Tender Details
Title

令和6年度 町単独 宅地造成関連 特環公共下水道管渠埋設工事(1工区) 令和6年度 町単独 宅地造成関連 特環公共下水道管渠埋設工事(1工区) 【注意事項】【注意事項】入 札 公 告 次のとおり条件付一般競争入札を行いますので、地方自治法施行令(昭和22年政令第16号)第... FY2024 Town-only Land Development-related Special Public Sewer Pipe Installation Work (1 section) FY2024 Town-only Land Development-related Special Public Sewer Pipe Installation Work (1 section) [Notes] [Notes] Bidding Announcement We will be conducting a conditional open competitive bidding as follows, so please be aware of the Local Autonomy Law Enforcement Order (Cabinet Order No. 16 of 1947)...

Country
Language
Japanese
Organization
Published Date
16.10.2024
Deadline Date
17.01.2025
Overview
令和6年度 町単独 宅地造成関連 特環公共下水道管渠埋設工事(1工区) 令和6年度 町単独 宅地造成関連 特環公共下水道管渠埋設工事(1工区) 【注意事項】【注意事項】入 札 公 告 次のとおり条件付一般競争入札を行いますので、地方自治法施行令(昭和22年政令第16号)第... 長野県箕輪町   入札情報は以下の通りです。 件名 令和6年度 町単独 宅地造成関連 特環公共下水道管渠埋設工事(1工区) 種別 工事 公示日または更新日 2024 年 10 月 16 日 組織 長野県箕輪町 取得日 2024 年 10 月 16 日 19:23:37 閲覧設計書特記仕様書図面 公告内容 【注意事項】【注意事項】入 札 公 告 次のとおり条件付一般競争入札を行いますので、地方自治法施行令(昭和22年政令第16号)第167条の6の規定により公告します。 令和6年7月24日箕輪町長 白鳥 政徳1 入札に付する事項工 事 名 令和6年度 町単独 宅地造成関連 特環公共下水道管渠埋設工事(1工区)工事か所名 箕輪町 八乙女予 定 価 格 事後公表とする最 低 制 限価 格管路延長 L=49.5m管渠延長VUφ200 L=48.6mマンホール工 2箇所(割込マンホール工 1箇所)取付管及びます工 3箇所付帯工 一式工 事 概 要工 期 契約締結日から 令和6年11月29日 (予定)2 入札に参加する者に必要な資格・地方自治法施行令第167条の4の規定及び箕輪町建設工事等入札参加の資格及び業者の選定に関 する規程第3条第1項、第6条第1項及び第2項の規定に該当しない者であること。 ・入札公告日から落札決定日までの間において、箕輪町の指名停止措置を受けていないこと。 建設業許可土木工事業を有していること。 ただし、下請負金額の合計が4,500万円以上となる場合には、特定建設業許可を有すること。 ・箕輪町入札参加資格者名簿に登載された者であること。 共通事項経 営 事 項審 査経営事項審査結果(開札日から起算して1年7ヶ月以内が審査基準日で、かつ最新のもの)の土木一式工事で総合評点が650点以上であること。 配置技術者主任技術者(公告日より3月前からの恒常的雇用関係にある者)を配置できること。ただし請負金額が4,000万円以上の場合は、専任で配置できること。 下請金額の総額が4,500万円以上の場合は、建設業法第26条に基づく監理技術者(公告日より3月前からの恒常的雇用関係にある者)を専任で配置できること。 地 域 要 件 町内の本店で建設業法上のものであること。(町内に本店を設置した後5年を経過していること。)そ の 他3 入札又は開札の場所及び日時等入 札 書 提出 期 限令和6年8月6日(火) 午後5時15分一般書留・簡易書留・配達記録郵便による郵送、または箕輪町役場企画振興課まで直接提出入札書等を提出する際に、町が依頼する除雪業務に協力する承諾書の提出ができること。 開札経過、入札結果の公表は箕輪町公式ホームページに随時掲載入札書提出については、箕輪町の休日を定める条例(平成元年条例第33号)第1条の規定する箕輪町の休日(以下「休日」という。)を除く午前8時30分から午後5時15分まで(正午から午後1時までを除く。)とします。 4 契約条項、設計図書等を示す場所及び日時開 札 日 時及 び 入 札結 果 公 表令和6年8月8日(木) 午前9時00分 箕輪町役場2F 大会議室設計図書等の閲覧及び入手箕輪町役場 水道課 水道工事係質問書の受付受付期間 令和6年7月24日(水) 質問書様式により、直接又は、FAX・メールで提出(電話等により受領確認を行うこと)箕輪町役場 水道課 水道工事係~ 令和6年7月31日(水)受付場所質問の回答 令和6年7月29日(月) から箕輪町公式ホームページに掲載(随時更新)設計図書等の閲覧及び入手、質問書の受付については、休日を除く午前8時30分から午後5時15分まで(正午から午後1時までを除く。)とします。 《算定方法》①直接工事費の97% ②共通仮設費の90% ③現場管理費の90% ④一般管理費の68%※上記①~④の合計額※①~④の各段階で端数処理(1円未満を切り捨て)を行い、①~④の合計額に対しては1万円未満を切り捨てる。 ※上記算定式による額が、予定価格の92%を超える場合は92%の額とし、75%に満たない場合は75%の額とする。 (1万円に満たない端数があるときは、1万円未満を切り捨てる。)5 入札保証金に関する事項受注希望型競争入札(事後審査)入札条件注意書の7に示すとおり。 6 入札の無効等受注希望型競争入札(事後審査)入札条件注意書の11に示すとおり。 7 その他一般競争に関し必要な事項支 払 条 件箕輪町財務規則第75条の2の規定に基づき契約金額の4割の範囲内で前金払の適用あり。 箕輪町財務規則第135条の規定に基づき部分払の適用あり。 中間前金払の適用なし。 落 札 者 の決 定本件入札は、開札後に最低価格入札者の入札参加者に必要な資格を審査し、資格を満たしていることが確認できた場合に、当該入札者を落札者と決定しますので、指示のあった者は、指示があった日から起算して2日以内(休日を除く)に、次に掲げる書類を入札担当まで持参提出してください。 (1) 様式「入札参加資格審査書類の提出について」(2) 建設業許可証明書の写し(3) 経営事項審査結果通知書の写し(審査基準日が開札日から1年7月以内で最新のもの)そ の 他・その他「受注希望型競争入札(事後審査)入札条件注意書」に示すとおりです。 この入札公告に関する担当係等発 注 担 当FAX 0265-79-0230 E-mail suido@town.minowa.lg.jp箕輪町役場 水道課 水道工事係入 札 担 当住所 〒399-4695 長野県上伊那郡箕輪町大字中箕輪10298番地電話 0265-79-3152 内線 1153 FAX 0265-79-0230 E-mail kizai@town.minowa.lg.jp箕輪町公式ホームページ https://www.town.minowa.lg.jp/箕輪町役場 企画振興課 まちづくり政策係除雪業務に協力する承諾書に関する こ と本件入札は、除雪業務に協力する旨の承諾書を提出した者のみの入札書等を有効とし、それ以外については、受注希望型競争入札(事後審査)入札条件注意書の11(2)テに基づき、無効とします。 入札書等を提出する際、別紙の承諾書に必要事項を記載し押印後、内訳書と同様に外封筒へ同封してください。 なお、令和6年度の入札において、承諾書を提出してある場合は、必要ありません。 【落札候補者がいない場合の措置】「受注希望型競争入札(事後審査)入札条件注意書」の10(3)に示すとおり。 (4) 配置する技術者の資格を証明する書類の写し(5) 配置する技術者の恒常的雇用関係を証明する書類の写し◆外封筒及び中封筒貼り付け用紙(キリトリ線に添って切り取り、外封筒及び中封筒に糊で貼り付けてください)【外封筒用】キ リ ト リ提出締切日 8月6日〒399-4695長野県上伊那郡箕輪町大字中箕輪10298番地入 札 書 在 中 ( 開札日 令和6年8月8日 )箕輪町役場 企画振興課 まちづくり政策係 行工事(業務)名 令和6年度 町単独 宅地造成関連 特環公共下水道管渠埋設工事(1工区)工事(業務)箇所名 箕輪町 八乙女商号又は名称 住 所 キ リ ト リ【内封筒用】キ リ ト リ開 札 日 令和6年8月8日工事(業務)名 令和6年度 町単独 宅地造成関連 特環公共下水道管渠埋設工事(1工区)工事(業務)箇所名 箕輪町 八乙女商号又は名称 住 所 担当者名担当者連絡先(電話) ( )担当者連絡先(FAX番号) ( )キ リ ト リ◆入札書受領書(入札書を持参により提出する場合で、受領した書類が必要な方は、必要事項を記入し切り取って持参してください。)キリトリ入 札 書 受 領 書開 札 日 令和6年8月8日工事(業務)名 令和6年度 町単独 宅地造成関連 特環公共下水道管渠埋設工事(1工区)工事(業務)箇所名 箕輪町 八乙女応 札 者受領印 箕輪町役場 企画振興課 まちづくり政策係箕輪町が依頼する除雪業務に対する承諾書 町が発注する工事等の入札へ参加するにあたり、町から依頼のあった除雪業務について協力することを承諾します。 商号又は名称印代 表 者令和 年 月 日箕輪町長 白鳥 政徳 様住 所 - 1 -施工条件明示書(特記仕様書)箕輪町役場 水道課工 事 名 令和6年度 町単独 宅地造成関連 特環公共下水道管渠埋設工事(1工区)工事箇所 箕輪町 八乙女工事の実施にあたっては、指定された図書を参考とし、かつ以下の事項について施工条件とする。本工事の施工に当たっては、長野県建設部制定の工事共通仕様書・各種施工管理基準・出来型管理基準・写真管理基準等に基づいて実施すること。本工事の最終請負金額(税込)が1,000万円以上の場合については、箕輪町建設工事等成績評定要領に基づき評価の対象工事とするので留意のこと。1 工事内容(1) 工事概要:閲覧設計書のとおり工 種 延長・位置等 設 計 内 容下水道管布設工 管渠L=48.6m VUφ200マンホール工 割込み1箇所、1号1箇所取付管及びます工 3箇所(2)本工事箇所に関連する測量、設計委託及び地質調査等の報告資料は、閲覧が可能である。また、契約後は貸与も可能である。2 工期関係工期は、令和6年11月29日までとする。3 工程関係、通行制限等(1)本工事実施において、耕作時期に重なる時は地元と工程調整を行うこと。(2)道路内工事における全面通行止及び片側通行止を行う場合は、上伊那広域連合火災予防条例第45条の規定により事前に消防署長へ様式第13号の「道路工事等届出書」にて届出すること。(3)本工事において施工期間・施工方法等に下記の制約条件があるため、適切な処置を行うこと。なお、連絡及び調整事項の内容を監督員に報告すること。制約条件 位置等 制約条件・内容等上水道管布設工事 同施工区間同施工範囲にて町発注上水道工事が予定されているため、工程調整・監理を行うこと。(同時埋設)(3)本工事において、下記のとおり関係機関及び地域住民との協議をするものとしている。なお、通行制限実施にあたっては、関係機関及び道路管理者と十分協議のこと。関係機関等 事 項 制約内容 時 期八乙女区 協議 工程、区内道路の使用方法等 工事開始前近隣住民 通知等 〃 〃4 工事実績情報の登録(1)工事請負額が500万円以上の工事については、工事実績情報(工事カルテ)の登録をすること。(2)登録する場合は、予め監督員の確認を受け、次に示す期間内に(財)日本建設情報総合センター(JACIC)に登録の手続きを行うとともに登録されたことを証明する資料を監督員に提出する。なお、変更時と完成時の間が10日間に満たない場合は、変更時の提出を省略できるものとする。- 2 -① 工事受注時 契約締結後10日以内② 登録内容の変更時 変更契約締結後10日以内③ 工事完成時 工事完成後10日以内5 施工計画書(1)施工計画書は、設計図書、「長野県土木工事共通仕様書」・本特記仕様書及び現場条件等を考慮し、着手後15日以内に作成し提出すること。(2)変更契約後及び変更内容発生時については、「変更施工計画書」を作成し、提出すること。6 施工体制台帳(1)受注者は、下請金額に関わらず全ての工事について、建設業法に定める「施工体制台帳」とそれに係る書類及び「施工体系図」を作成し、工事期間中工事現場に備え付けること。(2)「施工体系図」は工事関係者及び公衆の見やすい場所に掲示すること。(3)受注者が契約する下記業種についても建設業の請負工事同等に扱い「施工体制台帳」及び「施工体系図」に記載すること。①交通整理員、ガードマン②特別産業廃棄物処理業者、産業廃棄物処理業者③ダンプ運転手④1日で完了する請負契約、小額な作業・雑工・労務のみの単価契約の請負契約⑤クレーン作業、コンクリートポンプ打設等の日々の単価契約で行っているもの⑥クレーン等の業種オペレーターを機械と一緒にリース会社から借上げる場合⑦他の会社から応援者を借上げ、請負契約を締結した場合(臨時雇用関係である場合を除く)※施工体制台帳に記載すべき事項・建設業法第24条の7第1項及び同施行規則14条の2に掲げる事項・安全衛生責任者、安全衛生推進者、雇用管理責任者、監理技術者、主任技術者他・社会保険加入状況(4)「下請負人一覧表」を添付した「施工体制台帳」及び「施工体系図」の写しを提出すること。7 用地関係(1)借地等の復旧については、原形復旧を原則とし、所有者、管理者等と立ち会いの上、借地期間内に返還まで完了すること。(2)借地等の復旧箇所については、着手前の状況を写真や測量成果等で記録するとともに、境界杭や構造物の移動については引照点等を設けるなど適切な管理を行い、必要に応じて所有者等の立ち会いを実施し了解を得たうえで着工しなければならない。(3)請負者側で必要な用地の借用、及びこれに伴う諸手続については、請負者側で対応すること。 特に「農地の一時転用」については、事前に地方事務所農政課、市町村、農業委員会等と調整をすること。(4) 施工箇所内に境界鋲、境界杭等が設置されている場合は本工事にて復元することになる。H8.7.9 伊那建設事務所「工事における幅杭の取り扱いについて」を準用し、施工前に 2 点以上の不動点(コンクリート擁壁の角等)または控え杭からの距離を記録しておくこと。なお、隣接土地所有者の立会いを要する場合があるので、留意されたい。8 周辺環境保全関係(1)建設機械は低騒音型、低振動型、排出ガス対策型機械使用を原則とする。別紙-1『排出ガス対策型機械』のとおり。(2)汚水、汚濁、土砂の流出防止に努め、特に現場発生残土等各種資材を搬出時には、運搬車両等から土砂を確実に除去してから一般道へ出ること。なお、一般道が当該工事による原因で破損及び汚れた場合は、請負者の責任において処置すること。(3)特に住宅近接地域での騒音・振動等、水田や畑への排水の流出等の公害防止対策を事前に十分検討するとともに、問題が生じた場合は速やかに対処すること。運搬ルートは影響の少ないルートを選定すること。- 3 -(4)現場において、特別な取組等がある場合については、「別紙様式1」をしゅん工書類に添付し積極的に報告すること。9 過積載の禁止(1)工事の施工計画にあたって、施工計画書に次の事項を具体的に記載するとともに、施工時は遵守すること。①積載重量制限を超過しての建設発生土、建設副産物、廃材の処理及び資機材(以下「資機材等」という。)の積載重量の厳重チェックを行うこと。②過積載を行っている資材納入業者から、資材等購入は行わないこと。③過積載を防止するため、資機材等の購入に際しては納入業者の利益を不当に害することのないようにすること。④資機材等の運搬には、さし枠装着車、物品積載装置等の不正改造した車輌及び不表示車等を使用しないこと。また、同車輌からの資機材等の引渡しを受けないこと。⑤下請事業者や資機材等納入業者を選定するにあたっては、交通安全に関する配慮に欠けた者または車輌を使用した業務等において悪質かつ重大な事故を発生させた者を排除すること。⑥飛散の恐れのあるものについては、飛散しないような処置を行い運搬すること。⑦土砂等の運搬に関する事業者の選定にあたっては、「土砂等を運搬する大型自動車による交通事故の防止等に関する特別措置法」の目的に鑑み、同法第12条の規定に基づき届け出た団体構成員の雇用に努めること。(2)以上の点について、下請事業者についてもこれに準じ徹底すること。10 安全対策関係(1)工事現場に置いては、共通仕様書1-1-40 に基づき、労働災害、公衆災害防止に努めるとともに、全作業員を対象に定期的に安全教育、研修及び訓練を行うこと。(2)安全教育、研修及び訓練については、工事期間中、月一回(半日)以上実施し、この結果は工事日誌へ記録するほか工事写真等も整理のうえしゅん工検査時に提示(確認後返却)すること。(3)交通安全施設については、下記により実施することを原則とする。・仮設ヤードまわりは、パネルフェンス等を単管等で固定し、公衆の安全対策を講じること。・車道部分に接し、車など飛び込みの恐れのある場合はガードレール・視線誘導板、回転燈等を設置するとともに、特に夜間の安全対策に配慮のこと。(4)足場を設ける場合は、「「手すり先行工法に関するガイドライン」について」(厚生労働省 基発第0424001号令和21年4月24日)の「手すり先行工法等に関するガイドライン」により、「働きやすい安心感のある足場に関する基準」に適合する手すり、中さん及び幅木の機能を有する足場とし、足場の組立て、解体又は変更の作業は、「手すり先行工法による足場の組立て等に関する基準」の2の(2)手すり据置き方式又は(3)手すり先行専用足場方式により行うこと。(5)送電線・配電線付近での工事は、労働安全衛生法、労働安全衛生規則、労働基準局長通達(昭和50年12月17日基発第759号)により下記安全距離を確保した施工を遵守すること。なお、電力会社との電気事故防止打ち合わせは無料であるので、架空電線に対する危険防止措置の義務にて事前に協議のこと。種 別 送電電圧 がいし個数 安全距離配電線100~200ボルト送電線に比べ小さながいしが1個 2m6千6百ボルト送電線 2~3万ボルト 3~4個 3m7万7千ボルト 5~9個 4m15万4千ボルト 7~21個 5m27万5千ボルト 16~25個 7m50万ボルト 20~41個 11m・送電線関係連絡先中部電力㈱ 飯田電力センター送電課 (0265-53-6919)関西電力送配㈱ 木曽送電センター (0264-52-5681)- 4 -・配電線関係連絡先中部電力パワーグリット㈱ 伊那営業所(0120-984-822)(6)本工事において、受注者は法定外の労災保険に付さなければならない。工事請負契約書第50 条(火災保険等)に基づき、受注者は保険契約を締結したときは、その証券等を町は確認することとされているので提示すること。11 仮設工事関係(1)一般道路を使用する場合公道および私道を工事用道路として使用する場合は、交通整理、安全管理を十分に行い、事故・苦情が無いようにすること。また、道路及び付属施設を破損した場合は、請負者の責任において速やかに原型復旧すること。(2)請負者に起因する工期延長等にともなう、仮設材損料・賃料期間の設計変更は原則行わない。(3)指定仮設備仮設備名 設 計 条 件 特 記 事 項濁水処理プラント m3/h脱水処理装置 l/mi(4)仮設工は、撤去を原則とするが、仮設土留工、仮橋、足場等のうち、設計書に明示した部分は撤去しないものとする。なお、現場条件により周囲の構造物等に影響を与えると認められる場合は撤去方法について協議をすること。仮設物 内 容 期 間 条件等12 建設副産物関係本工事の請負金額が500万円以上の場合については、長野県制定の「公共建設工事における分別解体等・再資源化等及び再生資源活用工事実施要領(土木)」により施行することになるので、留意のこと。なお、事前説明(通知)は法第12条第1項の規定にて契約前となっているので特段の配慮をお願いする。(1)建設副産物処理建設副産物処理費は、施設毎の処理費と運搬費の合計が最も経済的な処理施設を選定している。 受注者においても建設リサイクル法第5条の趣旨に準じ建設副産物の再資源化等に要する費用を低減するように努めること。建設資材廃棄物は、建設リサイクル法9条に則りその種類ごとに分別すること。本工事において生じる建設発生土及び産業廃棄物等の処分は、下記の条件を想定して処分費・運搬費を計上している。なお、請負者の都合による処分先の変更については原則として設計変更しない。(2)建設発生土受入場所・仮置き場所 処分方法 運搬距離 特記事項任意 指定 2km建設発生土が500m3以上の処理となる場合は指定するが、500m3未満の処理となる場合は原則として請負請業者による任意とするので留意のこと。処分地を変更する場合は発注者と協議を行うこと。(3)特定建設資材(建設リサイクル法)本工事の請負金額が500万円以上の場合は、請負者は発注者から「通知」の「写し」を受け取ること。請負者は、下請がある場合は下請負業者に対し「通知書」の「写し」を添付して「告知書」にて告知すること。再資源化等が完了した時は、発注者に「再資源化等報告書」にて竣工時に報告すること。種 別 処分条件 処分先・運搬距離 備 考- 5 -アスファルト塊 再利用 南重リサイクルプラント 8.8Km数量は設計書記載のとおりセメントコンクリート塊無筋Co再利用鉄筋Co再利用二次製品再利用建設資材木材※排出する対象物が設計寸法と異なる場合は、発注者と協議すること。寸法等を確認できる資料を提出すること。(4)産業廃棄物(建設廃棄物処理指針)種 別 処分条件 処分先・運搬距離 備 考木くず(抜根・伐採材) 再利用汚 泥 再利用その他(金属くず他) 再利用※積算に用いる木くず処理量の体積-重量換算は実施設計単価表に記載される換算係数を用いる。なお、体積(m3)での確認となる場合は、体積を確認できるよう 1 台毎写真管理すること。(5)建設副産物の運搬・処理についてア 建設副産物の運搬を廃棄物処理業者に委託する場合は、必ず書面による委託契約を締結すること。イ 廃棄物の運搬・処理・処分を業とする「許可証」を確認し、その「写し」を工事資料に添付すること。ウ 下請業者が建設副産物を運搬・処理・処分を行う場合でも、下請契約とは別に委託契約を締結すること。エ 「マニフェスト(産業廃棄物管理表)」により、適切に運搬・処理・処分されているか確認を行うとともに、マニフェスト(A、B2、D、E表)は受注者にて保管に留め、しゅん工書類への添付は要さない。しゅん工書類には、廃棄物ごとに数量集計表のみ添付すること。ただし、しゅん工検査時には全表の原本を持参のうえ検査員等の確認を得ること。(その他段階検査他にて監督員等が原本の確認を行う場合があるので留意されたい)再資源施設・最終処分場の関係を示す写真をしゅん工書類に添付のこと。オ 請負者が施工計画書に記載若しくは整備すべき事項は以下のとおりとする。※該当するものを選択する処理方法※ 1再資源化 2破砕処理 3焼却処理 4埋立処分場 5その他処 分 先(業 者)業 者 名住 所許可番号運 搬 委 託先(委託の場合)業 者 名住 所許可番号そ の 他 資源化の方法など・添付書類ア 処理先の許可書の写し及び収集運搬業者の許可の写し(収集運搬を委託する場合)イ 請負者と処理又は運搬業者との契約書の写しウ 処理業者の所在地及び計画運搬ルート- 6 -エ 下請がある場合は、告知書の写しオ 「公共建設工事における分別解体等・再資源化等及び再生資源活用工事実施要領(土木)」の「別紙4-1」説明書及び「別紙4-2」分別解体等の計画等(6)「再生資源利用計画書・実施書」「再生資源利用促進計画書・実施書」の提出ア 施工計画書にあわせて①「再生資源利用計画書」及び②「再生資源利用促進計画書」を提出する。① 対象 … 土砂1000m3以上、砕石500t以上、As合材200t以上の搬入② 対象 … 土砂1000m3以上、Co殻・As殻・木くずの合計200t以上の搬出イ しゅん工時に「再生資源利用実施書」及び「再生資源利用促進実施書」を作成し、提出する。対象は上記同様ウ 提出様式は、原則としてCOBRIS(建設副産物情報交換システム、通称コブリス)を利用し作成すること。これにより難い場合は監督員との協議により、「建設リサイクル報告様式(EXCEL)」によることも可能とする。エ COBRISを利用した場合は、データの提出を要しない。オ 対象は「公共建設工事における分別解体等・再資源化等及び再生資源活用工事実施要領(土木)」による。(7)処分量の確認建設副産物の処分量を確認するため、監督員・検査員等から請求書、伝票等の提示を求められた場合は応じなければならない。残土処理については、作業状況の写真に加え、処分量がわかる資料(1箇所であれば、幅・長の分かる写真、数カ所であれば、一覧表を作り運搬業者からの伝票)を添付する。13 品質及び技術管理関係(1)建設資材の品質記録保存土木構造物について建設資材の品質記録を作成し、工事完了時に提出する。(現場必携P.66)(2)工事カルテ作成、登録について請負者は、工事請負代金額500万円以上の工事について、工事実績情報サービス(CORINS)入力システム((財)日本建設情報総合センター)に基づき、受注・変更・完成・訂正時に工事実績情報として、「工事カルテ」を作成し監督員の確認を受けた上、受注時は契約後 10 日以内に、登録内容の変更時は変更があった日から10日以内に、完成時は工事完成後10日以内に、訂正時は適宜登録期間に登録申請しなければならない(ただし、工事請負代金額 500 万円以上 2500 万円未満の工事については、受注・訂正時のみ登録するものとする)。また、登録を行い発行された「工事カルテ受領書」の写しを監督員に提出する。提出期限は、以下のとおりとする。・受注時登録の提出期限は、契約締結後10日以内とする。・完了時登録の提出期限は、しゅん工検査日までとする。・施工中に、受注時登録データの内容に変更があった場合は、変更があった日から 10 日以内とする。なお、竣工(完了)時登録済データに対して、訂正(削除)をする場合は、発注者の確認印を押印した発注機関確認書が必要になります。(3)建設資材のうち、コンクリート圧縮強度試験及び鉄筋試験等については、原則として、建設技術センター試験所にて行うこと。また、圧縮試験供試体には、請負者の主任技術者又はコンクリート担当技術者がサインしたQC版を入れる。(4)コンクリート品質管理の取扱いについてア コンクリート担当技術者の配置・請負者は、50m3以上のコンクリート工事においては、コンクリート担当技術者を配置する。 ・同技術者は、現場代理人との兼務は不可であるが、主任技術者及び監理技術者との兼務は可能であり、施工計画書に明示する。イ 責任分界点からの請負者が行う品質管理請負者は「責任分界点」から先の全ての品質管理に責任を負うものであり、品質管理のための試験等を生コン会社に委託した場合には、その全てに立ち合うとともに、その記録及び写真を竣工成果品として提出するものとする。なお、上記において立会の証としてコンクリート担当技術者が必ず写真に写っているものとする。- 7 -ウ 生コン納品書(伝票)の扱い・生コン納品書は竣工成果品として提出するものとする。・納品書には、工場発時間、現場着時間及び打設完了時間を記入するものとする。(5)技術管理費には、トンネル・橋梁・砂防・その他指定した構造物に関して、マイクロフィルム製作費(2本)、縮刷製本費(3部)が含まれているのでこれらを実施すること。(6)工事に使用する資機材等の承認本工事で使用する資機材等は「材料承認願い」を提出して承認を得ること。ただし、令和2年5月25日付、2建第73号にて通知した一括承認済の材料は「材料承認願い」の提出は不要である。監督員の指定する二次製品等にかかる構造計算書・安定計算書を「材料承認願い」と同時に提出すること。14 資材の県内産優先使用(1)受注者は、本工事に使用する材料については、規格・品質等の条件を満足するものについては、県内産資材を優先使用するよう努めること。(2)受注者は、工事用資材の調達にあたっては、極力県内の取り扱い業者から購入すること。(3)受注者は、本工事に県外産資材を使用する場合は、次に示す資材について、その資材名及び県内産資材を使用しない理由などを「県外産資材使用報告書」に記入し提出すること。・地業工事(砂利) ・コンクリート工事(生コン) ・舗装工事(路盤材料)(4)受注者は、下請契約を締結する際は、極力町内業者とすること。15 セメント及びセメント系固化材を使用した改良土について(1)セメント及びセメント系固化材を使用した地盤改良及び改良土を再利用する場合は、六価クロム溶出試験を行い、その結果について報告すること。(2)セメント及びセメント系固化材とは、セメントを含有成分とする固化材で、普通ポルトランドセメント、高炉セメント、セメント系固化材、石灰系固化材をいい、これに添加物を加えたものを含める。(3)六価クロム溶出試験は「セメント及びセメント系固化材を使用した改良土の六価クロム溶出試験実施要領(案)」(以下、「実施要領(案)」という。)により実施し、土壌環境基準を超えないことを確認する。実施要領(案) http://www.mlit.go.jp/tec/kankyou/kuromu.html16 監督員の実施する検査又は試験監督員が実施する主な段階検査及び試験は下記のとおりである。該当時には、監督員に必ず立会いを求めること。なお、これ以外の施工途中において町職員または町長の指定する者の抜打ち検査を実施することがあるので、検査に協力すること。項 目 内 容 備 考起工測量後 丁張り設置状況の確認床堀完了時 床堀幅・基準高・土質及び湧水状況・支障物件等の確認基礎工施工時 基礎工位置・高さ・形状・寸法等の確認型枠組立完了時 型枠工位置・高さ・形状・寸法等の確認鉄筋組立完了時 設計寸法との照合・鉄筋径及び間隔等の確認主要な施工段階の区切り目工事期間中において適宜管路布設工完了時 接合状況・管通し・通水状況等の確認 管渠工事に適用出来型 出来型数量の実測確認その他 監督員が必要と認める段階※ 工事完成後に明視できない箇所(不可視部)については、監督員の確認を必ず受けること。段階確認は、机上で行うこともできる。この場合は請負者が必ず立会い、確認部分の検査記録表及び施工管理資料及び写真を提示すること。- 8 -17 その他(1)建設産業における生産システムの合理化指針の遵守等について工事の適正かつ円滑な施工を確保するため、「建設産業における生産システムの合理化指針」において明確にされている総合・専門工事業者の役割に応じた責任を的確に果たすとともに、適正な契約の締結、適正な施工体制の確立、建設労働者の雇用条件等の改善等に努めること。(2)建設工事の適正な施工の確保について一 建設業法(昭和 24 年 法律第 100 号)及び公共工事の入札及び契約の適正化の促進に関する法律(令和 12 年 法律第 127 号)に違反する一括下請その他不適切な形態の下請契約を締結しないこと。二 建設業法第 26 条の規定により、請負者が工事現場ごとに設置しなければならない専任の主任技術者または専任の監理技術者については、適切な資格、技術力等を有する者(工事現場に常駐して、専らその職務に従事する者で、請負者と直接的かつ恒常的な雇用関係にあるものに限る)を配置すること。三 請負者が工事現場ごとに設置しなければならない専任の監理技術者のうち、当該建設工事に係る建設業が指定建設業である場合の監理技術者は、建設業法第 15 条第2号イに該当する者または同号ハの規定により建設大臣が同号イに掲げる者と同等以上の能力を有するものと認定した者で、監理技術者証の交付を受けている者を配置すること。この場合において、監理技術者の写しを契約時に提出する。また発注者から請求があったときは、資格者証を提示すること。四 一、二、及び三のほか、建設業法等に抵触する行為は行わないこと。(3)労働福祉の改善等について建設労働者の確保を図ること並びに労働災害の防止、適正な賃金の確保、退職金制度及び各種保険制度への加入等労働福祉の改善に努めること。(4)建設業退職金制度について一 建設業者は、自ら雇用する建退共制度の対象労働者に係る共済証紙を購入し、当該労働者の共済手帳に共済証紙を貼付すること。二 建設業者が下請契約を締結する際は、下請業者に対して、建退共制度の趣旨を説明し下請業者が雇用する建退共制度の対象労働者に係る共済証紙をあわせて購入し現物により交付すること、または建退共制度の掛金相当額を下請代金中に算入することにより、下請業者の建退共制度への加入並びに共済証紙の購入及び貼付を促進すべきこと。三 請負代金の額が800万円以上の建設工事の請負契約を締結した時は、建設業者は建退共制度の発注者用掛金収納書(以下「収納書」という。)を工事締結後1ヶ月以内に発注者に提出すること。 なお、工事契約締結当初は工場製作の段階であるため建退共制度の対象労働者を雇用しないこと等の理由により、期限内に当該工事に係る収納書を提出できない事情がある場合又は、建退共対象労働者を使用しない場合においては、あらかじめその理由および共済証紙の購入予定時期を書面により申し出ること。四 建設業者は三の申し出を行った場合、請負代金額の増額変更があった場合等において、共済証紙を追加購入したときは、当該共済証紙に係る収納書を工事完成時までに提出すること。なお、三の申し出を行った場合または請負代金額の増額変更があった場合において、共済証紙を追加購入しなかったときは、その理由を書面により申し出ること。五 共済証紙の購入状況を把握するため必要があると認めるときは、共済証紙の受払簿その他関係資料の提出を求めることがある。六 建退共制度に加入せず、または共済証紙の購入若しくは貼付が不十分な建設業者については、入札等において考慮することがある。七 下請業者の規模が小さく、建退共制度に関する事務処理能力が十分でない場合には、元請業者に建退共制度への加入手続き、共済証紙の共済手帳への貼付等の事務の処理を委託する方法もあるので、元請業者においてできる限り下請業者の事務の受託に努めること。(5)常に意識を持ってコスト縮減に取り組み、設計に反映できるように努める。(6)建設現場における福祉改善や労働時間の改善、または地域住民に対する工事現場の開放やPRなど、建設産業に対する理解の増進に資する事業の実施等の構造改善対策にも配慮する(7)暴力団関係者等から工事妨害などの被害を受けた場合は、速やかに被害届を警察に提出する。- 9 -(8)生コンクリートをはじめとして、主要な材料は管内工場の価格により積算しているため、これらを管外から搬入する場合は、協議すること。(9)通行制限実施にあたっては、関係機関及び道路管理担当者と十分協議のこと。(10)現場代理人・主任技術者等は、各種約款等に記載された職務内容を迅速かつ適切に行うこと。18 創意工夫・社会性に関する実施状況の提出について請負者は、工事施工において、自ら立案実施した創意工夫に関する項目、又は、地域社会への貢献として評価できる項目に関する事項について、工事完了時までに所定の様式により提出することができる。創意工夫・社会性等の具体的内容がある場合は、下記の「別紙様式2」及び、「説明資料」を提出すること。なお、用紙サイズはA4版とする。- 10 -別紙-1『排出ガス対策型機械』排出ガス対策型建設機械の原則使用について本工事において以下に示す建設機械を使用する場合は、「排出ガス対策型建設機械指定要領(平成3年10月8日付 建設省経機発第249号)に基づき指定された排出ガス対策型建設機械を使用するものとする。排出ガス対策型建設機械を使用できない場合は、令和7年度建設技術評価制度公募課題「建設機械の排出ガス浄化装置の開発」、またはこれと同等の開発目標で実施された民間開発建設技術の技術審査・証明事業、あるいはこれと同等の開発目標で実施された建設技術審査証明事業により評価された排出ガス浄化装置を装着することで、排出ガス対策型建設機械と同等とみなす。ただし、これにより難い場合は、監督員と協議するものとする。排出ガス対策型建設機械あるいは排出ガス浄化装置を装着した建設機械を使用する場合、現場代理人は施工現場において、使用する建設機械の写真撮影を行ない、監督員に提出するものとする。排出ガス対策型建設機械を原則使用する機種機 種 備 考一般工事用建設機械・バックホウ・トラクタショベル(車輪式)・ブルドーザ・発動発電機(可搬式)・空気圧縮機(可搬式)・油圧ユニット(以下に示す基礎工事用機械のうち、ベースマシーンとは別に、独立したディーゼルエンジン駆動の油圧ユニットを搭載しているもの;油圧ハンマ、バイブロハンマ、油圧式鋼管圧入・引抜機、油圧式杭圧入引抜機、アースオーガ、オールケーシング掘削機、リバーサーキュレーションドリル、アースドリル、地下連続壁施工機、前回転型オールケーシング掘削機)・ロードローラ、タイヤローラ、振動ローラ・ホイールクレーンディーゼルエンジン(エンジン出力7.5kw以上260kw以下)を搭載した建設機械に限る。- 11 -別紙様式1環境配慮に関する実施状況工事名工事箇所施工業者名【実施内容】【図面・写真等】説明資料は簡潔に作成するものとし、必要に応じて別葉とする。- 12 -【別紙様式2】創意工夫・社会性に関する実施状況工事名 令和○○年度 ○○○○○○ 工事 請負者名 ㈱○○建設項 目 評価内容 備 考□創意工夫 □準備・後片付け □測量・位置出し□施工関係 □代替材の適用□土工・舗装・コンクリート打設等の施工関係□設備工事の加工組立、電気工事の配線配管等□給排水・衛生設備工事の凍結防止策、つなぎ等□仮設計画及び施工□運搬車両・施工機械等□品質関係 □集計ソフト等の活用□土工・設備・電気関係□コンクリート打設関係□使用材料□配管・溶接作業等□安全衛生関係 □安全仮設備等□安全教育・講習会・パトロール等□現場事務所等□交通事故防止・交通確保等□工事看板等□環境配慮関係 □環境負荷の低減等への積極的な取り組み□ゴミの減量化、アイドリングストップの励行等□積極的な再生資源・材料の利用□施工管理関係 □施工計画書及び写真管理等□CAD、施工管理ソフト等の活用□その他 □その他□社会性等 □地域への貢献等 □河川等の環境保全の実施(地域社会や住民 □現場周辺地域の環境保全、動植物の保護に対する貢献) □作業現場の周辺地域との調和□地域住民とのコミュニケーション□ボランティア活動等□災害時等の地域への援助・救援活動□その他○作成にあたっての注意事項1.該当する項目に□に、レ点マーク記入。2.該当項目以外にも評価できる内容がある場合には、その他として項目を設けるものとする。3.具体的内容の説明として、写真・ポンチ絵等を説明資料に整理。- 13 -創意工夫・社会性等に関する実施状況 説明資料工事名 令和○○年度 ○○工事 /項 目 評価内容提案内容(説明)(添付図)○作成にあたっての注意事項1.説明資料は簡潔に作成するものとし、必要に応じて別葉とする。 FY2024 Town-only land development related Special Environmental Public Sewerage Pipe Installation Work (1 section) FY2024 Town-only land development related Special Environmental Public Sewerage Pipe Installation Work (1 section) [Notes] [Notes] Bidding announcement A conditional open competitive bidding will be conducted as follows, so in accordance with the Local Autonomy Act Enforcement Order (Cabinet Order No. 16 of 1947)... Minowa Town, Nagano Prefecture Bidding information is as follows. Subject 2024 Town-only residential land development-related Special Environmental Public Sewer Pipe Installation Work (1 section) Type Construction Date of announcement or update October 16, 2024 Organization Minowa Town, Nagano Prefecture Date of acquisition October 16, 2024 19:23:37 View design documents, special specifications, drawings Announcement contents [Notes] [Notes] Bidding announcement A conditional open competitive bidding will be held as follows, and this is announced pursuant to Article 167-6 of the Enforcement Order of the Local Autonomy Act (Cabinet Order No. 16 of 1947). July 24, 2024 Mayor of Minowa Town Masanori Shiratori 1. Items to be put up for bidding Name of work: 2024 Town-only residential land development related special public sewer pipe installation work (1 work section) Work name: Minowa Town Yaotome Estimated price: Minimum limit price to be announced after the fact Pipe length L = 49.5m Pipe length VU φ 200 L = 48.6m Manhole work 2 locations (1 inset manhole work) Attachment pipe and inlet work 3 locations Ancillary work Complete work Project outline Construction period From the date of contract conclusion November 29, 2024 (planned) 2. Qualifications required for those participating in the bid: The provisions of Article 167-4 of the Enforcement Order of the Local Autonomy Act and the qualifications for participating in the bid for Minowa Town construction work, etc. and the selection of contractors - The bidder must not fall under the provisions of Article 3, Paragraph 1, Article 6, Paragraphs 1 and 2 of the Regulations. - The bidder must not have been subject to a suspension of bids from Minowa Town between the date of announcement of bids and the date of decision on the successful bid. - The bidder must hold a construction business license for civil engineering work. However, if the total subcontract amount is 45 million yen or more, a specific construction business license must be held. - The bidder must be listed on the Minowa Town list of bidders eligible to participate. - The bidder must have a total score of 650 points or more for civil engineering works in the results of the common business business review (the review date is within one year and seven months from the date of opening of bids and the latest one). - The bidder must be able to assign a chief engineer (a person who has been in a permanent employment relationship for three months prior to the date of announcement). However, if the contract amount is 40 million yen or more, the bidder must be assigned on a full-time basis. If the total subcontract amount is 45 million yen or more, a full-time supervising engineer (a person who has been in a permanent employment relationship for three months prior to the date of announcement) based on Article 26 of the Construction Business Act must be assigned. Area requirements The head office must be within the town and must be in accordance with the Construction Business Act. (Five years must have passed since the head office was established within the town.) Other 3. Place and date/time of bidding or bid opening, etc. Bid submission deadline: Tuesday, August 6, 2024, 5:15 p.m. Post by regular registered mail, simple registered mail, delivery record mail, or submit directly to the Planning and Promotion Division of Minowa Town Hall When submitting bids, etc., a letter of consent to cooperate with snow removal work requested by the town must be submitted. The process of bid opening and the announcement of bid results will be posted on the official Minowa Town website from time to time. Bid submissions shall be made between 8:30 a.m. and 5:15 p.m. (excluding noon to 1:00 p.m.), excluding Minowa Town holidays (hereinafter referred to as "holidays") as stipulated in Article 1 of the Minowa Town Holidays Ordinance (Ordinance No. 33 of 1989). 4. Date and time and location of contract clauses, design documents, etc.Announcement of bid opening date and bid resultsThursday, August 8, 2024, 9:00 AM, Main Conference Room, 2nd floor, Minowa Town HallInspection and acquisition of design documents, etc.Minowa Town Hall, Waterworks Division, Waterworks SectionAcceptance of questionsAcceptance periodWednesday, July 24, 2024Submit in person or by fax or email using the questionnaire form (receipt must be confirmed by phone, etc.)Minowa Town Hall, Waterworks Division, Waterworks Section - Wednesday, July 31, 2024Acceptance locationAnswers to questions will be posted on the Minowa Town official website from Monday, July 29, 2024 (updated regularly)The viewing and acquisition of design documents, etc. and the acceptance of questions will be from 8:30 AM to 5:15 PM (excluding noon to 1 PM), excluding holidays. Calculation method: ①97% of direct construction costs ②90% of common temporary facilities costs ③90% of site management costs ④68% of general management costs *Total of ① to ④ above *Fractions are rounded down (rounded down to the nearest 1 yen) at each stage of ① to ④, and amounts less than 10,000 yen are rounded down for the total of ① to ④. *If the amount calculated using the above formula exceeds 92% of the estimated price, 92% will be used, and if it is less than 75%, 75% will be used. (If there is a fraction less than 10,000 yen, round down to the nearest 10,000 yen.) 5. Matters related to bid security As shown in 7 of the Notes on bidding conditions for competitive bidding (post-review). 6. Invalidation of bids, etc. As shown in 11 of the Notes on bidding conditions for competitive bidding (post-review). 7. Other matters necessary for general bidding Payment conditions Based on the provisions of Article 75-2 of the Minowa Town Financial Regulations, advance payment is applicable within 40% of the contract amount. Partial payments are applicable in accordance with Article 135 of the Minowa Town Financial Regulations. Interim advance payments are not applicable. Determination of successful bidder: After the bids are opened, the lowest bidder will be screened for necessary qualifications, and if it is confirmed that the bidder meets the qualifications, the bidder will be selected as the successful bidder. Therefore, those who are instructed to do so should submit the following documents to the bidding officer within two days (excluding holidays) from the date of the instructions. (1) Form "Submission of documents for bidder qualification screening" (2) Copy of construction business license certificate (3) Copy of business review results notice (the latest one with a review reference date within one year and seven months from the date of bid opening) Other/Other As specified in the "Notes on bidding conditions for competitive bidding (post-review) for contract requests." Contact information for this tender announcement: Ordering section Fax: 0265-79-0230 E-mail: suido@town.minowa.lg.jp Minowa Town Office, Waterworks Division, Waterworks Section Bidding section Address: 10298 Nakaminowa, Minowa-machi, Kamiina-gun, Nagano Prefecture, 399-4695 Phone: 0265-79-3152, extension 1153 Fax: 0265-79-0230 E-mail: kizai@town.minowa.lg.jp Minowa Town Official Website: http://www.town.minowa.lg.jpjp/Minowa Town Hall, Planning and Promotion Division, Urban Planning Policy SectionRegarding the letter of consent to cooperate in snow removal workFor this bid, only those who have submitted a letter of consent to cooperate in snow removal work will be considered valid, and all other bids will be invalid based on 11(2) Te of the Notes on Bidding Conditions for Receiving Orders (Post-Review).When submitting a bid, please fill in the attached letter of consent, stamp it, and enclose it in an outer envelope like the breakdown.However, if you have submitted a letter of consent for the bid in fiscal year 2024, this is not necessary. [Measures to be taken if there are no successful bidders]As shown in 10(3) of the Notes on Bidding Conditions for Receiving Orders (Post-Review). (4) A copy of the document certifying the qualifications of the engineer to be assigned. (5) A copy of the document certifying the permanent employment relationship of the engineer to be assigned. ◆Painting paper for the outer envelope and the inner envelope (cut along the cut line and paste it on the outer envelope and the inner envelope) [For outer envelope] キリ トリ Submission deadline August 6th 〒399-4695 Nagano Prefecture Kamiina District Minowa-cho 10298 Nakaminowa Bidding form in stock (Bid opening date August 8th, 2024) Minowa Town Hall Planning and Promotion Division, Town Development Policy Section Work (task) name 2024 Town-only residential land development related special public sewer pipe installation work (1st section) Work (task) location name Minowa Town Yaotome Trade name or name Address キリ トリ [For inner envelope] キリトリBid opening date August 8, 2024Project (business) name 2024 Town-only residential land development related Special Environmental Public Sewer Pipe Buried Construction Project (1 section)Project (business) location Minowa Town YaotomeTrade name or name Address Name of person in charge Contact person (phone) ( ) Contact person (fax) ( )キリ トリ◆Bid receipt (If you are submitting the bid in person and need the received document, please fill in the necessary information, cut it out and bring it with you.)キリ トリBid opening date August 8, 2024Project (business) name 2024 Town-only residential land development related Special Environmental Public Sewer Pipe Buried Construction Project (1 section)Project (business) location Minowa Town YaotomeBidder's receipt stamp Minowa Town Hall Planning and Promotion Division Letter of consent for snow removal services requested by the Town Planning and Policy Section, Minowa Town When participating in bidding for construction works ordered by the town, we agree to cooperate with the snow removal services requested by the town. Trade name or name seal Representative Date: Year/Month/2020 Mayor of Minowa Town, Mr. Shiratori Masanori Address: - 1 - Construction conditions specification (special specifications) Minowa Town Office, Waterworks Division Project name: Town-only residential land development related special public sewer pipe installation work (section 1) in fiscal year 2024 Construction location: Yaotome, Minowa Town When carrying out the construction work, the specified documents shall be used as reference, and the following items shall be construction conditions. When carrying out this work, it shall be carried out in accordance with the common construction specifications, various construction management standards, completed form management standards, photo management standards, etc. established by the Nagano Prefecture Construction Department. Please note that if the final contract amount (including tax) of this work is 10 million yen or more, it will be subject to evaluation based on the Minowa Town Construction Work Performance Evaluation Guidelines. 1 Work Contents (1) Work Overview: As per the design document for viewing Type of work Length, location, etc. Design Contents Sewer pipe installation work Pipe L = 48.6m VUφ200 manhole work 1 cut-in, 1 No. 1 work 3 installation pipes and manhole works (2) Surveying, design commission, geological survey, etc. related to this work site can be viewed. In addition, they can be loaned after the contract is signed. 2 Construction period The construction period will be until November 29, 2024. 3 Work schedule, traffic restrictions, etc. (1) When carrying out this work, schedule adjustments must be made with local residents if it overlaps with the cultivation season. (2) In the case of full road closures or one-way road closures for road construction work, a notification must be submitted in advance to the fire chief using Form No. 13 "Road Construction, etc." in accordance with Article 45 of the Kamiina Regional Union Fire Prevention Ordinance. (3) The construction period, construction methods, etc. of this work are subject to the following restrictions, so appropriate measures must be taken. In addition, the contents of the contact and adjustments must be reported to the supervisor. Constraints Location, etc. Constraints, details, etc. Waterworks pipe installation work Same construction section Town-ordered waterworks construction work is scheduled in the same construction area, so schedule adjustments and supervision are required. (Simultaneous burial) (3) This work is to be discussed with the relevant organizations and local residents as follows. In addition, when implementing traffic restrictions, sufficient consultations must be held with the relevant organizations and road administrators. Related organizations, etc. Details Constraints Time Yaotome Ward Consultation Schedule, method of use of roads in the ward, etc. Before construction begins Neighborhood residents Notification, etc. Same Same 4. Registration of construction performance information (1) For construction works with a contract value of 5 million yen or more, construction performance information (construction chart) must be registered. (2) If registration is required, confirmation must be obtained in advance from the supervisor, and registration procedures must be completed with the Japan Construction Information Center (JACIC) within the period specified below, and documents certifying registration must be submitted to the supervisor. In addition, if there are less than 10 days between the time of change and the time of completion, submission at the time of change may be omitted. - 2 -① When receiving the order for construction work: Within 10 days after the conclusion of the contract② When the registered contents are changed: Within 10 days after the conclusion of the contract for change③ When the construction work is completed: Within 10 days after the completion of the construction5 Construction Plan (1) The construction plan must be prepared and submitted within 15 days after the start of construction work, taking into consideration the design documents, the "Nagano Prefecture Civil Engineering Works Common Specifications", this special specification, and the site conditions. (2) After the contract for change and when changes occur, a "changed construction plan" must be prepared and submitted. 6 Construction System Register (1) The contractor must prepare a "construction system register" and related documents and a "construction system diagram" as stipulated in the Construction Business Law for all construction work, regardless of the subcontract amount, and keep them at the construction site during the construction period. (2) The "construction system diagram" must be posted in a place where it is easily visible to those involved in the construction work and the public. (3) The contractor must treat the following industries with which the contractor contracts as equivalent to construction industry contract work and enter them in the "construction system register" and "construction system diagram". ① Traffic control officers, security guards ② Special industrial waste disposal companies, industrial waste disposal companies ③ Dump truck drivers ④ Contracts to be completed in one day, contracts for small tasks, miscellaneous work, and labor only ⑤ Crane work, concrete pump pouring, etc., performed on a daily unit price contract ⑥ When renting a crane operator from a leasing company along with the machine ⑦ When renting a supporter from another company and concluding a contract (excluding cases of temporary employment) * Items to be recorded in the construction system register ・ Items listed in Article 24-7, paragraph 1 of the Construction Business Law and Article 14-2 of the Enforcement Regulations ・ Safety and health manager, safety and health promoter, employment management manager, supervising engineer, chief engineer, etc. ・ Social insurance enrollment status (4) Submit a copy of the "Construction System Register" and "Construction System Diagram" with the "Subcontractor List" attached. 7 Land-related matters (1) Regarding the restoration of leased land, etc., the original state should be restored as a general rule, and the return should be completed within the lease period in the presence of the owner, manager, etc. (2) For areas to be restored, such as leased land, the condition before work begins must be recorded with photographs and survey results, and appropriate management must be implemented, such as by setting up reference points, when moving boundary posts or structures. If necessary, owners must be present and their consent must be obtained before work can begin. (3) The contractor must handle the leasing of land that is required and the various procedures associated with it. In particular, with regard to "temporary conversion of farmland," coordination must be made in advance with the agricultural policy division of the local office, municipalities, agricultural committees, etc. (4) If boundary studs, boundary posts, etc. have been installed within the construction area, they will be restored during this work. July 1996.9 In accordance with the Ina Construction Office's "Handling of Width Pile in Construction Works," records the distance from two or more fixed points (corners of concrete retaining walls, etc.) or retaining piles before construction. Note that the presence of the neighboring landowner may be required. 8. Preservation of the Surrounding Environment (1) In principle, construction machinery should be low-noise, low-vibration, and emission-control machinery. See Appendix 1 "Emission-control machinery." (2) Make efforts to prevent the outflow of sewage, pollution, and soil, and in particular, when transporting various materials such as surplus soil generated at the site, ensure that soil is removed from the transport vehicle before entering the general road. In addition, if the general road is damaged or polluted due to the construction work, the contractor is responsible for dealing with it. (3) Consider thoroughly in advance measures to prevent pollution, such as noise and vibration, especially in areas close to residential areas, and the outflow of wastewater into rice paddies and fields, and deal with any problems that arise promptly. Select a transport route that will have the least impact. - 3 -(4) If there are any special initiatives at the site, attach "Attachment Form 1" to the completion documents and report them actively. 9. Prohibition of Overloading (1) When planning the construction of a work, the following items must be specifically described in the construction plan and must be observed during construction. ① Strict checks must be carried out on the disposal of construction soil, construction by-products, and waste materials that exceed the loading weight limit, and on the loading weight of materials and equipment (hereinafter referred to as "materials and equipment, etc."). ② Materials and equipment must not be purchased from material suppliers that are overloading. ③ In order to prevent overloading, when purchasing materials and equipment, etc., be careful not to unfairly impair the interests of suppliers. ④ Vehicles with frame attachments, vehicles with illegally modified items such as cargo loading devices, and vehicles with no markings must not be used to transport materials and equipment, etc. In addition, do not accept delivery of materials and equipment, etc. from such vehicles. ⑤ When selecting subcontractors and suppliers of materials and equipment, etc., eliminate those who lack consideration for traffic safety or those who have caused serious and malicious accidents in work using vehicles. ⑥ For items that may scatter, take measures to prevent them from scattering before transporting them. ⑦ When selecting businesses that transport soil and sand, etc., in consideration of the purpose of the "Special Measures Law for the Prevention of Traffic Accidents Caused by Large Vehicles Transporting Soil and Sand, etc.," strive to employ members of organizations that have notified the government under the provisions of Article 12 of the said Law. (2) The above points should be followed thoroughly for subcontractors as well. 10 Safety Measures (1) At construction sites, efforts should be made to prevent industrial accidents and public accidents based on Common Specifications 1-1-40, and safety education, training and drills should be provided to all workers on a regular basis. (2) Safety education, training and drills should be provided at least once a month (half a day) during the construction period, and the results should be recorded in the construction logbook, and construction photos, etc. should be organized and presented at the time of completion inspection (returned after confirmation). (3) In principle, traffic safety facilities shall be implemented as follows: - Around temporary yards, panel fences, etc. shall be secured with single pipes, etc., and public safety measures shall be taken. - Where adjacent to roadways where there is a risk of vehicles or other objects running into the premises, guardrails, visual guides, rotating lights, etc. shall be installed, and consideration shall be given to safety measures, especially at night. (4) When setting up scaffolding, it shall be scaffolding with handrails, center posts, and baseboards that comply with the "Standards for Scaffolding That is Easy to Work in and Provides a Sense of Security" in the "Guidelines for the Handrail-First Construction Method" (Ministry of Health, Labour and Welfare, Basic Notification No. 0424001, April 24, 2020), and the assembly, dismantling, or modification of scaffolding shall be carried out in accordance with Item 2 (2) of the "Standards for Scaffolding Assembly, etc. Using the Handrail-First Construction Method" or (3) of the "Dedicated Handrail-First Scaffolding Method." (5) Construction near power transmission and distribution lines must adhere to the Industrial Safety and Health Law, Industrial Safety and Health Regulations, and the Notice of the Director of the Labor Standards Bureau (No. 759, December 17, 1975), which requires that the following safety distances be ensured. Note that consultations with electric power companies on preventing electrical accidents are free of charge, so please discuss in advance the obligation to take measures to prevent danger to overhead power lines. Type Transmission voltage Number of insulators Safety distance Distribution line 100-200 volts 1 smaller insulator than the transmission line 2m 6,600 volt transmission line 20,000-30,000 volts 3-4 units 3m 77,000 volts 5-9 units 4m 154,000 volts 7-21 units 5m 275,000 volts 16-25 units 7m 500,000 volts 20-41 units 11m ・Contact for transmission lines Chubu Electric Power Co., Inc., Iida Power Center, Power Transmission Division (0265-53-6919) Kansai Electric Power Transmission & Distribution Co., Ltd., Kiso Power Transmission Center (0264-52-5681) - 4 - ・Contact for distribution lines Chubu Electric Power Power Grid Co., Ltd., Ina Office (0120-984-822) (6) For this work, the Contractor must obtain non-statutory workers' accident compensation insurance. Based on Article 50 of the Construction Contract (Fire Insurance, etc.), when the Contractor concludes an insurance contract, the Town is required to confirm the insurance policy, etc., so the Contractor must present it. 11 Temporary Works (1) When Public Roads are Used When public roads and private roads are used as construction roads, traffic control and safety management must be adequately implemented to prevent accidents and complaints. In addition, if roads and auxiliary facilities are damaged, the Contractor must promptly restore them to their original state under its responsibility. (2) In principle, there will be no design changes to temporary materials rental fees or rental periods due to construction period extensions, etc., caused by the Contractor. (3) Designated Temporary Works Temporary Works Name Design Conditions Special Notes Turbid Water Treatment Plant m3/h Dewatering Equipment l/mi (4) In principle, temporary works will be removed, but temporary retaining works, temporary bridges, scaffolding, etc., as specified in the design documents, will not be removed. In addition, if it is recognized that there will be an impact on surrounding structures due to site conditions, the removal method will be discussed. Temporary Structures Contents Period Conditions, etc. 12 Construction By-Products If the contract amount for this work is 5 million yen or more, please note that it will be carried out in accordance with the "Guidelines for the Implementation of Public Construction Works for Separate Dismantling, Recycling, and Recycled Resource Utilization (Civil Engineering)" established by Nagano Prefecture. Please note that advance explanation (notification) is required before the contract is signed in accordance with Article 12, Paragraph 1 of the Law, so please take special consideration. (1) Construction By-Products Processing Construction by-product processing costs are selected from the most economical processing facilities based on the total of processing costs and transportation costs for each facility. The contractor should also strive to reduce the costs required for recycling construction by-products in accordance with the purpose of Article 5 of the Construction Recycling Law. Construction material waste should be separated by type in accordance with Article 9 of the Construction Recycling Law. The disposal of construction waste soil and industrial waste generated in this work has been recorded with disposal and transportation costs assuming the following conditions. In principle, the design will not be changed if the contractor changes the disposal destination due to his/her convenience. (2) Construction waste receiving site/temporary storage site Disposal method Transport distance Special notes Optional Designated2km If construction waste soil is to be treated in an amount of 500m3 or more, the site will be designated. However, if the amount is less than 500m3, in principle, the contractor is free to choose the site. Please note that if the disposal site is to be changed, the contractor must consult with the client. (3) Specific construction materials (Construction Recycling Law) If the contract amount for this work is 5 million yen or more, the contractor must receive a copy of the notice from the client. If there is a subcontractor, the contractor must notify the subcontractor by attaching a copy of the notice. When recycling is completed, the contractor must report to the client at the time of completion in the Recycling Report. Type Disposal conditions Disposal destination/transport distance Remarks - 5 - Asphalt chunks Recycled Nanju Recycling Plant 8.8Km The quantity is as specified in the design documents Cement concrete chunks Unreinforced cobalt recycled Reinforced cobalt recycled Secondary products Recycled construction materials Wood * If the object to be discharged differs from the design dimensions, the contractor must consult with the client. Documents that can confirm dimensions, etc. must be submitted. (4) Industrial waste (Construction waste disposal guidelines) Type Disposal conditions Disposal destination/transport distance Remarks Wood waste (roots removed/cut lumber) Recycled Sludge Recycled Others (metal scraps, etc.) Recycled * The conversion coefficient listed in the detailed design unit price table is used for the volume-to-weight conversion of wood waste disposal volume used in the calculation. If confirmation is based on volume (m3), photographs must be kept for each vehicle so that the volume can be confirmed. (5) Transport and disposal of construction by-products A. When entrusting the transport of construction by-products to a waste disposal company, be sure to enter into a written consignment contract. B. Check the "license" for the business of transporting, processing, and disposing of waste, and attach a "copy" of it to the construction documents. C. Even if a subcontractor transports, processes, and disposes of construction by-products, a consignment contract must be concluded separately from the subcontract agreement. D) The "Manifest (Industrial Waste Management Table)" must be used to confirm that waste is being transported, treated and disposed of appropriately, and the Contractor must keep the manifest (Tables A, B2, D and E) and there is no need to attach them to the completion documents. Only the quantity summary table for each type of waste must be attached to the completion documents. However, at the time of the completion inspection, originals of all tables must be brought in for inspection by an inspector etc. (Please note that supervisors etc. may check the originals at other stage inspections etc.) Photographs showing the relationship between the recycling facility and the final disposal site must be attached to the completion documents. E) The items that the Contractor must include or prepare in the construction plan are as follows: ※Select the appropriate disposal method※ 1 Recycling 2 Shredding 3 Incineration 4 Landfill 5 Others Disposal destination (business) Business name Address License number Transportation contractor (if outsourced) Business name Address License number Others Recycling method, etc. Attached documents A Copy of the disposal destination's license and copy of the collection and transportation business' license (if collection and transportation is outsourced) B Copy of the contract between the contractor and the disposal or transportation business C Location of the disposal business and planned transportation route - 6 - D Copy of the notice if there is a subcontractor E "Appendix 4-1" Explanation and "Appendix 4-2" Plan for separation and demolition, etc. in "Public construction work implementation guidelines for separation and demolition, recycling, etc. and recycled resource utilization construction (civil engineering)" (6) Submission of "Recyclable resource utilization plan and implementation document" and "Recyclable resource utilization promotion plan and implementation document" A Submit ① "Recyclable Resource Utilization Plan" and ② "Recyclable Resource Utilization Promotion Plan" along with the construction plan. ① Target: Delivery of 1000m3 or more of soil, 500t or more of crushed stone, and 200t or more of As composite material. ② Target: Delivery of 1000m3 or more of soil, and 200t or more of Co shells, As shells, and wood chips. a. Prepare and submit "Recyclable Resource Utilization Implementation Document" and "Recyclable Resource Utilization Promotion Implementation Document" at the time of completion. The targets are the same as above. c. In principle, the submission form should be prepared using COBRIS (Construction By-Product Information Exchange System, commonly known as COBRIS). If this is difficult, it is possible to use the "Construction Recycling Report Form (EXCEL)" in consultation with the supervisor. d. If COBRIS is used, data submission is not required. e. The targets are based on "Implementation Guidelines for Separate Demolition, Recycling, and Recyclable Resource Utilization in Public Construction Works (Civil Engineering)". (7) Confirmation of disposal volume When supervisors, inspectors, etc. request the presentation of invoices, vouchers, etc. to confirm the disposal volume of construction by-products, they must comply. For soil disposal, in addition to photos of the work status, documents showing the disposal volume must be attached (if there is one location, a photo showing the width and length; if there are several locations, a list must be created and a voucher from the transporter). 13 Quality and technical management (1) Preservation of quality records of construction materials Quality records must be created for construction materials for civil engineering structures and submitted at the completion of construction work. (Worksite Essential P.66) (2) Creation and registration of construction charts For construction works with a contract price of 5 million yen or more, the contractor shall create a "construction chart" based on the Construction Results Information Service (CORINS) input system (Japan Construction Information Center) as construction results information at the time of acceptance, change, completion, and correction, and have it confirmed by the supervisor. After that, when accepting an order, the contractor shall apply for registration within 10 days after the contract, when changing the registered contents, within 10 days from the date of the change, when completing the work, within 10 days from the completion of the work, and when correcting, within the appropriate registration period (however, for construction works with a contract price of 5 million yen or more and less than 25 million yen, registration shall only be made at the time of acceptance or correction). In addition, the contractor shall submit a copy of the "construction chart receipt" issued after registration to the supervisor. The submission deadlines are as follows. - The deadline for submission of registration at the time of acceptance is within 10 days after the contract is concluded. - The deadline for submission of registration at the time of completion is up to the date of completion inspection. - If there are any changes to the contents of the data registered at the time of acceptance during construction, the data shall be submitted within 10 days from the date of the change. In addition, when making corrections (deletions) to data registered at the time of completion, a confirmation document from the ordering agency with the client's confirmation seal is required. (3) As a rule, tests such as concrete compressive strength tests and rebar tests for construction materials should be performed at the Construction Technology Center Laboratory. In addition, compression test specimens should bear a QC plate signed by the contractor's chief engineer or concrete engineer. (4) Regarding the handling of concrete quality control A. Assignment of concrete engineers - Contractors shall assign concrete engineers for concrete works of 50 m3 or more. - The engineers cannot serve as site representatives, but they can serve as chief engineers and supervising engineers, and this shall be clearly stated in the construction plan. B. Quality control by the contractor from the demarcation point of responsibility The contractor is responsible for all quality control beyond the "demarcation point of responsibility," and if quality control tests are entrusted to ready-mix concrete companies, they shall be present at all of them and submit records and photographs of them as the completion deliverables. In addition, the concrete engineer must be included in the photograph as proof of attendance. - 7 - Handling of ready-mixed concrete delivery note (voucher) - The ready-mixed concrete delivery note shall be submitted as a completion product. - The delivery note shall include the time of departure from the factory, the time of arrival at the site, and the time of completion of pouring. (5) The technical management fee includes the cost of microfilm production (2 rolls) and the cost of reduced-size bookbinding (3 copies) for tunnels, bridges, erosion control structures, and other designated structures, so these shall be implemented. (6) Approval of materials and equipment to be used in the work Materials and equipment to be used in this work must be approved by submitting a "Material Approval Request". However, for materials that have already been approved as a whole as notified in 2-Ken No. 73 dated May 25, 2020, it is not necessary to submit a "Material Approval Request". Structural calculations and stability calculations for secondary products, etc. designated by the supervisor must be submitted at the same time as the "Material Approval Request". 14 Preferential use of materials produced within the prefecture (1) The contractor shall endeavor to give priority to the use of materials produced within the prefecture that meet the standards, quality, and other requirements for the materials used in this work. (2) The contractor shall purchase construction materials from dealers within the prefecture whenever possible. (3) If the contractor uses materials produced outside the prefecture in this work, the contractor shall submit a "Report on the Use of Materials Produced Outside the Prefecture" that includes the name of the materials and the reason for not using materials produced within the prefecture for the following materials: - Ground work (gravel) - Concrete work (ready mixed concrete) - Pavement work (roadbed materials) (4) When entering into a subcontract, the contractor shall use local contractors whenever possible. 15 Regarding improved soil using cement and cement-based solidification materials (1) In the case of ground improvement using cement and cement-based solidification materials and reusing improved soil, a hexavalent chromium leaching test shall be conducted and the results shall be reported. (2) Cement and cement-based solidification materials are solidification materials that contain cement, including ordinary Portland cement, blast-furnace cement, cement-based solidification materials, and lime-based solidification materials, including those with additives. (3) Hexavalent chromium leaching tests shall be conducted in accordance with the "Procedures (draft) for testing hexavalent chromium leaching from improved soil using cement and cement-based solidification materials" (hereinafter referred to as the "Procedures (draft)") to confirm that the soil environmental standards are not exceeded. Procedures (draft) http://www.mlit.go.jp/tec/kankyou/kuromu.html16 Inspections and tests conducted by the supervisor The main inspections and tests conducted by the supervisor are as follows. When applicable, be sure to request the supervisor to be present. In addition, random inspections by town officials or those designated by the mayor may be conducted during construction, so please cooperate with the inspections. Item Content RemarksAfter the start of construction survey: Check the installation status of the slab.When the floor excavation is completed: Check the floor excavation width, reference height, soil quality, spring water status, obstructions, etc.When the foundation work is carried out: Check the foundation work position, height, shape, dimensions, etc.When the formwork assembly is completed: Check the formwork position, height, shape, dimensions, etc.When the rebar assembly is completed: Compare with the design dimensions, check the rebar diameter and spacing, etc.Major construction stage milestones: As appropriate during the construction periodWhen the pipe laying work is completed: Check the joint status, pipe insertion, water flow status, etc.Applicable to pipe construction: Finished form: Actual measurement and confirmation of finished form quantityOther: Stages that the supervisor deems necessary*Any areas that cannot be seen clearly after the construction is completed (invisible areas) must be inspected by the supervisor. Stage inspections can also be done on a desk. In this case, the contractor must be present and present the inspection record sheet, construction management documents, and photos of the inspected areas. - 8 -17 Others (1) Compliance with the Guidelines for Rationalizing Production Systems in the Construction Industry In order to ensure proper and smooth construction of works, general and specialized contractors must accurately fulfill the responsibilities according to their roles as clarified in the Guidelines for Rationalizing Production Systems in the Construction Industry, and must endeavor to conclude proper contracts, establish proper construction systems, and improve the employment conditions of construction workers, etc. (2) Ensuring proper construction of construction works 1) Not to conclude blanket subcontracting or other inappropriate forms of subcontracting contracts that violate the Construction Business Act (Act No. 100 of 1949) and the Act on Promotion of Fair Bidding and Contracting for Public Works (Act No. 127 of 2000). 2. Pursuant to the provisions of Article 26 of the Construction Business Law, the contractor must appoint a full-time chief engineer or full-time supervising engineer for each construction site, and the contractor must assign a person with the appropriate qualifications and technical capabilities (limited to those who are stationed at the construction site full-time and engaged exclusively in the duties of that position, and who have a direct and permanent employment relationship with the contractor). 3. Of the full-time supervising engineers that the contractor must appoint for each construction site, in the case where the construction business related to the construction work in question is a designated construction business, the supervising engineer must be a person who falls under Article 15, item 2 (a) of the Construction Business Law, or a person who is recognized by the Minister of Construction as having equal or greater capabilities than the person listed in item 2 (a) pursuant to the provisions of item 2 (c) of the same law, and who has been issued a supervising engineer certificate. In this case, a copy of the supervising engineer must be submitted at the time of the contract. Also, the qualification certificate must be presented upon request from the client. 4. In addition to items 1, 2, and 3, the contractor must not engage in any acts that violate the Construction Business Law, etc. (3) Improving labor welfare, etc., by securing construction workers and striving to improve labor welfare, such as preventing industrial accidents, ensuring fair wages, and joining retirement benefit systems and various insurance systems. (4) Regarding the construction industry retirement benefit system: 1 Construction contractors must purchase insurance stamps for workers covered by the Kentaikyo system whom they employ and affix the insurance stamps to the insurance booklets of such workers. 2 When construction contractors conclude a subcontracting agreement, they must explain the purpose of the Kentaikyo system to the subcontractor and purchase insurance stamps for workers covered by the Kentaikyo system employed by the subcontractor and issue them in kind, or include the amount equivalent to the Kentaikyo system premiums in the subcontract price, thereby encouraging subcontractors to join the Kentaikyo system and purchase and affix insurance stamps. 3. When a construction contract is concluded for a construction work with a contract price of 8 million yen or more, the construction contractor shall submit a Kentaikyo System Client's Contribution Collection Slip (hereinafter referred to as the "Collection Slip") to the client within one month after the conclusion of the construction work. If there are circumstances that prevent the submission of the collection slip for the construction work within the deadline, such as because the factory production stage is still in progress at the beginning of the construction contract and workers covered by the Kentaikyo System are not employed, or if workers covered by the Kentaikyo System are not used, the construction contractor shall submit in writing in advance the reason and the planned date for purchasing the insurance stamps. 4. When a construction contractor makes a request as described in 3, or when the contract price is increased, etc., and purchases additional insurance stamps, the construction contractor shall submit a collection slip for the insurance stamps by the time the construction work is completed. If a construction contractor makes a request as described in 3 or when the contract price is increased, and does not purchase additional insurance stamps, the construction contractor shall submit in writing the reason. 5. If it is deemed necessary to understand the status of insurance stamp purchases, the construction contractor may request the submission of insurance stamp receipts and payments ledger and other related materials. 6. Construction contractors who are not members of the Kentaikyo system or who have insufficient purchases or affixes of insurance stamps may be taken into consideration in bidding, etc. 7. If a subcontractor is small and does not have sufficient capacity to handle the paperwork related to the Kentaikyo system, there is a method of entrusting the general contractor with the procedures for joining the Kentaikyo system and affixing insurance stamps to the insurance booklet, etc., so the general contractor should endeavor to entrust the subcontractor's work as much as possible. (5) Always be conscious of cost reduction and strive to reflect it in the design. (6) Consider structural improvement measures such as improving welfare and working hours at construction sites, or implementing projects that contribute to increasing understanding of the construction industry, such as opening construction sites to local residents and promoting them. (7) If you are the victim of construction work obstruction or other damage from members of organized crime groups, etc., immediately file a complaint with the police. - 9 -(8) Since the cost of major materials, including ready-mix concrete, is calculated based on the price of factories in the jurisdiction, consultations should be made when transporting these materials from outside the jurisdiction. (9) When implementing traffic restrictions, sufficient consultation must be made with the relevant authorities and road management personnel. (10) On-site agents, chief engineers, etc. must promptly and appropriately perform the duties outlined in the various terms and conditions. 18 Submission of implementation status regarding originality and social contribution The Contractor may submit, in the prescribed format, by the time the work is completed, items related to originality and social contribution that he or she has planned and implemented himself or herself in the construction of the work, or items related to items that can be evaluated as contributions to the local community. If there is specific content regarding originality and social contribution, etc., the following "Attachment Form 2" and "Explanatory Materials" must be submitted. The paper size should be A4. - 10 - Attachment 1 "Machinery with Controlled Emissions" Regarding the general use of construction machinery with controlled emission emissions If the construction machinery listed below is to be used in this work, it is necessary to comply with the "Guidelines for Designating Construction Machinery with Controlled Emissions (dated October 8, 1991)"Construction machinery with exhaust gas control designated in accordance with the Ministry of Construction and Economic Affairs Notification No. 249 shall be used. If exhaust gas control construction machinery cannot be used, it shall be deemed equivalent to exhaust gas control construction machinery by installing an exhaust gas purification device evaluated in the FY2025 Construction Technology Evaluation System publicly solicited subject "Development of exhaust gas purification device for construction machinery," or in the technical review and certification business for privately developed construction technology with an equivalent development goal, or in the construction technology review and certification business with an equivalent development goal. However, if this is difficult, the supervisor shall be consulted. When using exhaust gas control construction machinery or construction machinery equipped with exhaust gas purification device, the site representative shall take a photograph of the construction machinery to be used at the construction site and submit it to the supervisor. Models that use exhaust gas control construction machinery as a general rule Model Remarks General construction machinery Backhoe Tractor shovel (wheel type) Bulldozer Motor generator (portable) Air compressor (portable) Hydraulic unit (Among the foundation construction machinery shown below, those equipped with an independent diesel engine-driven hydraulic unit separate from the base machine; hydraulic hammer, vibro hammer, hydraulic steel pipe pressing/pulling machine, hydraulic pile pressing/pulling machine, earth auger, all-casing excavator, river circulation drill, earth drill, underground diaphragm wall construction machine, front-rotating all-casing excavator) Road roller, tire roller, vibrating roller Wheel crane Limited to construction machinery equipped with diesel engine (engine output 7.5kw or more, 260kw or less). - 11 - Attached Form 1 Implementation status regarding environmental considerations Name of construction Work location Name of contractor [Implementation details] [Drawings, photos, etc.] Explanatory materials should be prepared concisely and, if necessary, on separate sheets. - 12 - [Attached Form 2] Status of implementation of originality and sociality Name of project Reiwa XX year XXXXX project Contractor name XX Construction Co., Ltd. Item Evaluation content Remarks □ Originality and ingenuity □ Preparation and cleanup □ Surveying and positioning □ Construction-related □ Application of alternative materials □ Construction-related matters such as earthwork, paving, concrete pouring, etc. □ Processing and assembly of facility work, wiring and piping for electrical work □ Anti-freezing measures, connections, etc. for water supply and drainage and sanitary facility work □ Provisional plans and construction □ Transport vehicles, construction machinery, etc. □ Quality-related □ Use of calculation software, etc. □ Earthwork, facility, electrical work □ Concrete pouring-related □ Materials used □ Piping, welding work, etc. □ Safety and health-related □ Temporary safety equipment, etc. □ Safety education, seminars, patrols, etc. □ Site office, etc. □ Prevention of traffic accidents, traffic security, etc. □ Construction signs, etc. □ Environmental considerations □ Active efforts to reduce environmental impact □ Reducing waste, encouraging idling stops, etc. □ Active use of recycled resources and materials □ Construction management □ Construction plans and photo management, etc. □ Use of CAD, construction management software, etc. □ Other □ Other □ Sociality, etc. □ Contribution to the community, etc. □ Implementation of environmental conservation of rivers, etc. (local community and residents □ Contribution to environmental conservation of the area around the work site and protection of flora and fauna) □ Harmony with the surrounding area of ​​the work site □ Communication with local residents □ Volunteer activities, etc. □ Assistance and relief activities for the community in times of disasters, etc. □ Other ○ Notes on preparation 1. Put a check mark in the □ of the applicable item. 2. If there is content that can be evaluated other than the applicable item, an item should be added as "Other". 3. Organize photographs, rough sketches, etc. in the explanatory materials to explain the specific content. - 13 - Implementation status of originality, sociality, etc. Explanatory materials Project name Reiwa XX year XX project / item Evaluation content Proposal content (explanation) (attached diagram) ○ Notes on preparation 1. The explanatory materials should be prepared concisely and, if necessary, on a separate sheet.
NAICS
-
CPVS
-
UNSPSC
-
Regions
APEC Countries Asia Eastern Asia
Sectors
Civil Works Building Environment and Pollution-Recycling Automobiles and Auto Parts Non-Renewable Energy Supply Security Services Bridges and Tunnels Engineering Banking-Finance-Insurance Postal and Courier Services Roads and Highways-Bridge Oil and Gas Telecommunications Water and Sanitation Law and Legal Transportation Environmental Work Services Roadways Cement and Asbestos Products Railways-Rail-Railroad Metals and Non-Metals Education and Training Machinery and Equipments-M&E Defence and Security Electricity Infrastructure and Tunnels Construction Fire Safety and Security Agriculture-Food and Beverages Energy-Power and Electrical Computer Hardwares and Consumables Steel Electronics Building Material Construction Materials
URL
Share
To be notified
when a tender matching your filter is published
To Follow
Tenders
Add New Tender Alert
To Follow
Contracts
Add New Contract Alert
To Follow
Fairs
Add New Fair Alert
Similar Tenders