Tender Details
Title

PROCUREMENT OF ON-GRID SOLAR POWER INSTALLATION AT DR. JOSEFINA V. ESTOLAS BUILDING , RTU, MANDALUYONG CAMPUS RIZAL TECHNOLOGICAL UNIVERSITY

Country
Language
English
Organization
Published Date
25.10.2024
Deadline Date
20.11.2024
Overview
PROCUREMENT OF ON-GRID SOLAR POWER INSTALLATION AT DR. JOSEFINA V. ESTOLAS BUILDING , RTU, MANDALUYONG CAMPUS Invitation to Bid (ITB)   Reference Number 11396502   Procuring Entity RIZAL TECHNOLOGICAL UNIVERSITY   Title PROCUREMENT OF ON-GRID SOLAR POWER INSTALLATION AT DR. JOSEFINA V. ESTOLAS BUILDING , RTU, MANDALUYONG CAMPUS   Area of Delivery Metro Manila   Printable Version Solicitation Number: ITB INFRA 2024-10-003 Trade Agreement: Implementing Rules and Regulations Procurement Mode: Public Bidding Classification: Civil Works Category: Electrical Systems and Lighting Components Approved Budget for the Contract: PHP 24,997,963.72 Contract Duration: 240 Day/s Client Agency: Contact Person: Elizalde L. Adana BAC Secretariat Staff 704 Brgy. Malamig, Boni Avenue Mandaluyong City Metro Manila Philippines 1550 63-2-85348267 Ext.1317 aelizalde@rtu.edu.ph Status Active Associated Components Order Bid Supplements 0 Document Request List 0 Date Published 25/10/2024 Last Updated / Time 25/10/2024 12:00 AM Closing Date / Time 20/11/2024 2:00 PM Description NOTE: Prospective bidders should have experience in undertaking a similar project with an amount of at least 50% of the proposed project for bidding and have key personnel and equipment (owned, leased or under purchase) available for the prosecution of the project. The eligibility check/ screening as well as the preliminary examination of bids shall use PASS/ FAIL criteria. All particulars relative to eligibility check and screening, bid security, performance security, pre-bidding conference/s, evaluation of bids, post-qualification and award of contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR) Interested bidders may submit their Letter of Intent (LOI) from October 25, 2024 to November 20, 2024 before 2:00 PM at the BAC Office thru this email: rtu_bac@rtu.edu.ph. Furthermore, the LOI should state the name of the company and the name of its authorized representative who will join the pre-bidding conference on November 7, 2024 at 2:00 PM. The last day of submission as well as the opening of bids will be on November 20, 2024 at 2:00 PM. All bids must be submitted before the prescribed time. All queries regarding the project should be addressed to the BAC in the abovementioned email address. Bid Documents will be available online but only those who paid the non-refundable amount of Php 25,000.00 bid documents fee at the RTU Cashier can join the bidding. The RTU reserves the right to accept or reject any bid, to declare the bidding a failure, not to award the contract, to annul the bidding process and to reject all bids prior to contract award without thereby incurring any liability to the affected bidders. Furthermore, RTU reserves the right to waive any minor defects of formality and to accept the proposal most advantageous to RTU. SCOPE OF WORKS: 1. Detailed engineering design and structural safety assessment including on-site physical assessment of the following: • Design and Build Contractor shall perform Distribution Impact Study (DIS) in accordance with Meralco requirements • Civil structure of the building and rooftop • Sun path tracking/shading analysis • Energy modeling and simulation of the 2nos.-100kWp Solar PV system following the building audit and recommendations of the Solar Power expert • Assessment of the grid infrastructure and building connection with net metering system - Submit detailed engineering design for the 2nos.-100kWp solar PV based on the results of the assessment for review and approval by Project Management Office and the Design & Build Committee. 2. Procurement of solar power system components and other materials - Procurement of solar equipment for the capacity of 2nos.-100kWp not limited to the following: • Solar panels • Inverters • Transformer • Combiner Box • Balance of the System (BOS) (panel frame structure, nuts, and bolts, cables and wires) • Security measures (anti-theft bolts) • Iron frame • Wires, smart devices, and connections to the national electricity network. • Any other relevant components that are needed 3. Set-Up and Installation • Construction of frames and brackets. • Installation of the solar photovoltaic system, based on the final approved design. • Integrate a monitoring system. 4. Connection to the electrical grid and net metering setup - Grid Connection Application • The contractor of the solar power system shall submit a formal grid connection application to the local utility or grid operator. The application should include technical specifications of the system, system capacity, expected generation, and any other information required by the utility. • The solar power system installation must comply with all applicable regulations, codes, and standards governing grid connection and electrical safety. This includes compliance with national, regional, and local grid codes, as well as safety standards for electrical installations and equipment. - Net Metering Setup • After the solar power system is connected to the grid, the contractor shall submit a net metering application to the utility or grid operator. • The application should include details of the system installation, expect energy generation, and propose net metering configuration. 5. Testing and commissioning (including warranty period) - 24/7 monitoring and regular maintenance for the first 10 working days after completion - The contractor/supplier will assume full liability for a 10-year performance guarantee. - The supplier/contractor additionally accepts responsibility for the manufacturer warranties of the corresponding system components/parts, which must have a minimum warranty period of 10- years for solar inverter, 20-years for dry-type transformer and solar panels with minimum warranty period of 25 years. 6. Capacity building training for personnel in charge - Contractor/Supplier must conduct capacity building training for personnel in charge of maintenance of buildings and facilities on proper use and maintenance of the system to ensure optimum efficiency. - Contractor must handover operations manual for personnel in charge. 7. Construction of New Electrical Room - Contractor shall construct new electrical room and provide new 1600AT MCCB Stainless Steel cabinet enclosure as per the provided drawing. - Contractor shall terminate the cables from line side and load side of the new 1600AT MCCB cabinet enclosure. Contractor shall relocate and pull the cables of the load side. 8. Provision for New Electrical Post Service Entrance & Wire - Contractor shall also construct new electrical service entrance post as per the provided drawing - Contractor shall install cables (3-SETS OF 6WIRE-250sq.mm) from new 1600AT MCCB cabinet enclosure at new electrical room to the new electrical service entrance post top level for Meralco connection. - Contractor shall request for shutdown from Meralco for this activity. - Contractor shall perform megger testing of the cables. Pre-bid Conference Date Time Venue 07/11/2024 2:00 PM BAC Conference Room, 3/F Dr. Lydia M. Profeta Bldg., Rizal Technological University, Boni Avenue, Mandaluyong City Created by Elizalde L. Adana Date Created 23/10/2024 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party.       RIZAL TECHNOLOGICAL UNIVERSITY
NAICS
Power Nonferrous Metal (except Copper and Aluminum) Rolling Instruments and Related Products Manufacturing for Measuring Navigational Justice Bolt Specialized Freight (except Used Goods) Trucking Nonferrous Metal (except Copper and Aluminum) Rolling Regulation Other Foundation Other Foundation Regulation and Administration of Communications Financial Transactions Processing Securities Justice Copper Rolling Construction Architectural Turned Product and Screw Other Justice Copper Rolling Machinery Regulation Other Aluminum Rolling Colleges Regulation and Administration of Communications Colleges Measuring Agriculture Navigational Capacitor Colleges Financial Transactions Processing Foundation Research and Development in the Physical General Freight Trucking Management Other Justice Machine Shops; Turned Product; and Screw Agencies Research and Development in the Physical Construction Process Metal Can
CPVS
Parts of structures Inverters Earthmoving and excavating machinery, and associated parts Iron, lead, zinc, tin and copper System, storage and content management software package Other electrical installation work Networks Wire Bolts Networking, Internet and intranet software development services Electrical installation work Control, safety, signalling and light equipment Nuts Construction, foundation and surface works for highways, roads Iron Engineering, auxiliary, average, loss, actuarial and salvage insurance services Cable Frames Structural works Wells construction work PH meters Training, workout or aerobic services Office, school and office equipment cleaning services Meters Feasibility study, advisory service, analysis Safety cases Document creation, drawing, imaging, scheduling and productivity software package Balances Construction work Structures and parts Document creation, drawing, imaging, scheduling and productivity software development services Electricity, heating, solar and nuclear energy System, storage and content management software development services Cabinets Networking, Internet and intranet software package Parts of transformers, inductors and static converters Boxes Installation services of equipment for measuring, checking, testing and navigating Monitors Other services Panels Posts Cable, wire and related products Steel Seats, chairs and related products, and associated parts Keys Display cases Goods used in construction Electrical, electromagnetic and mechanical treatment Electricity Architectural, construction, engineering and inspection services Security, fire-fighting, police and defence equipment Transformers Cable TV Designs Manuals Dates Tools, locks, keys, hinges, fasteners, chain and springs
UNSPSC
Netting Post Bolts Nuts Inverters pH meters Q Meters Display cases Awards Utilities Project management Distribution Well engineering Trade agreements Equipment cases Case making services Combiner University Boxes Securities Tent, for office use Airport Maps, Networks (GIS), Studies Suction pump, manual Suction pump, electrical Clinical laboratory and toxicology testing systems, components, and supplies Training, Technical: Crew Resource Management, Emergency Procedures, Dangerous Goods Clinical laboratory and toxicology testing systems, components, and supplies
Regions
APEC Countries Asia
Sectors
Civil Works Building Environment and Pollution-Recycling Automobiles and Auto Parts Non-Renewable Energy Supply Solar Photovoltaic PV Energy Stainless Steel and Galvanized Security Services Light and Lighting Products Bridges and Tunnels Engineering Energy Postal and Courier Services Roads and Highways-Bridge Infrastructure Law and Legal Printing and Publishing Railways-Rail-Railroad Education and Training Defence and Security Electricity Construction Energy-Power and Electrical Computer Hardwares and Consumables Steel Industry Aviation Petroleum Products Building Material Marine
URL
Share
To be notified
when a tender matching your filter is published
To Follow
Tenders
Add New Tender Alert
To Follow
Contracts
Add New Contract Alert
To Follow
Fairs
Add New Fair Alert