ||||
Regions | ||||
Sectors |
Building
Automobiles and Auto Parts
Supply
Bridges and Tunnels
Engineering
Roads and Highways-Bridge
Printing and Publishing
Cement and Asbestos Products
Defence and Security
Electricity
Construction
Energy-Power and Electrical
Computer Hardwares and Consumables
Steel
Building Material
Construction Materials
Marine
|
|||
URL | ||||
Share |
Title |
---|
Heat Pump Replacement at Zootique Project Tender Notice International Competitive Bidding |
Country |
Language |
English |
Organization |
Published Date |
18.10.2024 |
Deadline Date |
01.11.2024 |
Overview |
Heat Pump Replacement at Zootique Project The existing Zootique heat pump is not repairable and requires replacement to heat and cool the Zootique, requiring the Contractor to perform the following: Removal of the existing heat pump from the building and Zoo site.Extending the concrete pad to suit the new heat pump.Bringing the new heat pump to second floor mechanical room.Installation of the new heat pump as per the manufacturer-s instructions.All condensate drain piping to be PVC pipe.Thermostat to be replaced with digital (non-programmable).The filters need to be 4 inches thick and have a MERV 13 minimum rating.All electrical work requires an ESA permit as well as inspection.Commissioning for approval by HTS Engineering Ltd.TENATIVE Project Completion by 2024-12-31. TORONTO ZOO Purchasing Supply, and 361A Old Finch Avenue, Toronto, Ontario, M1B 5K7 M1B 5K7, Tender Notice International Competitive Bidding RFQ-82 Canada GT-108832580 |
NAICS |
Architectural International Research and Development in the Physical Research and Development in the Physical |
CPVS |
Pads Parts of heat pumps Engineering, auxiliary, average, loss, actuarial and salvage insurance services Suits Permits Concrete Heat pumps Concrete work Drain Piping Electrical, electromagnetic and mechanical treatment Pipeline, piping, pipes, casing, tubing and related items |
UNSPSC |
Drain Pumps Filters Suits Well engineering Condensate Suction pump, electrical |
Regions |
APEC Countries North America Northern America |
Sectors |
Building Automobiles and Auto Parts Supply Bridges and Tunnels Engineering Roads and Highways-Bridge Printing and Publishing Cement and Asbestos Products Defence and Security Electricity Construction Energy-Power and Electrical Computer Hardwares and Consumables Steel Building Material Construction Materials Marine |
URL |
Share |
To be notified
when a tender matching your filter is
published
To Follow
Tenders
Add New Tender Alert
To Follow
Contracts
Add New Contract Alert
To Follow
Fairs
Add New Fair Alert
Similar Tenders