Only curious? Unlock 1-Month Premium Free Trial Plan!
Tenders
Total
116
tenders found.
116
tenders are listing.
Maintenance Works at Wien Hütteldorf in the Context of the "Attractivization of the Verbindungsbahn" Project – B21379 – Pipe Jacking at Hütteldorf – ÖBB-Infrastruktur AG
Organization:
***************
Country:
Austria
Deadline:
06.05.2026
Ungerbach Viaduct II: Superstructure Renewal – Civil Engineering Works – ÖBB-Infrastruktur AG
Organization:
***************
Country:
Austria
Deadline:
04.05.2026
AMV005 Stockerau – Retz; Selective Double-Track Expansion – EIA Coordination and Preparation of Selected Specialist Reports (ÖBB-Infrastruktur AG)
Organization:
***************
Country:
Austria
Deadline:
04.05.2026
Delivery of Escalators – ÖBB-Infrastruktur AG
Organization:
***************
Country:
Austria
Deadline:
07.05.2026
Freudenau Leased Port; New Track Construction (Tracks 57a, 58a) and Existing Turnout (W301) — General Contractor — Track Panel Renewal (Tracks 57a + 58a) and Turnout W301 — ÖBB-Infrastruktur AG
Organization:
***************
Country:
Austria
Deadline:
12.05.2026
GKB002: Lieboch – Köflach; GKB; Route Enhancement – Section 2; BAT007: National Border near Jennersdorf – Graz East Station; Electrification & Construction – Local Site Supervision: Kremser Tunnel (BL 30) / Laßnitz Tunnel (BL 2.30); ÖBB-Infrastrukt
Organization:
***************
Country:
Austria
Deadline:
07.05.2026
BAI0.AMV057.01 St. Valentin – Sarmingstein; Line Electrification; Planning – Route Planning (Submission Design incl. BIM). Optional: Tender and Detailed Design incl. BIM. ÖBB-Infrastruktur AG.
Organization:
***************
Country:
Austria
Deadline:
27.04.2026
SAC400, AMV4991402, IMC082 Taufkirchen a.d. Pram; km 56.000–58.040, Construction – Subgrade Improvement, Platform, GTBM ÖBB-Infrastruktur AG
Organization:
***************
Country:
Austria
Deadline:
04.05.2026
SAB8A1: Völs; Track and Turnout Renewal – Accelerated Measures; km 6.528 – 7.386, Construction Execution Planning – ÖBB-Infrastruktur AG
Organization:
***************
Country:
Austria
Deadline:
24.04.2026
BAI0.SAC427 Pregarten – Kefermarkt; Bridge Renewal, km 34.760; Construction – General Building Works (ÖBB-Infrastruktur AG)
Organization:
***************
Country:
Austria
Deadline:
27.04.2026
IMC086; Aurachkirchen; Construction of Barrier-Free Platform; Construction – Platform Renewal and Subgrade Improvement – ÖBB-Infrastruktur AG
Organization:
***************
Country:
Austria
Deadline:
04.05.2026
Civil Engineering Services – Platform Renewal and Noise Protection (GN), incl. Preliminary Services (PLV) – Maria Ellend to Petronell-Carnuntum, km 29.28–29.50; km 36.52–36.96; km 38.04–38.77 (Projects IMC054/SAC335/SAV357) – Civil Engineering Servic
Organization:
***************
Country:
Austria
Deadline:
06.05.2026
SAB589 – Salzburg Main Station; Track Renewal (Tracks 203 & 205), km 0.524–1.117 — Construction: Track Renewal (Tracks 203 & 205), Superstructure and Substructure — ÖBB-Infrastruktur AG
Organization:
***************
Country:
Austria
Deadline:
27.04.2026
Fritzens-Wattens 2 Junction – I 1 Junction (Gärberbach Junction); Inn Valley Tunnel Reinvestment (BBT SE), Planning – Inn Valley Tunnel – ÖBB – §31a Expert Opinions and §34b Audit Reports (ÖBB-Infrastruktur AG)
Organization:
***************
Country:
Austria
Deadline:
23.04.2026
Feldkirch; Renewal of Membrane Roofs — Construction, Provision, and Operation (Overhead Line Systems) — ÖBB-Infrastruktur AG
Organization:
***************
Country:
Austria
Deadline:
17.04.2026
(ProVia ID 145743) Enhancement of the Connecting Line; Civil Engineering Works – Northern Section – Connecting Line – ÖBB-Infrastruktur AG
Organization:
***************
Country:
Austria
Deadline:
20.04.2026
GKB002: Lieboch – Köflach; GKB; Route Enhancement – Section 2 (GKB002); Construction Lot 20: Bridge Construction 2027 – ÖBB-Infrastruktur AG
Organization:
***************
Country:
Austria
Deadline:
07.05.2026
Photovoltaics Expansion Plan; on Third-Party Land 2025–2026 — Planning and Construction of a 16.7 Hz Railway Power Supply Ground-Mounted Photovoltaic System with Battery Storage — ÖBB-Infrastruktur AG
Organization:
***************
Country:
Austria
Deadline:
21.04.2026
Bird Protection, Bird and Small Animal Deterrents – ÖBB-Infrastruktur AG
Organization:
***************
Country:
Austria
Deadline:
N/A
Framework Agreement for Electrical Installation Cables – ÖBB-Infrastruktur AG
Organization:
***************
Country:
Austria
Deadline:
21.04.2026
Last 10 Contract Award