Tender Details
Title

(農第06088号)白岩新橋外1橋機能保全計画策定委託業務【10月16日公告】 (農第06088号)白岩新橋外1橋機能保全計画策定委託業務【10月16日公告】 契 約 種 別 電子契約(7) 最低制限価格れている者。 公告 制限付一般競争入札を実施するので、事後審査方式制限付一般... (No. 06088) Commissioned work on formulating a functional preservation plan for Shiraiwa-Shinbashi and 1 other bridges [Announced on October 16th] (No. 06088) Commissioned work on formulating a functional preservation plan for Shiraiwa-Shinbashi and 1 other bridges [Announced on October 16th] Contract type Electronic contract (7) Minimum price limit holder. Announcement Restricted public competitive bidding will be implemented, so the post-review method restricted public bidding will be implemented...

Country
Language
Japanese
Organization
Published Date
16.10.2024
Deadline Date
17.01.2025
Overview
(農第06088号)白岩新橋外1橋機能保全計画策定委託業務【10月16日公告】 (農第06088号)白岩新橋外1橋機能保全計画策定委託業務【10月16日公告】 契 約 種 別 電子契約(7) 最低制限価格れている者。 公告 制限付一般競争入札を実施するので、事後審査方式制限付一般... 高知県香南市   入札情報は以下の通りです。 件名 (農第06088号)白岩新橋外1橋機能保全計画策定委託業務【10月16日公告】 種別 役務 公示日または更新日 2024 年 10 月 16 日 組織 高知県香南市 取得日 2024 年 10 月 16 日 19:06:35 金抜き設計書 (PDFファイル: 195.3KB)特記仕様書 (PDFファイル: 870.1KB)位置図 (PDFファイル: 1.9MB) 公告内容 契 約 種 別 電子契約(7) 最低制限価格れている者。 公告 制限付一般競争入札を実施するので、事後審査方式制限付一般競争入札実施要綱第6条及び 香南市財務規則(平成18年規則第43号)第87条の規定に基づき次のとおり公告する。 令和6年10月16日香南市長 濱田 豪太1 入札に付する事項(1) 業 務 番 号 農第06088号(2) 業 務 名 白岩新橋外1橋機能保全計画策定委託業務(3) 履 行 場 所 香南市野市町東佐古、香南市赤岡町(4) 業 務 概 要 点検診断業務 橋梁2橋計画策定業務 橋梁2橋(5) 予 定 期 間 令和6年11月8日 ~ 令和7年3月27日(140日)(6) 予 定 価 格 事後公表設定なし(8) 審 査 方 式 入札参加資格の審査は、開札後、入札保留を行い、落札候補者に必要な追加書類の提出を求め、当該落札候補者についてのみ行う事後審査方式とする。 2 入札参加資格 この工事の入札に参加できる者は、次の要件を満たす者であること。 (1) この公告の日現在、令和6年度香南市測量・建設コンサルタント等業務競争入札参加資格有資格者名簿の「道路」、「鋼構造物・コンクリート」、「農業土木」のいずれかに登載さ(2) 地方自治法施行令(昭和22年政令第16号)第167条の4の規定に該当しない者。 (9) 入 札 種 別 電子入札(10)(3) 公告の日から開札の日までの間に、香南市指名停止措置要綱(令和6年5月1日告示第86号)に基づく指名停止等の措置を受けていない者。 (4) 香南市の事務及び事業における暴力団の排除に関する規則(平成25年香南市規則第2号)第2条第2項第5号に掲げる排除措置対象者に該当しない者であること。 (5) 会社更生法(平成14年法律第154号)に基づく会社更生手続開始の申立て又は民事再生法(平成11年法律第225号)に基づく再生手続開始の申立てがなされていない者であること。 ただし、会社更生法の規定に基づく更正開始の申立て又は民事再生法の規定に基づく再生手続開始の申立てがなされた者であっても、手続開始の決定後に入札参加資格の再審査を受けた者については、この限りではない。 (6) 香高知県内に主たる営業所を置く者又は高知県内の営業所を受任者とする者。 (ア) 技術士法(昭和58年法律第25号)による技術者とし、次のいずれかの要件を満たす者。 a 建設部門で選択科目を「道路」又は「鋼構造物・コンクリート」とするもの又は(7) 次の要件を満たす者を、当該業務の管理技術者及び照査技術者として配置できること。 なお、管理技術者と照査技術者を同一の者が兼務することはできない。 ア 入札参加資格確認申請の日以前に申請者に雇用されている者。 イ 次の要件のうち、いずれかを満たす者であること。 17時00分まで 令和6年10月23日(水)(1) 2の入札参加資格要件を満たさなくなったとき。 (2) 申請書に虚偽の記載をしたことが判明したとき。 けている者。 落札候補者となった時点で失格とする。 7 入札の期間及び方法(1) 入札期間4 入札参加資格の喪失申請書受付後、次の各号のいずれかに該当するに至ったときは、当該工事の入札に参加することができない。 令和6年10月28日(月)から令和6年10月30日(水)までただし、電子入札システム運用時間内(閉庁日を除く日の8時30分から20時 れかとして登録されている者。 3 入札参加資格確認申請の方法等当該工事の入札に参加しようとする者は、次の受付期間内に入札参加資格確認申請を行わなければならない。 (1) 提出書類 競争入札参加資格確認申請書(様式1)(2) 受付場所 高知県香南市野市町西野2706番地香南市役所 契約管財課 入札契約係(3) 受付期間 この公告の日から令和6年10月23日(水)までただし、電子入札システム運用時間内(閉庁日を除く日の8時30分から20時00分まで)とする。 (4) 提出方法 電子入札システムの「競争参加資格確認申請書提出」画面から、作成済みの様式1の電子ファイルを添付して提出すること。なお、様式1の提出がない者は、5 設計図書の閲覧設計図書は、この公告の日から開札の日まで香南市ウェブサイトに掲載する方法により閲覧にメールアドレス bid@city.kochi-konan.lg.jp供する。 6 質疑書の受付及び回答(2) 受付方法 契約管財課で電子メールにより受け付ける。 (1) 受付期間令和6年10月25日(金)17時00分様式は任意とし、メール本文に記載する方法でも可とする。 00分まで)とする。 この公告の日から(3) 回答方法 香南市ウェブサイトに掲載する。 (4) 回答期限 農業部門で選択科目を「農業農村工学」とするものに合格し、同法による登録を受 (ウ) 建設コンサルタント登録規程(昭和52年4月15日建設省告示第717号)第3条第1号 のロの規定による国土交通大臣の認定を受けている者のうち、登録部門を「道路」、 「鋼構造物・コンクリート」、「農業農村工学(農業土木)」のいずれかとする者。 (8) この入札に参加しようとする他の入札参加者との間に資本関係又は人的関係がないこと。 (イ) 一般社団法人建設コンサルタンツ協会が実施する、シビルコンサルティングマネー ジャ(RCCM)資格試験に合格し、同協会に備える「RCCM登録簿」に専門技術 部門を「道路」、「鋼構造物・コンクリート」、「農業農村工学(農業土木)」のいず b 総合技術監理部門で選択科目を「建設-道路」、「建設-鋼構造物・コンクリート」、 「農業-農業農村工学」のいずれかに合格し、同法による登録を受けている者。 10 落札候補者の決定方法電子くじで落札候補者を決定する。 令和6年10月31日(木)9時10分11 資格審査(1) 開札後、電子入札システムにより、全ての入札参加者に保留通知書(事後審査のため、入札結果を保留した旨の通知)を送信する。 電子メールに様式3の電子ファイルを添付する方法又は書面の持参により提出(2) 予定価格の範囲内で、最低価格で入札をした者を落札候補者として決定する。 (3) 落札候補となるべき同価の入札をした者が2者以上あるときは、電子入札システムによる落札候補者は、資格審査に必要な追加書類を次のとおり提出しなければならない。提出がない 内で入札をした他の者のうち最低価格で入札した者が提出しなければならない。 場合、また、審査の結果、入札参加資格がないと認めたときは、予定価格の範囲(2) 入札方法 入札期間内に電子入札システムにより、入札金額及び3桁のくじ入力番号を登 各受付期限後、直ちに開札を行う。 再度入札の受付期限は、開札日当日の15時00分(1回目)及び17時00分(2回目)とし、(2) 開札場所 香南市役所本庁舎4階契約管財課8 開札の日時及び場所(1) 開札日時すること。なお、書面による場合には押印が必要となるので注意すること。 (2) 提出場所 香南市役所 契約管財課 入札契約係令和6年11月1日(金)16時00分まで(4) 提出方法やむを得ない事由により、紙の入札書による入札を認められた場合の取扱いについては、入札参加者は、あらかじめ「電子入札心得」及び「香南市建設工事電子競争入札心得の取 扱いについて」を承知すること。 12 落札者の決定資格審査の結果、資格があると認めたときは、その者を落札者として決定するものとする。 13 入札保証金免除する。 落札者は、契約締結にあたり、契約金額の10分の1以上の契約保証金を納付しなければなら落札者の決定後、電子入札システムにより、全ての入札参加者に落札者決定通知書を送信する。 別に定めるところによる。 14 契約保証金ただし書以下に該当する場合は、この限りではない。 (1)(2) 3の入札参加資格確認申請書を提出した者が1者の場合でも入札を行う。 15 その他(3) 提出期限(3)ない。ただし、香南市建設工事電子競争入札心得(以下「電子入札心得」という。)第23条第1項録する方法で行う。 この場合の提出期日等については、契約管財課から別途連絡するものとする。 (1) 提出書類 配置予定技術者名簿(様式3)9 再度入札の日時及び方法 初度入札で、落札となるべき入札がない場合であって、再度入札に参加できる者がある時は、 再度入札を2回まで行う。 に該当する入札又は電子入札心得第11条各号に該当する入札は、無効とする。 (10) 電子入札心得第12条各号に該当する入札は、失格とする。 (5) 申請書等及び追加書類の作成及び提出に係る費用は申請者の負担とする。 (7) 落札者は、配置予定技術者名簿に記載した配置予定技術者を当該業務に配置すること。原則として配置予定技術者の変更は認めない。 (9) この公告に示した資格要件を満たさない者が行った入札及び香南市財務規則第97条の規定して、指名停止措置を行うことがある。 提出書類に虚偽の記載があった場合は、契約を解除するとともに虚偽の記載をした者に対し替え、訂正等は認めない。 (6)(8) 税込みの請負金額が100万円以上となる場合は、測量調査設計業務実績情報サービス(TE CRIS)への登録を義務付ける。 (4) この入札において提出された申請書等及び追加書類は返却しない。また、提出期限後の差 金抜設計書設計変更により請負金額を変更する必要が生じた場合は、「請負更正金額等の算出方法について(通知)」により、変更の協議を行うものとする。 令和 6年10月 1日 積算単価適用履行日数 140 日高知県 香南市 赤岡町高知県 香南市 野市町東佐古白岩新橋外1橋機能保全計画策定委託業務 実施設計書(金抜)農 第06088号P. 1香南市整理番号 - -図面番号 - -FROM TO点検診断業務 橋梁2橋計画策定業務 橋梁2橋P. 2委託概要 起工又は変更理由報告書作成橋梁点検明細表 第2号式 1橋梁点検計画準備明細表 第1号式 1計画準備直接人件費橋梁点検診断業務設計業務測量設計費P. 3委 託 費 内 訳 表費目・工種・細別等 単 位 数 量 単 価 金 額 摘 要打合せ協議直接人件費計画策定業務安全費明細表 第6号式 1明細表 第5号式 1機械経費その他直接経費直接経費打合せ協議明細表 第4号 中間1回式 1打合せ協議報告書作成明細表 第3号式 1P. 4委 託 費 内 訳 表費目・工種・細別等 単 位 数 量 単 価 金 額 摘 要式 1電子成果品作成費旅費交通費率分式 1直接経費報告書作成明細表 第10号式 1報告書作成機能保全計画策定明細表 第9号式 1機能保全計画策定計画及び準備明細表 第8号式 1計画及び準備打合せ協議明細表 第7号 中間1回式 1P. 5委 託 費 内 訳 表費目・工種・細別等 単 位 数 量 単 価 金 額 摘 要設計業務価格式 1一般管理費等業務原価計式 1その他原価直接原価P. 6委 託 費 内 訳 表費目・工種・細別等 単 位 数 量 単 価 金 額 摘 要合計消費税相当額委託業務価格P. 7委 託 費 内 訳 表費目・工種・細別等 単 位 数 量 単 価 金 額 摘 要1 式当り現地踏査500㎡以上1000㎡未満橋 1橋 1現地踏査100㎡以上500㎡未満部材番号図修正500㎡以上1000㎡未満橋 1100㎡以上500㎡未満橋 11部材番号図新規作成摘 要業務計画書作成50橋未満業務名称・規格・条件 単 位 数 量 単 価 金 額P. 8明細表 第 1号 明細表計画準備1 式当り部材単位及び橋梁毎の健全性診断有り500㎡以上1000㎡未満 橋 11橋梁点検摘 要橋梁点検部材単位及び橋梁毎の健全性診断有り200㎡以上500㎡未満 橋名称・規格・条件 単 位 数 量 単 価 金 額P. 9明細表 第 2号 明細表橋梁点検21 式当り摘 要報告書作成部材単位及び橋梁毎の健全性診断有り橋名称・規格・条件 単 位 数 量 単 価 金 額P. 10明細表 第 3号 明細表報告書作成11 式当り摘 要打合せ協議業務中間1回名称・規格・条件 単 位 数 量 単 価 金 額P. 11明細表 第 4号 明細表打合せ協議41 式当り摘 要橋梁点検車運転100㎡以上500㎡未満 1橋500㎡未満1000㎡以上 1橋 日名称・規格・条件 単 位 数 量 単 価 金 額P. 12明細表 第 5号 明細表機械経費1 式当り摘 要交通誘導警備員交通誘導警備員B(100㎡以上500㎡未満 1橋 500㎡以上1000㎡未満 1橋)人名称・規格・条件 単 位 数 量 単 価 金 額P. 13明細表 第 6号 明細表安全費11 式当り摘 要打合せ協議業務中間1回名称・規格・条件 単 位 数 量 単 価 金 額P. 14明細表 第 7号 明細表打合せ協議11 式当り摘 要計画及び準備業務名称・規格・条件 単 位 数 量 単 価 金 額P. 15明細表 第 8号 明細表計画及び準備21 式当り摘 要機能保全計画策定橋名称・規格・条件 単 位 数 量 単 価 金 額P. 16明細表 第 9号 明細表機能保全計画策定11 式当り摘 要報告書作成業務名称・規格・条件 単 位 数 量 単 価 金 額P. 17明細表 第 10号 明細表報告書作成 白岩新橋外1橋機能保全計画策定委託業務特記仕様書第1条 共通仕様書の適用について本業務は、「高知県測量業務共通仕様書」、「高知県地質・土質調査共通仕様書」、「高知県土木設計等共通仕様書(以下、「共仕」という。)」等に基づき実施しなければならない。2 ただし,共通仕様書の各章における「適用すべき諸基準」で示された示方書,指針等は改定された最新のものとする。なお,業務途中で改定された場合はこの限りでない。第2条 個人情報の保護について個人情報の保護について受注者は、この契約による業務を処理するための個人情報の取扱いについては、別記「個人情報取扱特記事項」を守らなければならない。参考)個人情報保護制度に関するアドレス:http://www.pref.kochi.lg.jp/soshiki/112701/joko-kojin-index.html別記 個人情報取扱特記事項(基本的事項)第1 受注者は、個人情報(個人に関する情報であって、特定の個人を識別することができると認められるもの。以下同じ)の保護の重要性を認識し、この契約による業務の実施に当たっては、個人の権利利益を侵害することのないよう、個人情報の取扱いを適正に行わなければならない。(秘密の保持)第2 受注者は、この契約による業務に関して知り得た個人情報を他に漏らしてはならない。この契約が終了し、又は解除された後においても同様とする。(収集の制限)第3 受注者は、この契約による業務を行うために個人情報を収集するときは、その業務の目的を明確にし、目的を達成するために必要な範囲内で、適法かつ公正な手段により行なわなければならない。(適正管理)第4 受注者は、この契約による業務に関して知り得た個人情報について、漏えい、滅失及びき損の防止その他の個人情報の適正な管理のために必要な措置を講じなければならない。(目的外利用及び提供の禁止)第5 受注者は発注者の指示又は承諾がある時を除き、この契約による業務に関して知り得た個人情報を契約の目的以外に利用し又は第三者に提供してはならない。(複写又は複製の禁止)第6 受注者は発注者の承諾がある時を除き、この契約による業務を行うため発注者から提供を受けた個人情報が記録された資料等を複写又は複製してはならない。(再委託の禁止)第7 受注者は、発注者が承諾した時を除き、この契約による個人情報を取り扱う業務については、自ら行い、第三者に委託してはならない。(資料等の返還)第8 受注者は、この契約による業務を行うため発注者から提供を受け、又は受注者自らが収集し、若しくは作成した個人情報が記録された資料等は、この契約の終了後直ちに発注者に返還し又は引き渡すものとする。ただし、発注者が別に指示したときはその指示に従うものとする。(従事者への周知)第9 受注者は、この契約による業務に従事している者に対して、在職中及び退職後においても当該業務に関して知り得た個人情報をみだりに他人に知らせ、又は目的以外に使用してはならないこと等、個人情報の保護に関し必要な事項を周知させなければならない。(調査)第10 発注者は、受注者がこの契約による業務を行うに当たり、取り扱っている個人情報の状況について、随時調査することができる。(事故報告)第11 受注者は、この契約に違反する事態が生じ、又は生じるおそれのあることを知ったときは、速やかに発注者に報告し、発注者の指示に従うものとする。注1 委託等の内容にあわせて、適宜必要な事項を追加し、また不要な事項を削除することができる。第3条 業務の目的本業務は、香南市が管理する道路橋の損傷状態を把握するために近接目視を基本とする点検及び健全性の診断を実施し、点検結果をもとに保全対策のためのコストの最小化・平準化が図られるよう機能保全計画を策定するものである。なお、点検方法は、高知県土木部道路課制定の「高知県道路橋定期点検要領(案)(以下、「点検要領」という。)」に基づき実施し、計画策定にあたっては、「農道保全対策の手引き(令和3年4月)」に基づき作成するものとする。第4条 業務内容(1)業務計画業務の目的・趣旨を把握したうえで、設計図書に示す内容を確認し共仕第1111条に基づき、業務計画書を作成し、調査職員に提出するものとする。(2)計画準備業務計画書作成、部材番号図の作成・修正、現地踏査及び関係機関との協議資料作成等を行う。(3)橋梁点検点検要領に定めた方法により、橋梁点検車あるいは脚立及び梯子等を用いて、橋梁点検を近接目視にて行うとともに、点検対象部材の部材単位での健全性の診断と径間毎及び橋梁毎の健全性の診断を行う。(4)新技術等活用の検討定期点検においては、「新技術利用のガイドライン(案)国土交通省」を参考にするとともに、利用する新技術は、「点検支援技術 性能カタログ(案)国土交通省」に記載されている仕様確認が行われた技術から選定することを基本とし、有用な新技術を積極的に活用するための検討を行い、調査職員と協議のうえ、採用する点検方法を決定した後に定期点検を行うものとする。(5)機能保全計画策定(健全度把握及び維持管理の方針設定)健全度の把握及び日常的な維持管理、コスト縮減に係わる基本方針を設定するものとする。また、損傷の劣化予測手法について検討を行う。(対策工法・対策時期等の検討)各部材の劣化を予測し、将来の健全度を評価したうえで対策工法の検討を行う。また、路線や橋梁の重要性に応じて管理水準を設けたうえで維持管理シナリオを決定し、対策時期について検討を行う。(LCCの算定)維持管理シナリオに対応したLCCを算出する。(機能保全計画の策定及び効果)機能保全計画の策定にあたっては、将来の劣化予測を把握したうえで複数の予算計画(案)に対する実現可能な最適案を抽出する。これらの検討結果をもとに機能保全計画をとりまとめるものとし、以下の内容を含むものとする。・長寿命化対策における基本方針・費用の縮減に関する具体的な方針・構造物の諸元・直近における点検結果及び次回点検年度・対策内容・対策の着手、完了年度・対策に係る全体概算事業費また、機能保全計画の策定によるコスト縮減効果を検証し、妥当性の評価を行う。第5条 打合せ協議打合せ協議は、点検診断業務及び計画策定業務ともに初回打合せ、中間打合せ1回、最終打合せ(成果品納入前)の計3回とし、初回打合せ及び最終打合せ、重要な打合せを行う場合は管理技術者が出席する。第6条 報告書作成本業務の検討結果をとりまとめ報告書を作成する。 ・業務報告書(紙媒体1部、電子納品2枚(正・副))・点検調書(調査記録表、現状写真)・その他 調査員の指示するもの第7条 管理技術者土木関係建設コンサルタント業務(500万円以上)管理技術者1 次のいずれかに該当する者。(1)技術士法(昭和58年法律第25号)による技術士とし、次のいずれかの要件を満たす者とする。ア 建設部門で選択科目を「道路」又は「鋼構造及びコンクリート」とする。イ 農業部門で選択科目を「農業農村工学(農業土木)」とする。(2)社団法人建設コンサルタンツ協会が実施するシビルコンサルティングマネージャ(RCCM)資格試験に合格し、同協会に備える「RCCM登録簿」に登録されている者とし、専門部門を「道路」又は「鋼構造及びコンクリート」とする。(3)建設コンサルタント登録規程第3条第1号のロの規定により大臣が認定した者とし、専門部門を「道路」又は「鋼構造及びコンクリート」とする。2 管理技術者は、本業務が完了するまで原則として変更できない。病床、死亡、退職等やむを得ない理由により変更する場合は、同等以上の技術力を有する者を配置し、発注者の了承を得なければならない。第8条 交通誘導警備員本業務の点検を行うに際し、交通誘導警備員 4 人を配置することとしているが、現地踏査および関係機関との協議結果により配置人数に変更があった場合は設計変更の対象とする。第9条 点検作業機械点検に使用する建設機械は、橋梁点検車(BT-200相当)を想定している。なお、現場条件等により機械の仕様及び使用日数に変更がある場合は、発注者との協議の上、設計変更の対象とする。第10条 準拠基準・「高知県道路橋定期点検要領」(高知県土木部道路課)・「道路橋定期点検要領」(国土交通省道路局)・「農道保全対策の手引き(令和3年4月)」(農林水産省)・その他必要に応じて適宜用いる。第11条 貸与資料・既往道路橋定期点検 点検調書・その他必要に応じて適宜用貸与する。第12条 その他その他、疑義のある場合は、調査職員と協議するものとする。 白岩新橋ふれあい橋農第06088号 白岩新橋外1橋機能保全計画策定委託業務 位置図 (No. 06088) Commissioned work to formulate a functional conservation plan for Shiraiwa-shinbashi and one other bridge [Announced on October 16th] (No. 06088) Commissioned work to formulate a functional conservation plan for Shiraiwa-shinbashi and one other bridge [Announced on October 16th] Contract type Electronic contract (7) The party with the lowest price limit. Announcement Since a limited public competitive bidding will be carried out, a limited public competitive bidding after review method will be used... Konan City, Kochi Prefecture Bidding information is as follows. Subject (No. 06088) Commissioned work to formulate a functional conservation plan for Shiraiwa Shinbashi and one other bridge [Announced on October 16] Type Service Date of announcement or update October 16, 2024 Organization Konan City, Kochi Prefecture Date of acquisition October 16, 2024 19:06:35 Design document without payment (PDF file: 195.3KB) Special specifications (PDF file: 870.1KB) Location map (PDF file: 1.9MB) Announcement contents Contract type Electronic contract (7) Minimum limit price holder. Announcement Since a limited public competitive bidding will be conducted, the following is announced in accordance with Article 6 of the Guidelines for the Implementation of Limited Public Competitive Bidding by Post-Review Method and Article 87 of the Konan City Financial Regulations (Regulations No. 43 of 2006). October 16, 2024 Mayor of Konan City, Gota Hamada 1 Items to be put up for bidding (1) Work number: Agriculture No. 06088 (2) Work name: Commissioned work to develop a functional preservation plan for Shiraiwa-shinbashi and one other bridge (3) Location of execution: Higashisako, Noichi-cho, Konan City, Akaoka-cho, Konan City (4) Work overview: Inspection and diagnosis work; plan development work for two bridges; two bridges (5) Scheduled period: November 8, 2024 - March 27, 2025 (140 days) (6) Estimated price: No ex-post disclosure set (8) Screening method: After the bids are opened, the bids will be put on hold and the successful bidders will be asked to submit any additional documents necessary, and a post-screening method will be conducted only for the successful bidder. 2. Eligibility to participate in the bid Those who can participate in the bid for this work must meet the following requirements. (1) As of the date of this announcement, those who are listed in either "Roads," "Steel Structures/Concrete," or "Agricultural Engineering" in the list of persons eligible to participate in competitive bidding for Konan City surveying/construction consulting services, etc., in fiscal year 2024. (2) Those who do not fall under the provisions of Article 167-4 of the Enforcement Order of the Local Autonomy Law (Cabinet Order No. 16 of 1947). (9) Bidding type: Electronic bidding (10) (3) Those who have not been subject to measures such as suspension of bids based on the Konan City Suspension of Bids Guidelines (Public Notice No. 86 of May 1, 2024) between the date of announcement and the date of opening of bids. (4) Those who do not fall under the persons subject to exclusion measures listed in Article 2, Paragraph 2, Item 5 of the Rules for the Exclusion of Organized Crime Groups from Konan City Affairs and Businesses (Konan City Rules No. 2 of 2013). (5) A person who has not filed a petition for the commencement of corporate reorganization proceedings under the Corporate Reorganization Act (Act No. 154 of 2002) or a petition for the commencement of rehabilitation proceedings under the Civil Rehabilitation Act (Act No. 225 of 1999). However, this does not apply to a person who has filed a petition for the commencement of rehabilitation proceedings under the Corporate Reorganization Act or a petition for the commencement of rehabilitation proceedings under the Civil Rehabilitation Act, but has undergone a reexamination of eligibility to participate in the bid after the decision to commence the proceedings has been made. (6) A person who has a principal place of business in Kochi Prefecture or a person who has an office in Kochi Prefecture as his/her agent. (a) A person who is an engineer under the Professional Engineers Act (Act No. 25 of 1983) and who satisfies any of the following requirements: a. A person in the construction sector whose elective subject is "Roads" or "Steel Structures and Concrete" or (7) A person who satisfies the following requirements can be assigned as a managing engineer and an inspecting engineer for the work. However, the same person cannot hold the positions of managing engineer and inspecting engineer at the same time. a. A person who has been employed by the applicant before the date of application for confirmation of eligibility to participate in the bid. A person who meets any of the following requirements. By 5:00 p.m. Wednesday, October 23, 2024 (1) When they no longer meet the requirements for eligibility to participate in the bid under 2. (2) When it is discovered that a false statement was made in the application form. A person who has been disqualified from the bidder's acceptance will be disqualified as soon as they become a potential bidder. 7. Bidding period and method (1) Bidding period 4. If any of the following items apply to you after receipt of your application for disqualification to participate in the bid, you will not be able to participate in the bid for the work in question. From Monday, October 28, 2024 to Wednesday, October 30, 2024, however, during the operating hours of the electronic bidding system (8:30 to 20:00 on days excluding closing days), those who are registered as such must submit an application for confirmation of eligibility to participate in competitive bidding. 3. Method of application for confirmation of eligibility to participate in competitive bidding, etc. Those who wish to participate in the bidding for the relevant work must submit an application for confirmation of eligibility to participate in competitive bidding within the following application period. (1) Documents to be submitted Application for confirmation of eligibility to participate in competitive bidding (Form 1) (2) Reception location 2706 Nishino, Noichi-cho, Konan City, Kochi Prefecture, Konan City Hall, Contract Management Division, Bidding and Contracts Section (3) Reception period From the date of this announcement to Wednesday, October 23, 2024, however, during the operating hours of the electronic bidding system (8:30 to 20:00 on days excluding closing days), those who are registered as such must submit an application for confirmation of eligibility to participate in competitive bidding by attaching the electronic file of Form 1 that you have already created via the "Submit application for confirmation of eligibility to participate in competitive bidding" screen of the electronic bidding system. Those who have not submitted Form 1 must submit the application within the application period set out in Section 5. The design documents will be posted on the Konan City website from the date of this announcement until the date of opening of bids. You can view the design documents by emailing bid@city.kochi-konan.lg.jp. 6. Receipt and Response of Questions (2) Method of Receipt: The Contract Management Division will accept questions by email. (1) Period of Reception: Friday, October 25, 2024, 5:00 PM. The format is optional, and responses may be written in the body of the email. (3) Method of Response: The questions will be posted on the Konan City website. (4) Deadline for Response: Those who have passed the elective subject of "Agricultural and Rural Engineering" in the agricultural sector and have been registered under the same law. (c) Those who have been certified by the Minister of Land, Infrastructure, Transport and Tourism pursuant to Article 3, Item 1, (b) of the Construction Consultant Registration Regulations (Ministry of Construction Notification No. 717, April 15, 1977), and whose registered sector is either "Roads", "Steel Structures and Concrete", or "Agricultural and Rural Engineering (Agricultural Civil Engineering)". (8) There are no capital or personal relationships between the other bidders who intend to participate in this bid. (a) Those who have passed the Civil Consulting Manager (RCCM) qualification examination conducted by the Japan Construction Consultants Association and have registered in the "RCCM Register" prepared by the Association in one of the following specialized technical fields: "Roads," "Steel Structures and Concrete," or "Agricultural and Rural Engineering (Agricultural Civil Engineering)." b. Those who have passed the elective subjects "Construction - Roads," "Construction - Steel Structures and Concrete," or "Agriculture - Agricultural and Rural Engineering" in the General Technical Supervision Department and have been registered under the same law. 10 Method of determining successful bidders Successful bidders will be determined by electronic lottery. Thursday, October 31, 2024, 9:10 a.m. 11 Qualification review (1) After the bids are opened, the electronic bidding system will send a notice of withholding (notification that the bid results have been withheld for post-examination) to all bidders. Submit by attaching the electronic file of Form 3 to an email or by bringing a paper document (2) The bidder who bids at the lowest price within the estimated price range will be determined as the successful bidder. (3) In the event that there are two or more bidders with the same bid that are considered to be the successful bidder, the successful bidder through the electronic bidding system must submit the following additional documents required for the qualification screening. If no documents are submitted, the bidder who submitted the lowest bid within the period must submit them. Also, if the screening result indicates that the bidder is not eligible to participate in the bidding, the bid amount and the three-digit lottery entry number must be registered through the electronic bidding system during the bidding period. The bids will be opened immediately after each acceptance deadline. The acceptance deadline for re-bids is 15:00 (first time) and 17:00 (second time) on the day of bid opening. (2) Place for bid opening The bids will be opened at 8, Contract Management Division, 4th floor, Konan City Hall Main Building. Date and time and place of bid opening (1) Date and time of bid opening. Please note that if submitted in writing, a seal is required. (2) Place of submission: Konan City Hall, Contract Management Division, Bidding and Contract Section, Friday, November 1, 2024, 16:00 (4) Method of submission: In the event that a paper bid is permitted due to unavoidable circumstances, the bidder must be aware of the "Electronic Bidding Guidelines" and "Handling of Konan City Electronic Competitive Bidding Guidelines for Construction Works" in advance. 12 Determination of successful bidder: If the bidder is deemed qualified as a result of the qualification review, the bidder will be selected as the successful bidder. 13 Bidding security will be waived. The successful bidder must pay a contract security of at least one-tenth of the contract amount when concluding the contract. After the successful bidder is selected, a notice of successful bidder selection will be sent to all bidders via the electronic bidding system. As specified separately. 14 Contract security proviso: This does not apply in the following cases. (1)(2) Bidding will be conducted even if only one person submits the application for confirmation of bidder qualification under 3. 15 Other (3) Submission deadline (3) None. However, the method will be as set forth in Article 23, Paragraph 1 of the Konan City Construction Works Electronic Competitive Bidding Guidelines (hereinafter referred to as the "Electronic Bidding Guidelines"). In this case, the deadline for submission will be notified separately by the Contract Management Division. (1) Documents to be submitted List of engineers to be assigned (Form 3) 9 Date and method of re-bidding If there is no successful bid in the initial bidding and there are people who can participate in the re-bidding, re-bidding will be conducted up to two times. Bids that fall under the above or any of the items in Article 11 of the Electronic Bidding Guidelines will be invalid. (10) Bids that fall under any of the items in Article 12 of the Electronic Bidding Guidelines will be disqualified. (5) The applicant will be responsible for the costs of preparing and submitting the application form, etc. and additional documents. (7) The successful bidder will assign the engineers to be assigned listed in the list of engineers to be assigned to the work. In principle, changes to the engineers to be assigned will not be permitted. (9) In accordance with Article 97 of the Konan City Financial Regulations, suspension of bids submitted by persons who do not meet the qualifications set forth in this announcement and suspension of nomination may be implemented. In the event of any false statements in the submitted documents, the contract will be terminated and the person who made the false statements will be replaced, and corrections will not be permitted. (6)(8) If the contract amount including tax is 1 million yen or more, registration with the Survey, Investigation and Design Work Performance Information Service (TE CRIS) will be mandatory. (4) Application forms and additional documents submitted in connection with this bid will not be returned. In addition, if it becomes necessary to change the contract amount due to changes in the design of the design document excluding the difference after the submission deadline, the change will be discussed pursuant to the "Notice on the calculation method for contract revision amount, etc." October 1, 2024 Estimated unit price applied Number of days of performance 140 Akaoka Town, Konan City, Kochi Prefecture Noichi Town, Konan City, Kochi Prefecture Higashisako Shiraiwa Shinbashi and 1 other bridges Functional conservation plan formulation commissioned work Detailed design document (excluding gold) Agriculture No. 06088 P. 1 Konan City Reference number - - Drawing number - - FROM TO Inspection and diagnosis work Bridge 2 bridges Plan formulation work Bridge 2 bridges P. 2 Commission overview Preparation of report on reasons for commencement of construction or change Bridge inspection details table No. 2 1 Bridge inspection plan preparation details table No. 1 1 Plan preparation Direct labor costs Bridge inspection and diagnosis work Design work Surveying and design costs P. 3 Commissioned cost breakdown table Expense item, type of work, subdivision, etc. Unit Quantity Unit price Amount Remarks Meeting Discussion Direct labor costs Plan formulation work Safety costs Details table No. 6 1 Details table No. 5 1 Machinery expenses Other direct expenses Direct expenses Meeting consultation details No. 4 Interim 1st form 1 Meeting consultation report preparation details No. 3 1P. 4 Commissioned expenses breakdown table Expenses, work types, subdivisions, etc. Unit Quantity Unit price Amount Remarks 1 Electronic deliverables preparation expenses Travel expenses Transportation cost rate breakdown 1 Direct expense report preparation details No. 10 1 Report preparation Functional maintenance plan formulation details No. 9 1 Functional maintenance plan formulation Planning and preparation details No. 8 1 Planning and preparation Meeting consultation details No. 7 Interim 1st form 1P. 5 Commissioned expenses breakdown table Expenses, work types, subdivisions, etc. Unit Quantity Unit price Amount Remarks Design work price details 1 General administrative expenses, etc. Business cost calculation details 1 Other costs Direct costs P. 6 Commissioned expenses breakdown Table of expenses, work type, subdivision, etc. Unit Quantity Unit price Amount Comments Total amount equivalent to consumption tax Commissioned work price P. 7 Commissioned work breakdown Table of expenses, work type, subdivision, etc. Unit Quantity Unit price Amount Comments 1 set Site survey 500m2 or more, less than 1000m2 Bridge 1 Bridge 1 Site survey 100m2 or more, less than 500m2 Component number map revision 500m2 or more, less than 1000m2 Bridge 1 100m2 or more, less than 500m2 Bridge 1 1 New component number map creation Comments Creation of work plan Less than 50 Bridges Work name, specifications, conditions Unit Quantity Unit price Amount P.8Details No. 1DetailsPlanningPreparation1 per setBridgeInspection of soundness by component and by bridge500m2 or more and less than 1000m2Bridge11Bridge inspectionRemarks RequiredBridge inspectionInspection of soundness by component and by bridge200m2 or more and less than 500m2BridgeName, standard, conditionUnitQuantityUnit priceAmountP. 9Details No. 2DetailsBridge inspection21 per setRemarks RequiredReport preparationInspection of soundness by component and by bridgeBridgeName, standard, conditionUnitQuantityUnit priceAmountP. 10Details No. 3DetailsReport preparation11 per setRemarks RequiredMeetingsDiscussionWorkInterim1Name, standard, conditionUnitQuantityUnit priceAmountP. 11Details No. 4DetailsMeetingsDiscussion41 Remarks per set Bridge inspection vehicle operation required 1 bridge over 100m2 and under 500m2 1 bridge over 1000m2 Date Name, standard, conditions Unit Quantity Unit price Amount P. 12 Schedule No. 5 Schedule Machinery expenses Remarks per set Traffic control guard Traffic control guard B (1 bridge over 100m2 and under 500m2 1 bridge over 500m2 and under 1000m2) Person Name, standard, conditions Unit Quantity Unit price Amount P. 13 Schedule No. 6 Schedule Safety expenses Remarks per 1 set Meeting required Discussion work Interim 1 time Name, standard, conditions Unit Quantity Unit price Amount P. 14 Schedule No. 7 Schedule Meeting Discussion Remarks per 1 set Planning and preparation work Name, standard, conditions Unit Order Quantity Unit Price Amount P. 15 Schedule No. 8 Schedule Planning and Preparation 21 units per Summary Formulation of Functional Preservation Plan Bridge Name, Standards, Conditions Unit Quantity Unit Price Amount P. 16 Schedule No. 9 Schedule Formulation of Functional Preservation Plan 11 units per Summary Report Preparation Work Name, Standards, Conditions Unit Quantity Unit Price Amount P. 17 Schedule No. 10 Schedule Report Preparation Formulation of Functional Preservation Plan for Shiraiwa-Shinbashi and 1 other bridges Commissioned Work Special Specifications Article 1 Application of Common Specifications This work must be carried out in accordance with the "Kochi Prefecture Surveying Work Common Specifications", "Kochi Prefecture Geological and Soil Survey Common Specifications", "Kochi Prefecture Civil Engineering Design, etc. Common Specifications (hereinafter referred to as "Common Specifications")", etc. 2. However, the specifications and guidelines shown in the "Applicable Standards" in each chapter of the common specifications shall be the latest revised ones. However, this does not apply if they are revised during the work. Article 2: Protection of Personal Information Regarding the Protection of Personal Information, the Contractor must comply with the separate "Special Notes on Personal Information Handling" regarding the handling of personal information in processing the work under this contract. Reference) Address regarding the Personal Information Protection System: http://www.pref.kochi.lg.jp/soshiki/112701/joko-kojin-index.html Separate Note Special Notes on Personal Information Handling (Basic Matters) Article 1 The Contractor shall recognize the importance of protecting personal information (information about an individual that is recognized as being capable of identifying a specific individual; the same applies below), and in carrying out the work under this contract, shall handle personal information appropriately so as not to infringe on the rights and interests of individuals. (Confidentiality) Article 2 The Contractor shall not disclose to others any personal information that it learns in connection with the work under this contract. This shall also apply after this contract has ended or been terminated. (Collection Restrictions) Article 3 When the Contractor collects personal information to carry out the work under this contract, it shall clarify the purpose of the work, and shall do so by lawful and fair means to the extent necessary to achieve that purpose. (Proper Management) Article 4 The Contractor shall take necessary measures to prevent the leakage, loss, and damage of personal information that it learns in connection with the work under this contract, and to properly manage such personal information. (Prohibition of use and provision for purposes other than those intended) Article 5 The Contractor shall not use personal information acquired in the course of the work under this contract for purposes other than those of the contract or provide it to a third party, unless instructed or approved by the Ordering Party. (Prohibition of copying or duplication) Article 6 The Contractor shall not copy or duplicate any materials, etc. containing personal information provided by the Ordering Party in order to carry out the work under this contract, unless approved by the Ordering Party. (Prohibition of subcontracting) Article 7 The Contractor shall carry out any work under this contract that involves the handling of personal information, and shall not entrust such work to a third party, except when approved by the Ordering Party. (Return of materials, etc.) Article 8 The Contractor shall return or hand over to the Ordering Party any materials, etc. containing personal information provided by the Ordering Party or collected or created by the Contracting Party in order to carry out the work under this contract, immediately after the termination of this contract. However, if the Ordering Party gives a different instruction, the Contractor shall follow that instruction. (Notification to employees) Article 9 The Contractor must inform those engaged in the work under this contract of the necessary matters regarding the protection of personal information, such as not to disclose to others or use for purposes other than those intended, any personal information learned in the course of the work, both during their employment and after retirement. (Investigation) Article 10 The Client may investigate at any time the status of personal information handled by the Contractor in carrying out the work under this contract. (Accident Report) Article 11 If the Contractor becomes aware of any situation that violates this contract or is likely to occur, the Contractor shall promptly report it to the Client and follow the Client's instructions. Note 1 The Contractor may add necessary matters and delete unnecessary matters as appropriate, depending on the contents of the contract, etc. Article 3 Purpose of the work This work involves the implementation of inspections and soundness diagnosis based on close visual inspections to grasp the damage state of road bridges managed by Konan City, and the formulation of a functional maintenance plan based on the inspection results to minimize and level out the costs for maintenance measures. The inspection method shall be based on the "Kochi Prefectural Road Bridge Periodic Inspection Guidelines (Draft) (hereinafter referred to as the "Inspection Guidelines")" established by the Kochi Prefectural Civil Engineering Department Road Division, and the plan shall be based on the "Guidelines for Farm Road Preservation Measures (April 2021)". Article 4 Work Contents (1) Work Plan After understanding the purpose and intent of the work, confirm the contents shown in the design documents, and prepare a work plan based on Article 1111 of the Joint Specifications and submit it to the survey staff. (2) Plan Preparation Work Plan Preparation, Part Number Drawing and Correction, On-site Survey, and Preparation of Consultation Materials with Related Organizations. (3) Bridge Inspection Bridge inspection shall be conducted by close-up visual inspection using a bridge inspection vehicle or stepladders and ladders, etc., according to the method specified in the Inspection Guidelines, and the soundness of the inspected parts shall be diagnosed on a part-by-part basis, as well as the soundness of each span and each bridge. (4) Consideration of the use of new technologies, etc. In regular inspections, the "Guidelines for the Use of New Technologies (Draft) Ministry of Land, Infrastructure, Transport and Tourism" will be used as a reference, and new technologies to be used will be selected from those that have been confirmed for their specifications and are listed in the "Inspection Support Technology Performance Catalog (Draft) Ministry of Land, Infrastructure, Transport and Tourism". Consideration will be given to the active use of useful new technologies, and regular inspections will be conducted after deciding on the inspection method to be adopted in consultation with the survey staff. (5) Formulating a Functional Preservation Plan (Ascertaining the Soundness and Setting a Policy for Maintenance and Management) Basic policies related to understanding the soundness, daily maintenance and management, and cost reduction will be set. In addition, a method for predicting deterioration of damage will be considered. (Consideration of countermeasure construction methods, timing of countermeasures, etc.) The deterioration of each component will be predicted, and countermeasure construction methods will be considered after evaluating the future soundness. In addition, a maintenance scenario will be determined after setting a management level according to the importance of the route and bridge, and the timing of countermeasures will be considered. (Calculation of LCC) The LCC corresponding to the maintenance and management scenario will be calculated. (Formulation and Effects of Functional Preservation Plans) In formulating functional preservation plans, future deterioration predictions are understood and feasible optimal plans are extracted for multiple budget plans (drafts). Functional preservation plans are compiled based on the results of these studies, and include the following: - Basic policy for measures to extend service life - Specific policy for cost reduction - Structure specifications - Results of most recent inspection and next inspection year - Measures - Start and completion years of measures - Estimated overall project costs for measures In addition, the cost reduction effect of formulating functional preservation plans is verified and their validity is evaluated. Article 5 Meetings and Discussions Meetings and consultations are held three times for both inspection and diagnosis work and plan formulation work: the first meeting, one interim meeting, and a final meeting (before the delivery of the deliverables). The supervising engineer will attend the first meeting, the final meeting, and important meetings. Article 6 Preparation of reports A report will be prepared by summarizing the results of the study of this work.・Work report (1 paper copy, 2 electronically delivered copies (original and copy)) ・Inspection report (survey record sheet, photos of current condition) ・Other as instructed by the investigatorArticle 7 Managing EngineerCivil Engineering-related Construction Consultant Business (over 5 million yen) Managing Engineer1 An individual who meets any of the following criteria. (1) A person who is a professional engineer under the Engineers Act (Act No. 25 of 1983) and meets any of the following requirements. A. In the construction sector, the elective subject is "Roads" or "Steel Structure and Concrete". B. In the agriculture sector, the elective subject is "Agricultural and Rural Engineering (Agricultural Civil Engineering)". (2) An individual who has passed the Civil Consulting Manager (RCCM) qualification examination administered by the Japan Construction Consultants Association and is registered in the "RCCM Registry" kept by the Association, with the specialist field being "Roads" or "Steel Structure and Concrete". (3) An individual who has been certified by the Minister pursuant to the provisions of Article 3, Item 1, (b) of the Construction Consultant Registration Regulations, with the specialist field being "Roads" or "Steel Structure and Concrete". 2. In principle, the supervising engineer cannot be changed until the work is completed. In the event of a change due to unavoidable reasons such as hospital beds, death, or retirement, a person with equal or greater technical ability must be assigned and approval from the client must be obtained. Article 8. Traffic Control Guards When inspecting this work, four traffic control guards will be assigned, but if there are any changes to the number of assigned guards as a result of on-site investigations and discussions with related organizations, this will be subject to design changes. Article 9.The construction machinery used for inspection work is expected to be a bridge inspection vehicle (equivalent to BT-200). If there are any changes to the specifications of the machinery or the number of days of use due to site conditions, etc., this will be subject to design changes in consultation with the client. Article 10 Compliance standards: "Kochi Prefecture Road Bridge Periodic Inspection Guidelines" (Kochi Prefecture Civil Engineering Department Road Division), "Road Bridge Periodic Inspection Guidelines" (Ministry of Land, Infrastructure, Transport and Tourism Road Bureau), "Guidelines for Farm Road Conservation Measures (April 2021)" (Ministry of Agriculture, Forestry and Fisheries), and others will be used as necessary. Article 11 Loaned materials: Existing road bridge periodic inspection inspection reports, and others will be loaned as necessary. Article 12 Other: If there are any other questions, they will be discussed with the survey staff. Shiraiwa-Shinbashi Fureai Bridge Agriculture No. 06088 Shiraiwa-Shinbashi and 1 other bridges functional conservation plan development contract work location map
NAICS
-
CPVS
-
UNSPSC
-
Regions
APEC Countries Asia Eastern Asia
Sectors
Civil Works Building Security Services Bridges and Tunnels Roads and Highways-Bridge Telecommunications Water and Sanitation Law and Legal Transportation Services Roadways Machinery and Equipments-M&E Defence and Security Construction Agriculture-Food and Beverages Consultancy Energy-Power and Electrical Computer Hardwares and Consumables Steel Electronics Building Material Construction Materials
URL
Share
To be notified
when a tender matching your filter is published
To Follow
Tenders
Add New Tender Alert
To Follow
Contracts
Add New Contract Alert
To Follow
Fairs
Add New Fair Alert
Similar Tenders