Sign up now to have the right to view
50 tenders for free.
Title |
Manchester Airport Piling ECI Tender Notice Open |
|||
---|---|---|---|---|
You can sign up and unlock it for freeAccess to Public and Private Sector Business Opportunities for 200+ Countries |
||||
Country | ||||
Language | English | |||
Organization | ||||
Published Date | 04.10.2024 | |||
Deadline Date | 11.10.2024 | |||
Overview |
Manchester Airport Piling ECI The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. Kier are seeking expressions of interest for early contractor engagement in relation to the piling works at Manchester Airport. The piling package will consist of a 350m contiguous pile retaining wall of 900mm diameter CFA piles to a depth of up to 18m. The ECI works shall consist of: - Piling Rig Type (We have currently assumed SR95) - Piling duration (No of piles per day) - Working area required around the rig due to site constraints - Understanding of key risks and mitigations to comply with Network Rail Standard NR L3 CIV 0063 Issue 2 - Temporary Works requirements - Piling Matt - Working in the vicinity of buried services - Pile deflection - A review of any similar example projects Lessons Learnt Intent to award ECI contract to support a main consultant designing these works and ultimately leading to the installation works. Kier Infrastructure and Overseas Limited - CP7 NWC 2nd Floor Optimum House M503XP, Clippers Quay mark.thompson@kier.co.uk 07880787625 Mark Thompson Tender Notice Open 7f7b5313-a8ac-4954-b122-959bbfabdaf9-791083 United Kingdom ocds-b5fd17-510acff7-1a38-4266-8dce-8cc72efed46f
|
|||
NAICS | ||||
CPVS |
Rolling stock
Iron, lead, zinc, tin and copper
Mains
Networks
Networking, Internet and intranet software development services
Piling
Lead
Pile
Feasibility study, advisory service, analysis
Supports
Networking, Internet and intranet software package
Other services
Keys
Designs
Rails
Tools, locks, keys, hinges, fasteners, chain and springs
|
|||
UNSPSC | ||||
Regions | ||||
Sectors |
Building
Automobiles and Auto Parts
Supply
Airports
Postal and Courier Services
Roads and Highways-Bridge
Infrastructure
Water and Sanitation
Printing and Publishing
Services
Railways-Rail-Railroad
Defence and Security
Electricity
Construction
Consultancy
Energy-Power and Electrical
Computer Hardwares and Consumables
Steel
Industry
Aviation
Building Material
Marine
|
|||
URL | ||||
Share |
Title |
---|
Manchester Airport Piling ECI Tender Notice Open |
Country |
Language |
English |
Organization |
Published Date |
04.10.2024 |
Deadline Date |
11.10.2024 |
Overview |
Manchester Airport Piling ECI The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. Kier are seeking expressions of interest for early contractor engagement in relation to the piling works at Manchester Airport. The piling package will consist of a 350m contiguous pile retaining wall of 900mm diameter CFA piles to a depth of up to 18m. The ECI works shall consist of: - Piling Rig Type (We have currently assumed SR95) - Piling duration (No of piles per day) - Working area required around the rig due to site constraints - Understanding of key risks and mitigations to comply with Network Rail Standard NR L3 CIV 0063 Issue 2 - Temporary Works requirements - Piling Matt - Working in the vicinity of buried services - Pile deflection - A review of any similar example projects Lessons Learnt Intent to award ECI contract to support a main consultant designing these works and ultimately leading to the installation works. Kier Infrastructure and Overseas Limited - CP7 NWC 2nd Floor Optimum House M503XP, Clippers Quay mark.thompson@kier.co.uk 07880787625 Mark Thompson Tender Notice Open 7f7b5313-a8ac-4954-b122-959bbfabdaf9-791083 United Kingdom ocds-b5fd17-510acff7-1a38-4266-8dce-8cc72efed46f |
NAICS |
Navigational Copper Commercial Air Measuring Navigational Copper |
CPVS |
Rolling stock Iron, lead, zinc, tin and copper Mains Networks Networking, Internet and intranet software development services Piling Lead Pile Feasibility study, advisory service, analysis Supports Networking, Internet and intranet software package Other services Keys Designs Rails Tools, locks, keys, hinges, fasteners, chain and springs |
UNSPSC |
Piling Rails House Awards Double room Case making services Airport, Fauna Control Services Airport Maps, Networks (GIS), Studies |
Regions |
Europe Northern Europe |
Sectors |
Building Automobiles and Auto Parts Supply Airports Postal and Courier Services Roads and Highways-Bridge Infrastructure Water and Sanitation Printing and Publishing Services Railways-Rail-Railroad Defence and Security Electricity Construction Consultancy Energy-Power and Electrical Computer Hardwares and Consumables Steel Industry Aviation Building Material Marine |
URL |
Share |
To be notified
when a tender matching your filter is
published
To Follow
Tenders
Add New Tender Alert
To Follow
Contracts
Add New Contract Alert
To Follow
Fairs
Add New Fair Alert
Similar Tenders