Sign up now to have the right to view
50 tenders for free.
Title |
Construction of 35-Head Dairy Cattle Shed with Calf Pen (Loose Housing) for NMD NATIONAL DAIRY AUTHORITY - REGION X |
|||
---|---|---|---|---|
You can sign up and unlock it for freeAccess to Public and Private Sector Business Opportunities for 200+ Countries |
||||
Country | ||||
Language | English | |||
Organization | ||||
Published Date | 12.10.2024 | |||
Deadline Date | 04.11.2024 | |||
Overview |
Construction of 35-Head Dairy Cattle Shed with Calf Pen (Loose Housing) for NMD Invitation to Bid (ITB) Reference Number 11354172 Procuring Entity NATIONAL DAIRY AUTHORITY - REGION X Title Construction of 35-Head Dairy Cattle Shed with Calf Pen (Loose Housing) for NMD Area of Delivery Surigao Del Sur Printable Version Solicitation Number: NDA-24-10-199-NMD Trade Agreement: Implementing Rules and Regulations Procurement Mode: Public Bidding Classification: Goods Category: Construction Projects Approved Budget for the Contract: PHP 3,000,000.00 Delivery Period: 60 Day/s Client Agency: Contact Person: Loribel Cagatan BAC Secretariat Growing Child School, Maandig Avenue, Mandumol Macasandig,Cagayan de Oro City Cagayan De Oro City Misamis Oriental Philippines 9000 63-88-3282346 NMDmail@nda.da.gov.ph Status Active Associated Components Order Bid Supplements 0 Document Request List 0 Date Published 12/10/2024 Last Updated / Time 12/10/2024 12:00 AM Closing Date / Time 04/11/2024 10:00 AM Description Project Title CONSTRUCTION OF 35-HEAD DAIRY COW SHED WITH CALF PEN I. Background The Project is a Dairy Cattle Establishment to be implemented in the Municipality of San Miguel, Province of Surigao del Sur, to promote and increase the milk production and support dairy farming in the area. The attached architectural and structural design shall serve as the construction drawings, and will serve as the contractor’s reference on the electrical and plumbing/sanitary design. The plans shall consist of Architectural Design (from the TWG), Structural Design (from the TWG), Electrical Design and Sanitary/Plumbing Design. The shed shall be designed for different earthquake zones, wind loads, and soil-bearing capacities. This should also be in accordance with all the applicable Codes of the Philippines. II. Objective The objective of this project is to hire an Engineering and Construction Firm to construct the shed in accordance with the design and plans including the program of works, detailed estimates for the Bill of Quantities, and other documents needed in construction and securing permits, if applicable. III. Scope of Work 1. Contract Documents 1.1 The contractor is responsible for producing comprehensive construction drawings and specifications based on the approved design documents, outlining in detail the necessary work for both the Electrical and Sanitary/Plumbing systems. 1.2 The contractor shall furnish the end-user complete sets of signed and sealed program of works, construction drawings, material specifications, and general conditions. 1.3 The contractor shall be responsible for securing permits and other clearances, if applicable. Our quality management system is certified according to ISO 9001 2. Construction Phase 2.1 The contractor shall be fully responsible for the mobilization and demobilization, supervision, labor, materials, tools and equipment including utilities needed to complete all the works. These shall include the preparations, accessories and consumables necessary to complete the project. The scope includes, but not limited to, the following: I. CIVIL WORKS • Site Preparation; Clearing and Grubbing of the area • Site Excavation and Backfilling to attain proposed elevation. Proper compaction of the area shall be observed. • Structural Excavation and Backfilling II. STRUCTURAL WORKS • Supply, delivery, fabrication and installation of Formworks including accessories • Supply, delivery, fabrication and installation of Reinforcing Steel Bars • Supply, delivery and pouring of all concrete works including clearing and disposal of waste concrete mix • Supply, delivery, fabrication and installation of Structural Steel. Full welding shall be observed for all the welded connections. • Supply, delivery, fabrication and installation of all Metal Works and Railings. Full welding shall be observed for all the welded connections. III.ROOFING WORKS • Supply, delivery and installation of Roofing including all the accessories as per required by the plans. IV.ELECTRICAL WORKS • Supply, delivery and installation including commissioning and testing V. PLUMBING AND SANITARY WORKS • Supply, delivery and installation of Clean Water System, Waste Water System and Drainage System of the facility VI. MISCELLANEOUS WORKS • Supply, delivery and fabrication/installation of miscellaneous items included in the drawing and documents 2.2 The contractor shall ensure the implementation and compliance of all works indicated in the approved construction drawings and documents. All revisions and deviations from the approved plans, especially if it shall impact the overall cost of the project, shall be subject to the approval of the Technical Working Group (TWG) and the End-user. 2.3 The contractor shall provide necessary soil filling, soil grading, and other soil preparation and protection measures for the construction. 2.4 Coordinates with the TWG and the end-user regarding the scheduling of delivery and installation of all materials and equipment during construction. 2.5 Rectifies punch-listing works to be inspected by the TWG IV. Expected Outputs 1. Design Plans (Electrical, Plumbing and Sanitary) 2. Final Design drawings in a standard size tracing paper signed and sealed by professionals and other qualified approving authorities. 3. Provide five (5) sets of blueprint signed and sealed. 4. CAD files 5. Technical specifications signed and sealed by design professionals 6. Design analysis 7. Program of works and detailed cost estimates 8. Construction schedule, S – Curve and Pert – CPM Standard Requirements: 1. Technical outputs and/or project documentation shall conform to the standards, content, and/or requirements of the National Building Code, National Structural Code of the Philippines, Philippine Electrical Code, National Plumbing Code of the Philippines, Philippines Mechanical Engineering Code and Fire Code of the Philippines and other related codes applicable in the execution of the project. 2. Progress reports are reportorial requirements for monitoring the project. 3. The Technical Working Group (TWG) assigned to the project shall issue a Certificate of Acceptance for the required deliverables per scope of work. V. Project Duration All works shall be completed within a period of 60 calendar days from the date of issuance of the Notice to Proceed (NTP). VI. Project Site Municipality of San Miguel, Surigao del Sur VII. Implementing Agency National Dairy Authority – Northern Mindanao Department VIII. Layout Attached Architectural and Structural Plans for Contractor’s reference for the Electrical and Plumbing/Sanitary design. Note: Any vague details to the architectural design, structural design and terms of reference shall be consulted to the designer prior to construction. Any errors identified during progress inspection shall be rectified without additional contract cost. Pre-bid Conference Date Time Venue 21/10/2024 3:30 PM NATIONAL DAIRY AUTHORITY - REGION X Growing Child School, Maandig Avenue, Mandumol Macasandig,Cagayan de Oro City Other Information Please download RFQ online thru the associated component under the Bid Notice Abstract Created by Loribel Cagatan Date Created 11/10/2024 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. NATIONAL DAIRY AUTHORITY - REGION X
|
|||
NAICS |
Soil Preparation
Nonferrous Metal (except Copper and Aluminum) Rolling
Business
All Other Professional
Instruments and Related Products Manufacturing for Measuring
Asphalt Paving
Navigational
Professional
Justice
Nonferrous Metal (except Copper and Aluminum) Rolling
Regulation
Roofing
Regulation and Administration of Communications
Religious
Plumbing
Justice
Other Professional
Copper Rolling
Automotive Parts
Construction
Architectural
Pulp
Scenic and Sightseeing Transportation
Other Justice
Copper Rolling
Machinery
Regulation
Other Aluminum Rolling
Roofing
Regulation and Administration of Communications
Measuring
Agriculture
Plumbing
Navigational
Research and Development in the Physical
Photographic Film
Other Similar Organizations (except Business
All Other Professional
Management
Other Justice
Other Similar Organizations (except Business
Agencies
Research and Development in the Physical
Water
Construction
Professional
Metal Can
|
|||
CPVS |
Welding
Tools
Earthmoving and excavating machinery, and associated parts
Calves
System, storage and content management software package
Site preparation work
Architectural, engineering and planning services
Calendars
Construction, foundation and surface works for highways, roads
Engineering, auxiliary, average, loss, actuarial and salvage insurance services
Wheels, parts and accessories
Fabrication work
Architectural, engineering and surveying services
Structural works
Wells construction work
Cattle, livestock and small animals
Feasibility study, advisory service, analysis
Document creation, drawing, imaging, scheduling and productivity software package
Seals
Business services: law, marketing, consulting, recruitment, printing and security
Permits
Construction work
Machinery for cleaning, filling, packing or wrapping bottles or other containers
Supports
Document creation, drawing, imaging, scheduling and productivity software development services
Concrete
Plumbing and sanitary works
Paper, printing and bookbinding machinery and parts
System, storage and content management software development services
Blueprints
Concrete work
Parts of dishwashing machines and of machines for cleaning, filling, packing or wrapping
Rings, seals, bands, sticks and grout packers
Monitors
Bars, rods, wire and profiles used in construction
Soil
Steel
Bars
Drainage works
Seats, chairs and related products, and associated parts
Curves
Display cases
Approval plans, working drawings and specifications
Goods used in construction
Furnishing
Electrical, electromagnetic and mechanical treatment
Architectural, construction, engineering and inspection services
Cattle
Milk
Designs
Tool parts
Dates
Tools, locks, keys, hinges, fasteners, chain and springs
|
|||
UNSPSC |
Cattle
Soil
Clean room
Curves
Calendars
Display cases
Water
Utilities
Dairying
Inspection
Well engineering
Mechanical engineering
Bars
Trade agreements
Equipment cases
Felt pen
Tracing paper
Seals
High school
Water, sanitation and hygiene kits
Water, sanitation and hygiene kit
Direction Finding Equipment, Accessories
Water, sanitation and hygiene kits
Suction pump, electrical
Clinical laboratory and toxicology testing systems, components, and supplies
Humanitarian Relief Items, Kits, or Accessories
Clinical laboratory and toxicology testing systems, components, and supplies
|
|||
Regions | ||||
Sectors |
Civil Works
Building
Environment and Pollution-Recycling
Automobiles and Auto Parts
Non-Renewable Energy
Supply
Solar Photovoltaic PV Energy
Architecture
Engineering
Postal and Courier Services
Roads and Highways-Bridge
Oil and Gas
Infrastructure
Water and Sanitation
Printing and Publishing
Railways-Rail-Railroad
Metals and Non-Metals
Defence and Security
Electricity
Construction
Energy-Power and Electrical
Computer Hardwares and Consumables
Steel
Aviation
Building Material
Marine
|
|||
URL | ||||
Share |
Title |
---|
Construction of 35-Head Dairy Cattle Shed with Calf Pen (Loose Housing) for NMD NATIONAL DAIRY AUTHORITY - REGION X |
Country |
Language |
English |
Organization |
Published Date |
12.10.2024 |
Deadline Date |
04.11.2024 |
Overview |
Construction of 35-Head Dairy Cattle Shed with Calf Pen (Loose Housing) for NMD Invitation to Bid (ITB) Reference Number 11354172 Procuring Entity NATIONAL DAIRY AUTHORITY - REGION X Title Construction of 35-Head Dairy Cattle Shed with Calf Pen (Loose Housing) for NMD Area of Delivery Surigao Del Sur Printable Version Solicitation Number: NDA-24-10-199-NMD Trade Agreement: Implementing Rules and Regulations Procurement Mode: Public Bidding Classification: Goods Category: Construction Projects Approved Budget for the Contract: PHP 3,000,000.00 Delivery Period: 60 Day/s Client Agency: Contact Person: Loribel Cagatan BAC Secretariat Growing Child School, Maandig Avenue, Mandumol Macasandig,Cagayan de Oro City Cagayan De Oro City Misamis Oriental Philippines 9000 63-88-3282346 NMDmail@nda.da.gov.ph Status Active Associated Components Order Bid Supplements 0 Document Request List 0 Date Published 12/10/2024 Last Updated / Time 12/10/2024 12:00 AM Closing Date / Time 04/11/2024 10:00 AM Description Project Title CONSTRUCTION OF 35-HEAD DAIRY COW SHED WITH CALF PEN I. Background The Project is a Dairy Cattle Establishment to be implemented in the Municipality of San Miguel, Province of Surigao del Sur, to promote and increase the milk production and support dairy farming in the area. The attached architectural and structural design shall serve as the construction drawings, and will serve as the contractor’s reference on the electrical and plumbing/sanitary design. The plans shall consist of Architectural Design (from the TWG), Structural Design (from the TWG), Electrical Design and Sanitary/Plumbing Design. The shed shall be designed for different earthquake zones, wind loads, and soil-bearing capacities. This should also be in accordance with all the applicable Codes of the Philippines. II. Objective The objective of this project is to hire an Engineering and Construction Firm to construct the shed in accordance with the design and plans including the program of works, detailed estimates for the Bill of Quantities, and other documents needed in construction and securing permits, if applicable. III. Scope of Work 1. Contract Documents 1.1 The contractor is responsible for producing comprehensive construction drawings and specifications based on the approved design documents, outlining in detail the necessary work for both the Electrical and Sanitary/Plumbing systems. 1.2 The contractor shall furnish the end-user complete sets of signed and sealed program of works, construction drawings, material specifications, and general conditions. 1.3 The contractor shall be responsible for securing permits and other clearances, if applicable. Our quality management system is certified according to ISO 9001 2. Construction Phase 2.1 The contractor shall be fully responsible for the mobilization and demobilization, supervision, labor, materials, tools and equipment including utilities needed to complete all the works. These shall include the preparations, accessories and consumables necessary to complete the project. The scope includes, but not limited to, the following: I. CIVIL WORKS • Site Preparation; Clearing and Grubbing of the area • Site Excavation and Backfilling to attain proposed elevation. Proper compaction of the area shall be observed. • Structural Excavation and Backfilling II. STRUCTURAL WORKS • Supply, delivery, fabrication and installation of Formworks including accessories • Supply, delivery, fabrication and installation of Reinforcing Steel Bars • Supply, delivery and pouring of all concrete works including clearing and disposal of waste concrete mix • Supply, delivery, fabrication and installation of Structural Steel. Full welding shall be observed for all the welded connections. • Supply, delivery, fabrication and installation of all Metal Works and Railings. Full welding shall be observed for all the welded connections. III.ROOFING WORKS • Supply, delivery and installation of Roofing including all the accessories as per required by the plans. IV.ELECTRICAL WORKS • Supply, delivery and installation including commissioning and testing V. PLUMBING AND SANITARY WORKS • Supply, delivery and installation of Clean Water System, Waste Water System and Drainage System of the facility VI. MISCELLANEOUS WORKS • Supply, delivery and fabrication/installation of miscellaneous items included in the drawing and documents 2.2 The contractor shall ensure the implementation and compliance of all works indicated in the approved construction drawings and documents. All revisions and deviations from the approved plans, especially if it shall impact the overall cost of the project, shall be subject to the approval of the Technical Working Group (TWG) and the End-user. 2.3 The contractor shall provide necessary soil filling, soil grading, and other soil preparation and protection measures for the construction. 2.4 Coordinates with the TWG and the end-user regarding the scheduling of delivery and installation of all materials and equipment during construction. 2.5 Rectifies punch-listing works to be inspected by the TWG IV. Expected Outputs 1. Design Plans (Electrical, Plumbing and Sanitary) 2. Final Design drawings in a standard size tracing paper signed and sealed by professionals and other qualified approving authorities. 3. Provide five (5) sets of blueprint signed and sealed. 4. CAD files 5. Technical specifications signed and sealed by design professionals 6. Design analysis 7. Program of works and detailed cost estimates 8. Construction schedule, S – Curve and Pert – CPM Standard Requirements: 1. Technical outputs and/or project documentation shall conform to the standards, content, and/or requirements of the National Building Code, National Structural Code of the Philippines, Philippine Electrical Code, National Plumbing Code of the Philippines, Philippines Mechanical Engineering Code and Fire Code of the Philippines and other related codes applicable in the execution of the project. 2. Progress reports are reportorial requirements for monitoring the project. 3. The Technical Working Group (TWG) assigned to the project shall issue a Certificate of Acceptance for the required deliverables per scope of work. V. Project Duration All works shall be completed within a period of 60 calendar days from the date of issuance of the Notice to Proceed (NTP). VI. Project Site Municipality of San Miguel, Surigao del Sur VII. Implementing Agency National Dairy Authority – Northern Mindanao Department VIII. Layout Attached Architectural and Structural Plans for Contractor’s reference for the Electrical and Plumbing/Sanitary design. Note: Any vague details to the architectural design, structural design and terms of reference shall be consulted to the designer prior to construction. Any errors identified during progress inspection shall be rectified without additional contract cost. Pre-bid Conference Date Time Venue 21/10/2024 3:30 PM NATIONAL DAIRY AUTHORITY - REGION X Growing Child School, Maandig Avenue, Mandumol Macasandig,Cagayan de Oro City Other Information Please download RFQ online thru the associated component under the Bid Notice Abstract Created by Loribel Cagatan Date Created 11/10/2024 The PhilGEPS team is not responsible for any typographical errors or misinformation presented in the system. PhilGEPS only displays information provided for by its clients, and any queries regarding the postings should be directed to the contact person/s of the concerned party. NATIONAL DAIRY AUTHORITY - REGION X |
NAICS |
Soil Preparation Nonferrous Metal (except Copper and Aluminum) Rolling Business All Other Professional Instruments and Related Products Manufacturing for Measuring Asphalt Paving Navigational Professional Justice Nonferrous Metal (except Copper and Aluminum) Rolling Regulation Roofing Regulation and Administration of Communications Religious Plumbing Justice Other Professional Copper Rolling Automotive Parts Construction Architectural Pulp Scenic and Sightseeing Transportation Other Justice Copper Rolling Machinery Regulation Other Aluminum Rolling Roofing Regulation and Administration of Communications Measuring Agriculture Plumbing Navigational Research and Development in the Physical Photographic Film Other Similar Organizations (except Business All Other Professional Management Other Justice Other Similar Organizations (except Business Agencies Research and Development in the Physical Water Construction Professional Metal Can |
CPVS |
Welding Tools Earthmoving and excavating machinery, and associated parts Calves System, storage and content management software package Site preparation work Architectural, engineering and planning services Calendars Construction, foundation and surface works for highways, roads Engineering, auxiliary, average, loss, actuarial and salvage insurance services Wheels, parts and accessories Fabrication work Architectural, engineering and surveying services Structural works Wells construction work Cattle, livestock and small animals Feasibility study, advisory service, analysis Document creation, drawing, imaging, scheduling and productivity software package Seals Business services: law, marketing, consulting, recruitment, printing and security Permits Construction work Machinery for cleaning, filling, packing or wrapping bottles or other containers Supports Document creation, drawing, imaging, scheduling and productivity software development services Concrete Plumbing and sanitary works Paper, printing and bookbinding machinery and parts System, storage and content management software development services Blueprints Concrete work Parts of dishwashing machines and of machines for cleaning, filling, packing or wrapping Rings, seals, bands, sticks and grout packers Monitors Bars, rods, wire and profiles used in construction Soil Steel Bars Drainage works Seats, chairs and related products, and associated parts Curves Display cases Approval plans, working drawings and specifications Goods used in construction Furnishing Electrical, electromagnetic and mechanical treatment Architectural, construction, engineering and inspection services Cattle Milk Designs Tool parts Dates Tools, locks, keys, hinges, fasteners, chain and springs |
UNSPSC |
Cattle Soil Clean room Curves Calendars Display cases Water Utilities Dairying Inspection Well engineering Mechanical engineering Bars Trade agreements Equipment cases Felt pen Tracing paper Seals High school Water, sanitation and hygiene kits Water, sanitation and hygiene kit Direction Finding Equipment, Accessories Water, sanitation and hygiene kits Suction pump, electrical Clinical laboratory and toxicology testing systems, components, and supplies Humanitarian Relief Items, Kits, or Accessories Clinical laboratory and toxicology testing systems, components, and supplies |
Regions |
APEC Countries Asia |
Sectors |
Civil Works Building Environment and Pollution-Recycling Automobiles and Auto Parts Non-Renewable Energy Supply Solar Photovoltaic PV Energy Architecture Engineering Postal and Courier Services Roads and Highways-Bridge Oil and Gas Infrastructure Water and Sanitation Printing and Publishing Railways-Rail-Railroad Metals and Non-Metals Defence and Security Electricity Construction Energy-Power and Electrical Computer Hardwares and Consumables Steel Aviation Building Material Marine |
URL |
Share |
To be notified
when a tender matching your filter is
published
To Follow
Tenders
Add New Tender Alert
To Follow
Contracts
Add New Contract Alert
To Follow
Fairs
Add New Fair Alert
Similar Tenders